Records from 2017 to 2026. Most recent: inspection, 4 June 2026.
Inspection history · 35
4 June 2026
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8393028
12 February 2026
Annual Inspection · Vessel Attendance · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8310128
2 July 2025
Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8172751
1 July 2025
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8193911
30 March 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8102119
21 February 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8081990
15 October 2024
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8019337
23 April 2024
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7899710
21 November 2023
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7828344
2 September 2023
Damage Survey · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7784514
29 August 2023
Administrative Inspection · In-Service Inspection · USCG Audit
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7780750
12 April 2023
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7668293
8 April 2023
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7665123
2 November 2022
Internal Structural Exam · Drydock Exam · Plan Review (Other than "T")
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7587982
7 October 2022
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7572311
6 April 2022
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7426135
18 March 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7414372
14 June 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7228747
21 May 2021
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7203485
14 May 2021
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7194660
5 October 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7073192
10 June 2020
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6961956
21 January 2020
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6897853
13 September 2019
In-Service Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6811229
24 April 2019
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6669714
14 December 2018
Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6599174
22 June 2018
In-Service Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6452633
30 May 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6428613
9 March 2018
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6369149
3 January 2018
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6331809
16 October 2017
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6287014
5 June 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6166166
26 May 2017
Administrative Inspection
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6156180
8 May 2017
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6146319
24 April 2017
Initial Certification · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6121540
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 27 March 2026
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or recovery of persons who have fallen overboard. The master shall conduct sufficient fire drills to ensure that each crew member is familiar with his or her duties in case of a fire.
Vessel crew members did not demonstrate adequate proficiency in practically executing the vessel's revised Emergency Evacuation Plan and Abandon Ship Plan during the fire and abandon ship drill (scenario: fire in 5th deck guest laundry that spread to the stairtower) held during the inspection. Additional crew training to be conducted, with follow-on additional fire and abandon ship drills to be carried out to the satisfaction of the attending CG Marine Inspectors.
46 CFR 122.520
46 CFR 122.524
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 April 2026
Resolved 30 March 2026
Resolution: Witnessed additional fire/abandon ship drill, scenario fire on 1st deck IT room adjacent to guest services spreading into the central stairtower.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 March 2026
Resolved
Doors in bulkheads required to be Class A-60...shall be of hollow steel or equivalent metal construction solidly filled with approved structural insulation capable of meeting the requirements for a Class A-15 bulkhead.
Gaskets on fire doors for main laundry and the engine room were found to be missing or deteriorated, leading to these A-class doors not being arranged to prevent passage of flame and smoke as required.
46 CFR 72.05-25 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2026
Resolved 14 April 2026
Resolution: MI witnessed satisfactory installation of gaskets on the main laundry and engine room doors, including verification of proper door operation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 March 2026
Resolved
Waste paper baskets shall be constructed of approved incombustible materials with solid sides and bottoms.
Waste receptacles in the galley, main laundry, and other various locations were made of combustible materials.
46 CFR 116.400(b)
NVIC 9-97 CH-1, Section 2.9.2 (pg37)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2026
Resolved 24 June 2026
Resolution: Vessel provided photo evidence of non combustible waste receptacles.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 27 March 2026
No resolution recorded
Suitable means, such as a manual damper, automatic damper, or vent cover, must be provided in an accessible location outside the space served by the ventilation duct for shutting off the passage of air through the ventilation duct in the event of fire.
Automatic fire damper for the range hood was found inoperable. Vessel engineered temporary fix (slide in plate on the exterior of vessel). Vessel to affect permanent fix at next drydock.
