NATIONAL GEOGRAPHIC VENTURE
Passenger (Inspected) · Passenger Ship class · Built 2010s · USCG Southwest District (CGD-SW) · Other hulls named NATIONAL GEOGRAPHIC VENTURE
NATIONAL GEOGRAPHIC VENTURE is a 2018 passenger vessel (inspected). The Coast Guard has recorded 30 inspections since 2017, most recently in March 2026, along with 46 deficiencies, 2 operational controls and 2 casualty investigations between 2022 and 2024.
Records from 2017 to 2026. Most recent: inspection, 18 March 2026.
- Built
- 2018
- Last inspected
- 18 March 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 46 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 2 investigations · 2022–2024
Identity
1276955
9799044 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDK4393
1381760
Flag
UNITED STATES
369358000
Maury page id
psix-1381760
Inspections, by type
…with no type recorded3
Years with a record
9 calendar years (2017–2026)
The 30 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)202.2 ft × 44.0 ft × 16.5 ft
Registered tonnagegross 95 / net 64
ITC dimensions (L × B × D)202.2 ft × 44.0 ft × 16.5 ft
ITC tonnagegross 2,920 / net 876
BuilderICE FLOE LLC · FREELAND, WA, UNITED STATES · built 2018
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSEATTLE, WA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 1 September 2026 · expires 30 September 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2920 - Convention (Subpart B), Gross Ton
95 - Regulatory (Subpart C or D), Gross Ton
876 - Convention (Subpart B), Net Ton
64 - Regulatory (Subpart C or D), Net Ton
95 - Regulatory (Subpart C or D), Gross Ton
876 - Convention (Subpart B), Net Ton
64 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDK4393MMSI 369358000 · active · compulsorily equipped · granted 14 August 2018, expires 14 August 2028
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 30
18 March 2026
Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8328337
12 November 2025
Drydock Exam · Deficiency Check · COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8257689
2 December 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8042331
2 December 2024
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8042759
26 November 2024
COI Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8036389
8 November 2024
Underwater Inspection in lieu of Drydock
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7964540
6 July 2024
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7951106
8 June 2024
In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7930573
26 April 2024
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7903670
23 April 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7900410
29 November 2023
Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7830041
12 November 2023
Deficiency Check · Deadweight Survey · Internal Structural Exam · Drydock Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7829871
13 May 2023
Administrative Inspection · Damage Survey · Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7687612
8 January 2023
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7637824
14 November 2022
Drydock Exam · Administrative Inspection · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7598219
31 July 2022
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7520676
30 July 2022
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7877873
17 March 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7416462
18 November 2021
Deficiency Check · COI Inspection · Internal Structural Exam · MTSA/ISPS Verification
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7349415
15 November 2021
Underwater Inspection in lieu of Drydock · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7349406
11 November 2021
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7349398
6 June 2021
Administrative Inspection · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7220050
11 March 2021
In-Service Inspection · MARPOL Annex VI Survey · MTSA/ISPS Verification · Internal Structural Exam · Drydock Exam · COI Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7153981
19 October 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7084561
19 March 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7055310
24 October 2019
Administrative Inspection · Internal Structural Exam · Drydock Exam · MARPOL Annex VI Survey · COI Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6841424
16 September 2019
Underwater Inspection in lieu of Drydock · Administrative Inspection · In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6813422
10 September 2019
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6808428
13 June 2019
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6815318
28 July 2017
Construction Oversight · Administrative Inspection · Inclining Experiment · Initial Certification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6223679
Deficiency record · 46
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 March 2026
Resolved
Vessel reported a loss of power on 3/16/26 after a failure of the voltage regulator on the primary generator. Submit class report attesting to the repair of the generator by 25MAR2026.46 CFR 91.40-3(c)
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 24 November 2025
Resolved
On a vessel subject to STCW, the individual meeting the requirements of this section must also hold an STCW endorsement as Officer in Charge of an Engineering Watch with the appropriate propulsion power for the vessel upon which they are operating, except as noted in 15.105(g) for vessels on domestic near-coastal voyages. Licensed engineer does not hold appropriate STCW endorsement.
46 CFR 15.825(b)
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 24 November 2025
Resolved
A designated Duty Engineer (DDE) endorsement authorizes service as a Chief or Assistant Engineer on vessels of less than 500 GT in the following manners: When serving on a vessel to which STCW applies, the appropriate STCW endorsement must also be held. Crew member filling Chief Engineer position does not hold approprate STCW endorsement.
