Records from 2016 to 2026. Most recent: inspection, 15 January 2026.
Inspection history · 14
15 January 2026
PSC B · COC-GAS Renew · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8296828
10 November 2024
COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8026912
5 October 2023
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7803909
8 September 2023
PSC B · COC-GAS Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7778498
14 January 2022
Administrative Inspection · COC-GAS Annual · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7380458
29 April 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7185459
3 December 2020
COC-GAS Renew · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7105717
11 November 2019
ISPS II Exam · Ballast Water Examination · COC-GAS Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6851743
6 May 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6678143
9 November 2018
Ballast Water Examination · Deficiency Check · COC-GAS Renew · Administrative Inspection · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6574648
2 October 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6553067
21 June 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6451537
12 December 2017
Ballast Water Examination · ISPS II Exam · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6320005
7 November 2016
COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6035422
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 8 September 2023
Resolved
Condensate line relief valve C734 was found to have silicone applied to the flange to prevent leaking.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2023
Resolved 15 September 2023
Resolution: Class Report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 November 2019
Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products. Remote control push button electrical panel for cooling FW pumps, Reliq plant and IGG reliq plant was not insulated/EX in compressor room.
Action required: 10 - Deficiency Rectified
Due 11 November 2019
Resolved 11 November 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 6 May 2019
Resolved
01 04114 74SOLAS (2004) II-1/43.1.1 17AC A SELF-CONTAINED EMERGENCY SOURCE OF ELECTRIAL POWER SHALL BE PROVIDED. THE VESSEL REPORTED ITS SECONDARY MEANS OF STARTING THE EMERGENCY GENERATOR IS MALFUNCTIONING.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2019
Resolution: Vessel provided class report
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 9 November 2018
Resolved
On ships carrying flammable products, a water spray system for cooling, fire prevention, and crew protection shall be installed to cover boundaries of cargo compressor rooms and cargo pump-rooms facing the cargo area. The system should be capable of covering these areas with a uniformly distributed water spray system of at least 4 L/m2 per minute for vertical surfaces.
During operational test of deck water spray system, PSCOs observed 25 nozzles on exterior of compressor/motor room with no water flow or water dribbling out. PSCOs observed an additional 17 nozzles with jet-type flow that does not provide adequate or uniform coverage.
74 SOLAS 14 VII/13.1 REF IGC 93/11.3
17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 November 2018
Resolution: Received report from classNK attesting to proper operability of water spray system.