46 CFR 116.610
Action required: 705 - Other - as specified
Due 1 March 2027
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 July 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to:(a) Provide services necessary for safety under normal and emergency conditions. Vsl reported loss of # 2 generator due to faulty speed sensor. Complete satisfactory replacement of speed sensor and repairs, and conduct steering test with affected generator as the power source, with CG marine inspector present. 46CFR120.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 July 2025
Resolution: Speed sensor replaced. Tested steering using #2 generator; all sat.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 4 April 2025
Resolved
Clear instructions must be provided on the vessel that detail the actions each person on board should follow in the event of an emergency. Each muster list must at least specify: (6) the duties assigned to different members of the crew. Duties to be specified include (iii) preparing and launching the survival craft; (7) duties assigned to members of the crew in relation to passengers and other persons on board in case of an emergency. Assigned duties to be specified include: (iii) assembling passengers and other persons on board at muster stations, (iv) controlling the movement of passengers and other persons onboard. The master shall conduct sufficient drills and give sufficient instruction to make sure that all crewmembers are familiar with their duties during emergencies that necessitate abandon ship or recovery of persons who have
fallen overboard.
The station bill/muster list in use at time of the inspection does not assign several key duties to specific persons, and crew response during observed abandon ship and man overboard drills did not fully correspond with the station bill/muster list or passenger safety bill. Examples include (not all inclusive): station bill assigns the mate to “supervise launching of liferafts”, but no persons are assigned to launching of each individual IBA or moving each 50 person IBA from the stowage location to the embarkation station. Only one crewmember posted at embarkation station to direct passengers into IBAs; not the person listed on the station bill. During the drill, passengers directed from muster station to embarkation station and boarding of IBAs by deck, but passenger safety bill assigns specific IBA # based on stateroom; no clear control on specific passengers and/or crew to embark each IBA. Station bill does not have an assigned helmsman during man overboard; the bridge wing conning stations do not have rudder controls; thereby necessitating a helmsman.
Update station bill as appropriate and carry out additional crew training. Subsequently, conduct additional abandon ship drill in presence of attending CG Marine Inspectors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 April 2025
Resolved 15 April 2025
Resolution: Station bill was updated and crew trained on their duties under the updated station bill. CG MI re-attended to observe an additional abandon ship drill.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 April 2025
Resolved
Passageways and stairway enclosures shall contain only
fire resistant furnishings. All free-standing furniture
such as chairs shall be constructed of frames of
approved incombustible materials. In addition, all
upholstery and padding of chairs, sofas, etc. in these areas shall be of approved fire resistant materials.
Upholstered chairs with wooden legs found in the category 2 'vestibule'; no markings found on furniture or documentation presented indicating compliance with these standards. Provide objective evidence that this furniture meets the cited requirements (satisfying the requirements in 46 CFR 116.423 (b) is also acceptable) or remove such furniture from the stairtower.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 April 2025
Resolved 15 April 2025
Resolution: CG MI attended for a deficiency check; at this time all upholstered and wooden furniture had been removed from the main vestibule / stairtower.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 April 2025
Resolved
The following emergency lighting […] must be arranged […]: (d) Illuminated signs with the word “EXIT” in red letters throughout a passenger vessel so the direction of escape to the open deck is obvious from any portion of the vessel usually accessible to the passengers or crew.
Vessel's approved Fire Control Plan has an "EXIT" sign in the 2nd deck forward corridor (just forward of double doors leading into the vestibule), but "EXIT" sign is missing. In the second deck aft corridor (just aft of the vestibule) the "EXIT" sign is inoperative under DC power. Install missing "EXIT" sign, repair the second.
Update 4/15/25: "EXIT" sign in second deck aft corridor has been replaced and is now functioning properly. Due date for installation of "EXIT" sign in second deck forward corridor has been extended to 12/31/25.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 14 April 2026
Resolution: The “EXIT” sign leading forward on the 2nd deck was removed on FCP stamped: 27MAR2026. It was determined that the forward door does not provide access to an escape route and instead leads to a dead-end foc'sle.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 4 April 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel giving consideration to protection against fire.
Sections of vapor barrier covering structural fire protection insulation in category 10 stackhouse space found missing or deteriorated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 15 April 2025
Resolution: Damaged sections of vapor barrier have been repaired/replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 April 2025
Resolved
Accommodation spaces will be considered as including the following spaces: […] staterooms, including passenger and crew rooms. Service spaces will be considered as including the following spaces: […] storerooms. If the use of a space could fit into two or more categories defined in the tables, the type of space with the highest boundary requirements should be used.