46 CFR 15.915(a)(3)
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for rating for watchkeeping
Issued 24 November 2025
Resolved
Onboard a passenger ship, as defined by the Convention for the Safety of Life at Sea, 1974, as amended (SOLAS), incorporated by reference, see 15.103, on an international voyage, any person serving as Master, Chief Mate, Mate, Chief Engineer, engineer officer, or any person holding an MMC and performing duties relating to safety, cargo handling, or care for passengers, must meet the appropriate requirements of Regulation V/2 of the STCW Convention (incorporated by reference, see 15.103). These individuals must hold documentary evidence to show they meet these requirements. Documentary evidence not provided for ship's crew.
46 CFR 15.1103(f)
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 24 November 2025
Resolved
Penetrations in A-Class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. In addition, the penetration must be designed or insulated so that it will withstand the same temperature rise limits as the boundary penetrated. PVC crush fitting found modified with sealants in the overhead of steering gear space.
46 CFR 116.415(a)(2)(ii)
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 24 November 2025
Resolved
Suitable means, such as a manual damper, automatic damper, or vent cover, must be provided in an accessible location outside the space served by the ventilation duct for shutting off the passage of air through the ventilation duct in the event of fire. Commercial laundry vent on lower weather deck was seized in the open position.
46 CFR 116.610(d)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 November 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Breaker panel in crew laundry was missing a blank and allowed access to electrical shock.
46 CFR 120.200(b)
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 November 2025
Resolved
A door in a stairtower, stairway, and main vertical zone bulkhead must meet the following additional requirements: A door must be of the self-closing type capable of closing against a 3.5 list of the vessel. Port stairwell fire screen door on lounge deck did not fully close.
46 CFR 116.435(c)(6)(i)
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 November 2025
Resolved
A door in a stairtower, stairway, and main vertical zone bulkhead must meet the following additional requirements: Holdback hooks are not allowed. If installed, a hold back mechanism for a door must allow the door to be released: locally, upon a signal from a control space; and upon disruption of the power system. B class door on 300 mud room deck had permanent holdback only capable of local release.
46 CFR 116.435(c)(6)(ii)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 November 2025
Resolved
All cable and wire must: Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling retention of multiple cable installations, and not used as a means of support. Wiring installed for new automation management found supported with zip ties.
46 CFR 120.340(b)(4)
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 November 2025
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck. Dining room e-light above coffee alcove was inoperable.
46 CFR 120.432(a)
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 24 November 2025
Resolved
Penetrations in A-Class fire control boundaries for electrical cables, pipes, trunks, ducts, etc. must be constructed to prevent the passage of flame and smoke for one hour. Multi cable transit outside engine control room missing portion of suitable fire protection.
46 CFR 116.415(a)(2)(ii)
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 24 November 2025
Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory. The Company should ensure that each ship is: manned with qualified, certificated and medically fit seafarers in accordance with national and international requirements; and appropriately manned in order to encompass all aspects of maintaining safe operations on board. The company shall conduct an internal audit focused on their implementation of this provision in light of the 03 Coast Guard issued deficiencies detailing insufficiently credentialed crew being provided to the vessel.74SOLAS(20) IX/3.1 &
ISM Code 6.2
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 December 2024
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Vessel reported #1 and #2 generators are non-operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 November 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including the following: Inspection of all machinery essential to the routine operation of the vessel including generators and cooling systems. Operator self reported both generators were not operational at the time of the inspection due to being serviced for required preventative maintenance. Once generators are fully operational, provide certification from Master and Chief Engineer to Sector San [name withheld] that both generators are fully functional and capable to taking all required loads.
46 CFR 115.804
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 November 2024
Resolved
All vessels shall be provided with a satisfactory bilge pumping plant capable of pumping and draining any watertight compartment except for ballast, oil and water tanks which have acceptable means for filling and emptying independent of the bilge system. Void space containing 3 separate bilge suctions (AA, H, C) found the C suction was inoperable.
46 CFR 56.50-50
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 26 November 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of lifesaving equipment and systems, including the following: Tests of each rescue boat and each rescue boat launching appliance and survival craft launching appliance in accordance with § 122.520 of this chapter. Servicing report dated 25NOV24 from Survitec noted limit switch for both rescue boat launching arrangements require replacement. Provide report attesting to replacement of both limit switches by 26FEB2025.
46 CFR 115.808
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 26 November 2024
Resolved
Stowage of cylinders: Cylinder must always be secured and, when not in use, they must be stowed in a rack in an upright position, with the valve protection cap in place. Oxygen and acetylene bottles in the engine room found not properly stowed.
46 CFR 147.60
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 November 2024
Resolved
The electrical power available shall be sufficient to supply all those services that are essential for safety in an emergency, due regard being paid to such services as may have to be operated simultaneously. Emergency diesel generator day tank found filled to approximately 50% and determined to be insufficient to meet the time requirements associated with this regulation.
