← All vessels
LNG FINIMA II
LNG FINIMA II is a tank ship. The Coast Guard has recorded 6 inspections since 2017, most recently in May 2025, along with 6 deficiencies and 1 operational control.
Records from 2017 to 2025. Most recent: inspection, 22 May 2025.
- Built
- Not recorded
- Last inspected
- 22 May 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 6 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9690145 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
ZCEQ4
1381920
Flag
BERMUDA
—
Maury page id
psix-1381920
Inspections, by type
…with no type recorded2
Years with a record
3 calendar years (2017–2025)
The 6 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it98954 - Dead Weight, Metric Ton
123464 - Displacement, Metric Ton
34970 - Convention (Subpart B), Net Ton
116568 - Convention (Subpart B), Gross Ton
123464 - Displacement, Metric Ton
34970 - Convention (Subpart B), Net Ton
116568 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 6
22 May 2025
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8142239
20 May 2025
COE-Administrative
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8139657
25 September 2024
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8014049
2 August 2024
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7966661
2 August 2024
PSC B · COC-GAS Renew · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7968102
14 November 2017
COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6303375
Deficiency record · 6
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 2 August 2024
Resolved
Gas detection equipment should be designed that it may readily be testd. Testing and calibratin should be carred out at regular intervals... Crew came out with 02 ziplock bags to test gas sampling. Previous test were carried out the same way. 74 SOLAS (2020 Cons)VII/12.1 IGC Code 1993 13.6.6
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 2 August 2024
Resolved
The company should establish procedures to ensure that the ship is maintained...10.2.1 inspections are held at appropriate intervals. Gas Sampling system operating manual states "recommend mainenance of gas sampling" between 3-6 months. Ship has no procedures to complete. A corrective action plan is required within the action taken. 74 SOLAS (2020 Cons) IX/3.1 ISM Code 10
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 2 August 2024
Resolved
The doors should be self closing and without any hold back arrangements. Outside door to air lock is missing self closure device. 74 SOLAS (2020 Cons) VII/12.1 IGC Code 1993 5.6.4
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 2 August 2024
Resolved
The control system for all required emergency shutdown valves... fully close under all service conditions within 30s... Closing time should be verifiable and reproducible. Valve CL001 could not open and all others closed in 15s Crew stated time should be 25s.
14 - Pollution Prevention › 147 - Anti-Fouling › Other (AFS)
Issued 2 August 2024
Resolved
Remove foulng organisms from the vessel's hull piping and tanks... Vessel has about 0.75 meter green algy hull growth. 33CFR151.2050(f)
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 14 November 2017
Resolved
Those parts of the gas fuel piping which are not enclosed in a ventilated pipe or duct should have full penetration butt-welded joints. Two master gas valves are located on the open deck of the stern.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.