Room 119 designated as category 6 accommodation space on approved Fire Control Plan. Space currently being used as supplemental dry stores / storeroom. Existing fire load calculations for "Hull #119 Typical Double Stateroom" are not representative of the current fire load in the space. Demonstrate to the satisfaction of the local OCMI how use of this space will remain consistent with a category 6 accommodation space (vice a category 9 high-risk service space).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2025
Resolved 14 May 2025
Resolution: Received email from port engineer reporting that weight has been removed to below the 1646 lb maximum for this space (from fire load calcs) and storage in this space moving forward will be managed to remain under the 1646 lb limit.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 4 April 2025
Resolved
The following emergency lighting must be arranged: (c) lighting for passageways sufficient to allow crew to find their way to open decks and muster stations with all fire doors closed.
There is no e-light in the category 3 corridor at the exit of the machinery space, dry stores, and galley. Space is virtually pitch black when main power is lost with all fire doors closed. Install an emergency light to sufficiently illuminate the space.
Action required: 705 - Other - as specified
Due 31 December 2025
Resolved 14 April 2026
Resolution: The existing light in the space was connected to the emergency lighting bus. Proper operation of the light was verified during the 2026 annual inspection as part of the emergency lighting verification.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 23 April 2024
Resolved
Nonconducting mats or grating must be provided on the deck in front of each switchboard and, if accessible from the rear, on the deck in the rear of the switchboard.
Observed 01 non conductive matting missing in auxiliary generator room.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 26 April 2024
Resolution: Vessel submitting picture attesting to the proper installation of non conducting matting in required space. All Sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 April 2024
Resolved
A door in a stairtower, stairway and main vertical zone bulkhead must meet the following additional requirement: A door must be of the self-closing type capable of closing against a 3.5 list of the vessel.
Observed fire screen door on 2nd deck passenger embarkation station did not close.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 23 April 2024
Resolved 23 April 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 September 2023
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load. Vessel experienced possible fuel injector issue with port engine and shut engine down. Identify mechanical issue with engine, provide technician report attesting to repairs made to USCG Marine Inspector. 46CFR119.200.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 September 2023
Resolution: Tech installed new ECM on port engine, resolved issue. Ops check good.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2023
Resolved
All relief valves for use on pressure vessels shall be set to a relieve at a pressure which does not exceed the maximum allowable working pressure of the vessel. Relief valve on air receiver found to be set at 150 psi for a vessel with MAWP of 130 psi. Set relief valve to correct psi and provide proof to CG.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2023
Resolved 21 April 2023
Resolution: Pictures received of correct device fitted
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 April 2023
Resolved
Each PFD light must be permanently and legibly marked with the date of manufacture and expiration date. 02 PFD lights found inoperable. All PFDs found missing battery expiration date. Verify proper operation of all PFD lights onboard and devise a plan to track PFD battery expiration dates.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2023
Resolved 14 April 2023
Resolution: VSL provided plan for tracking lifejacket light batteries
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 April 2023
Resolved
At each subsequent inspection for certification the owner/operator shall be prepared to conduct tests of the smoke and fire detection system. Crew room 7 was returning a "trouble smoke" error on the fire panel. Rectify error and conduct test on the detector to confirm proper operation, return proof to CG.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2023
Resolved 14 April 2023
Resolution: Provided proof that AGOW attended vessel and rectified detector error.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 April 2023
Resolved
A door in a stairtower, stairway, and main vertical zone bulkhead must not have a holdback. Holdback discovered on the door leading the pilothouse. Remove holdback and provide proof to the CG.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2023
Resolved 21 April 2023
Resolution: pictures received of holdback removed
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 April 2023
Resolved
A door in a stairtower, stairway, and main vertical zone must be of the self-closing type capable of closing against a 3.5 list of the vessel. Multiple fire screen doors throughout the vessel discovered to be obstructed from closing.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 April 2023
Resolved 12 April 2023
Resolution: Fixed doors same day, all fully closed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 April 2022
Resolved
Vessel must submit evidence of developed safe handling procedures for the operation and storage of potentially hazardous items such as rechargeable batteries.