74 SOLAS (14) II-1/42.2
07 - Fire Safety › N/A - No Subsystem › Crew alarm
Issued 8 June 2024
Resolved
Vessels described by 46 CFR 114.110(f) must submit plans to the cognizant OCMI, in accordance with 46 CFR 115.700, for the installation and use of monitoring device(s) to ensure the wakefulness of the watchmen required in paragraph (a) of this section.
46 CFR 122.410(b)(2)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2024
Resolved
Each boiler, including superheater, reheater, economizer, auxiliary boiler, low-pressure heating boiler, and unfired steam boiler, must be available for examination by the marine inspector at intervals specified by Table 61.05–10. Both boilers onboard were due for fireside inspection on 30MAR24. Complete inspection by 23MAY24.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2023
Resolved
Auxiliary boilers and their associated piping and fittings will be given separate consideration and must meet the applicable requirements of subchapter F as determined necessary by the cognizant OCMI. All automatic auxiliary boilers must be tested and inspected in accordance with this subpart (61.35) and subpart 61.05 of this part. Each boiler must be available for examination by the marine inspector at intervals specified by Table 61.05-10 to determine that the complete unit is in a safe and satisfactory condition. Table 61.05-10 requires a hydrostatic test on watertube boilers in service on a Passenger Vessel twice in any five year period, with no more than three years between any test. The vessel’s Port Auxiliary Boiler and Starboard Auxiliary Boiler were last tested on 16OCT2018. Hydrostatically test the Port Auxiliary Boiler and Starboard Auxiliary Boiler to 1.25 MAWP prior to carrying passengers for hire.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2023
Resolved
Auxiliary boilers and their associated piping and fittings will be given separate consideration and must meet the applicable requirements of subchapter F as determined necessary by the cognizant OCMI. All automatic auxiliary boilers must be tested and inspected in accordance with this subpart (61.35) and subpart 61.05 of this part. Each boiler must be available for examination by the marine inspector at intervals specified by Table 61.05-10 to determine that the complete unit is in a safe and satisfactory condition. Table 61.05-10 requires boiler safety-valve tests twice in any five year period, with no more than three years between any test. The Port Auxiliary Boiler and Starboard Auxiliary Boiler safety valves are overdue for testing as of 16OCT2023. Test the Port Auxiliary Boiler and Starboard Auxiliary Boiler safety valves prior to carrying passengers for hire.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 November 2023
Resolved
For a vessel, the construction of which was begun prior to approval of the plans and information required by paragraphs (a) and (b) of this section, the cognizant OCMI may require any additional plans and information, manufacturers’ certifications of construction, testing, and inspections, which the OCMI determines are necessary to verify that the vessel complies with the requirements of this subchapter. The vessel installed 480VAC Galley Equipment without Coast Guard Plan Approval. Submit the following plans to the Marine Safety Center for approval: One-Line Diagram, Cable List, Bill of Material, Type and size of cables, Rating and setting of overcurrent devices, and electrical plan load analysis.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 November 2023
Resolved
Auxiliary boilers and their associated piping and fittings will be given separate consideration and must meet the applicable requirements of subchapter F as determined necessary by the cognizant [name withheld] auxiliary boilers must have MSC approved test procedures with detailed instructions for operationally testing each automatic auxiliary boiler, its controls, and safety devices. The vessel’s PSTPs did not accurately reflect the test methods for the specific control system requirements found in 46 CFR 63.20-1 to include: Primary safety control system, combustion control system, water level controls and low water cutoff controls. Submit revised test procedures to MSC for approval.
07 - Fire Safety › N/A - No Subsystem › Fire patrol
Issued 29 November 2023
Resolved
Vessels described by 46 CFR 114.110(f) must submit plans to the cognizant OCMI, in accordance with 46 CFR 115.700, for the installation and use of monitoring device(s) to ensure the wakefulness of the watchmen required in paragraph (a) of this section. The monitoring device(s) must: Ensure the wakefulness of the crew in the event that the watchman required in paragraph (a) of this section is unresponsive; Remain operable during the nighttime watch and; Be arranged to ensure proper coverage of the passenger accommodation spaces, common areas, and spaces with potential fire hazards. Vessel does not have monitoring devices in place for the wakefulness of watchmen and has not submitted plans to the Coast Guard.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 29 November 2023
Resolved
On vessels described by 46 CFR 114.110(e), flammable items not covered by the regulations of this subchapter, such as rechargeable batteries, including lithium ion batteries utilized for commercial purposes, must be handled, stored, and operated in a way that mitigates the risk of hazardous conditions. Develop written procedure for any operation and/or storage of potentially hazardous items onboard including small lithium ion batteries and their charging arrangements.