Vessel must submit evidence of marine firefighting training programs to improve crewmember training and proficiency, including egress training for each member of the crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 May 2022
Resolved 2 December 2022
Resolution: Verified plans and training programs.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 12 April 2022
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that a man overboard drill be held under simulated emergency conditions specified by the inspector. Due to weather conditions, vessel unable to get underway to conduct MOB drill. Conduct MOB drill in presence of Marine Inspector.
46CFR115.808(g)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 26 April 2022
Resolution: Vessel operator provided video proof of MOB drill being conducted while vessel was underway. Marine inspectors were satisfied with performance of drill.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 April 2022
Resolved
All cable and wire must be installed with metal supports not more than 24 inches apart. Wires hanging without adequate metal supports in emergency steering gear room.
46CFR120.340(b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 15 April 2022
Resolution: Provided photographs showing that cable in emergency steering gear room was properly supported.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 April 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect crew from electrical hazards. Multiple dead end wires found on bridge. provide proof that dead end wires have been removed.
46CFR120.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 15 April 2022
Resolution: Vessel operator provided proof to MI that wires were properly capped and no longer an electrical hazard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 April 2022
Resolved
Each life jacket must be marked in clearly visible block capital letters with the vessel name. Multiple life jackets not marked properly. Provide proof that life jackets have been properly marked.
46CFR122.604
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 15 April 2022
Resolution: Provide proof that lifejackets were properly marked.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 12 April 2022
Resolved
Each lighting fixture must comply with 46CFR120.200. Lighting fixture cover in emergency steering gear room not installed to protect crew and vessel from electrical hazrads. Ensure lighting fixture cover is properly installed and provide proof to marine inspector.
46CFR120.401
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 15 April 2022
Resolution: Provided proof that lighting fixture cover was installed properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 April 2022
Resolved
Each generator prime mover must have an overspeed device. Vessel operator unable to perform overspeed test on final emergency power source (Kohler). Provide technician report for overspeed test to Sector Puget Sound.
46CFR111.12-1(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 10 May 2022
Resolution: Vessel provided objective evidence of the installed overspeed protection device and required setting for final source of power genset.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 May 2021
Resolved
Repair fire pump in way of excessive leak located in the engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 May 2021
Resolved 20 May 2021
Resolution: Vessel rep demonstrated fire pump operational.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 May 2021
Resolved
Vessel needs proper installation of structural fire protection in accordance with fire safety plan. Replace missing structural fire protection over the stern thruster located in the CO2 room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 14 June 2021
Resolution: Installed rockwool in locations missing structural fire protection, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 May 2021
Resolved
Repair ground on number two generator.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 12 April 2022
Resolution: Number 2 generator properly operating, no ground fault detected during inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 14 May 2021
Resolved
All escape hatches must be marked on both sides "EMERGENCY EXIT, KEEP CLEAR". Properly mark egress hatches in way of steering gear and CO2 room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 14 June 2021
Resolution: Installed proper signage, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 May 2021
Resolved
Vessel needs proper installation of structural fire protection in accordance with fire safety plan. Repair modified structural fire protection in way of number one forward bow thruster.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 14 June 2021
Resolution: Installed new rockwool, structural fire protection renewed. All sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 14 May 2021
Resolved
Remote shut-off stations must be marked. Replace missing fuel shut-off placard for the emergency generator room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 14 June 2021
Resolution: Fuel shutoff placards installed, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 May 2021
Resolved
Non-metallic flexible hose assemblies must meet the requirements of subchapter F, 46 CFR 56.60-25. Replace the non-metallic flexible hose installed in way of the fire pump.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 17 May 2021
Resolution: Vessel rep showed proof of removal of non-metallic hose.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 14 May 2021
Resolved
General alarm system must meet the requirements of Subchapter J, 46 CFR 113.25. Each alarm signal must be marked in accordance with 46 CFR 113.25-20(d). Provide a general alarm placard in way of the bell in the emergency generator room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 14 June 2021
Resolution: General alarm placard installed, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 May 2021
Resolved
Multiple fire doors throughout vessel found to exceed 1/8 inch gap.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 12 April 2022
Resolution: Marine inspectors observed plates installed to reduce gap. Fire door operation all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 14 May 2021
Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart. Power cord for LAUNCH 9 was not properly supported.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 12 April 2022
Resolution: Metal supports observed for power cord for Launch 9 during COI Inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 14 May 2021
Resolved
Ladders provided to aid escape must be suitable for use in emergency conditions, unless they can be folded, yet brought into immediate service in an emergency. Ladder in crew berthing used as emergency escape was not easily accessible. Leave ladder in the lowered position.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 14 June 2021
Resolution: Crew berthing ladder is now secured in the lowered position at all times, all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 June 2020
Resolved
Unable to witness man overboard/fire/abandon ship drills because of full crew not being in attendance due to COVID-19. Vessel required to conduct drills in presence of USCG Marine Inspector prior to the carriage of passengers.
46 CFR 122.520 & 524
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 July 2020
Resolved 14 May 2021
Resolution: Witnessed drills during Annual inspection date 14MAY2021. Discrep cleared.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 10 October 2019
Resolved
Machinery bulkhead are required to be A-0 and machinery decks are required to be A-60 class. Several bulkheads and decks in the engine room were missing the required insulation to qualify them as the proper fire protection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 November 2019
Resolved 24 October 2019
Resolution: Insulation replaced as designed for the fire protection of the boundary.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 October 2019
Resolved
No more than 55 gallons of combustible liquids may be stowed in any machinery space. Approximately 40 5 gallon buckets of oil were stored in the engine room.
Action required: 10 - Deficiency Rectified
Due 9 November 2019
Resolved 10 October 2019
Resolution: Buckets removed from the engine room, brining the amount under the 55 gallon maximum.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 21 May 2019
Resolved
Chemical testing of personnel must be conducted as required by 46 CFR 16 and in accordance with the procedures detailed in 49 CFR 40. The crew was unfamiliar with the Designated Employer Representative, EAP hotline number was not on board, the company's drug and alcohol policy and the 2018 MIS report were not available for inspection.
Prior to departing, master obtained EAP hotline number and obtained a copy of the company's drug and alcohol policy.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 June 2019
Resolution: Completed DAPI audit.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 21 May 2019
Resolved
A vessel of more than 65' in length with overnight accommodations for more than 49 passengers must comply with the requirements of 78.13 in subchapter H of this chapter in regards to the content of a station bill, the duties of the crew, emergency signals, an emergency squad, and instructions...when required more than four crew members, must set forth the special duties and duty station of each crew member for various emergencies. Some crew members were not identified on the station bill.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2019
Resolved 7 June 2019
Resolution: Station bill was posted appropriately.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 April 2019
Resolved
Each control system for main and auxiliary steering gear and each power actuating system must restart automatically when electrical power is restored after it has failed. CG Marine Inspector observed the following placard in the pilot house at the steering control panel "If hotel power is switched between generators while underway, steering pumps will need to be restarted." Once voltage is restored to steering motor controller, the motor must resume operation on its own, designed with low voltage release.
Action required: 705 - Other - as specified
Due 7 December 2019
Resolved 10 June 2020
Resolution: Witnessed system automatically restart, deficiency cleared.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 5 June 2017
Resolved
Vessel does not have an approved nontank vessel response plan. Provide copy of approval letter. 33CFR155.5015
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 5 July 2017
Resolved 7 July 2017
Resolution: Non-Tank Vessel Response Plan approved and authorized for Boston AOR.