46 CFR 122.364
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 29 November 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 29 November 2023
Resolved
The vessel operator shall keep a written record available for inspection by the COTP or OCMI of: The Declaration of Inspection as required by 156.150(f) of this chapter. DOI’s were not available for inspection.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 November 2023
Resolved
A door in a stairtower, stairway, and main vertical zone bulkhead must meet the following additional requirements: A door must be of the self closing type capable of closing against a 3.5 list of the vessel. Main deck aft stairtower A door did not fully close.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 29 November 2023
Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The port day tank fuel shutoff valve was found to be inoperable. The valve was repaired and tested satisfactorily in the presence of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 November 2023
Resolved
All unfired pressure vessels must meet the applicable requirements of subchapter F. If your vessel’s Certificate of Inspection is renewed annually, the marine inspector must c heck the settings of the safety or relief valves on all pressure vessels at each inspection for certification. The Port Engine Room Air Receiver safety valve was found to not lift at the pressure vessel’s Maximum Allowable Working Pressure (MAWP). The pressure gauge was replaced, and the safety relief valve was retested in the presence of the Marine Inspector. The safety relief valve lifted at the MAWP, and limited any further rise of pressure.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 November 2022
Resolved
Paint and flammable liquid lockers must be constructed of steel or equivalent material, or wholly lined with steel or equivalent material. Paint lockers on board could not be closed and secured as originally designed. 46 CFR 116.405e
12 - Dangerous Goods › N/A - No Subsystem › Dangerous goods / harmful substances in pack. form
Issued 28 November 2022
Resolved
The design, construction and stowage of portable tanks and related fuel lines and accessories must meet the requirements of ABYC H-25, “Portable Gasoline Fuel Systems for Flammable Liquids,” or other standard specified by the Commandant. Marine Inspector identified four portable gasoline fuel tanks used for zodiac operations have UV damage and delamination.
46 CFR 119.458(b)
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 1 December 2021
Resolved
A fixed fire detection system shall be so installed and arranged to provide smoke detection in service and accommodation spaces including corridors, stairways and escape routes. Smoke detector in forward port crew stairway not on fire control plan.
SOLAS CONSOL 2014, Ch II-2, 5.5.2.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 1 December 2021
Resolved
Doors in A-Class fire control boundary, if a main vertical zone bulkhead, meet the following additional requirement-be self closing against a 3.5 degree list of the vessel.
46 CFR 116.435 (c) (6) (i)
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 18 November 2021
Resolved
Replace five AFF fire extinguishers as ID'd prior to carrying passengers. 46 CFR 118.500
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 18 November 2021
Resolved
Provide liferaft service reports prior to carrying passengers. 46t CFR 117.200/1122.730(a)(1)
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 18 November 2021
Resolved
Fire control plan must indicate life ring locations as ID'd.
46 CFR 117.70/46 CFR 116.202(b)(7)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 November 2021
Resolved
Submit fire and safety plan to reflect accurate fire and lifesaving equipment. SOLAS 2014 CONSOL, Ch II-2, Reg 15, 2.4.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 June 2021
Resolved
#1 AUX Gen had an overspeed condition and was shutdown. Prove proper operation of the #1 AUX GEN to the satisfaction of USCG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 March 2021
Resolved
The purpose of this regulation is to contain a fire in the space of origin. For this purpose, the following functional requirements shall be met: the fire integrity of the divisions shall be maintained at openings and penetrations. Two self closing class A doors (sundeck stair tower door across from bar and main deck access to crew berthing) failed to properly close.
74 SOLAS (14) II-2/9.1.3
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 30 March 2021
Resolved
No ship to which the present Convention applies shall proceed to sea on an international voyage after the date on which the present Convention comes into force unless it has been surveyed, marked and provided with an International Load Line Certificate (ILLC). ILLC is expired. Provide valid ILLC prior to sailing international.
ICCL 1988 Annex A Article 3
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 November 2019
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including operational test of the means provided for pumping bilges. Vessel crew unable to demonstrate operation of bilge system in each space. 46 CFR 115.804(h)
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 24 October 2019
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation (COD) currently in effect for that vessel. Vessel COD is expired and no valid COD is currently on board. Vessel route is reduced to Coastwise domestic voyages only until resolved. 46 CFR 67.313
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 28 July 2017
Resolved
Install missing Structural Fire Protection in engine room, trash room, room 223, and new blkd in bow thruster electrical panel space, structural fire protection is not installed IAW approved plan
Casualty record · 2
30 July 2022Routine · role: Involved in a Marine Casualty · activity 7877873
2 December 2024Routine · role: Involved in a Marine Casualty · activity 8042759
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.