Records in 2016. Most recent: inspection, 30 June 2016.
Inspection history · 12
30 June 2016
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5924528
17 June 2016
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5910430
13 June 2016
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5903040
5 June 2016
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5899265
12 May 2016
NPV Safety Exam · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5875022
11 May 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5874322
9 May 2016
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5872363
8 April 2016
Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5849014
1 April 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5848569
25 March 2016
PII Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5836769
24 March 2016
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5840248
24 March 2016
COE-Offshore
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5841697
Documentation › Certificates/Documents › International Tonnage Certificate
Issued 13 June 2016
No resolution recorded
An International Tonnage Certificate shall be issued to every ship, the gross and net tonnages of which have been determined in accordance with the present convention. The vessels International Tonage Certificate supplement issued 17 March 16 does not match the number of fuel oil tanks or capacity onboard. International Convention on Tonnage Article 7. 16bc
Action required: 705 - Other - as specified
Due 13 July 2016 — due date passed with no resolution recorded
Documentation › Certificates/Documents › IOPP Certificate
Issued 13 June 2016
No resolution recorded
The vessels IOPP cerificate does not identify any holding tanks for the retention onboard oil residue (sludge) tank. PSC team observed a 1,000 liter tank on the vessels drawings and is currently being utilized for retention and disposal of oil residues. MARPOL 2006 Annex I Reg 7. / 16bc
Action required: 705 - Other - as specified
Due 13 July 2016 — due date passed with no resolution recorded
Documentation › Logs/Records › Oil Record Book
Issued 13 June 2016
No resolution recorded
The oil record book part I shall be completed on each occasion on a tank to tank basis whenever any of the machinery space operations identified on Reg 17.2 are conducted.Additionally each shall be signed by the Master of the ship. The PSC team observed the oil record book was not signed by the Master on several occasions and all required operations were not logged.MARPOL06 AnnI Reg17.2/17.4 16bc
Action required: 705 - Other - as specified
Due 13 July 2016 — due date passed with no resolution recorded
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 June 2016
Resolved
The arrangements for the storage distribution and utilization of lube oil shall be situated where spillage or leakage can't constitute a fire or explosion hazard. The PSC Team observed excessive oil in the vessel bilges. SOLAS 2004 CH. II-2 REG 4.2.3.1 / 17C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2016
Resolution: Received receipt of bilges pumped out by vacuum truck.
Engineering › Diesel Engine (propulsion-direct drive) › Seal
Issued 13 June 2016
Resolved
The arrangements for the storage, distribution and utilization of lube oil shall be situated where spillage or leakage cannot constitute a fire or explosion hazard. The PSC Team observed an excessive oil leak at the front of the port main diesel engine. SOLAS 2004, CH II-2 Reg 4.2.3.1 / 17c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2016
Resolution: Vessel's crew was able to stop excessive leak of oil coming from the port mde piston head.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 12 May 2016
Resolved
Each production device (MSD) must be legibly marked in accordance with paragraph (b) of 33 CFR 159.55. The instructions supplied by the manufacturer must contain directions for each of the items listed in 33 CFR 159.57. Each device must have a placard suitable for posting on which is printed the operating instructions, safety precautions and warnings pertinent to the device. When operating a vesse
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2016
Resolved 16 May 2016
Resolution: Received copy of placard and manual for MSD that has approval from USCG.
Engineering › Fuel Oil Service System › Hose
Issued 25 March 2016
Resolved
PSCO found that the fuel oil lines on the both main propulsion engines did not have screens or other suitable protection installed. The same was found for both ship service generators. SOLAS(2014)II-2/4.2.2.5.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 March 2016
Resolved 1 April 2016
Resolution: Verfied screens were installed on fuel system for propusion engines and ship service generators.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 25 March 2016
Resolved
PSCO found that the insulation for the exhaust was deteriorated or missing. SOLAS(2014) II-2/4.2.2.6.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 March 2016
Resolved 1 April 2016
Resolution: Verfied insulation was installed on both main propulsion engines.
Documentation › Certificates/Documents › Cargo Ship Safety Construction Certificate
Issued 25 March 2016
Resolved
The PSCO found that the Cargo Ship Safety Construction Certificate did not list any ship bottom survey. SOLAS(2014) I/10(A)(V). 50bc
Condition: Invalid
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 9 May 2016
Resolution: Received proper documentation attesting to survey conducted of ships bottom hull.
Documentation › Safety/Response Plans/Programs › Ballast Water Management Plan
Issued 25 March 2016
Resolved
PSCO found the vessel is fitted with ballast tanks and the vessel does not have a plan. 33CFR151.2050(g) 50c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 July 2016
Resolved 13 June 2016
Resolution: Vessel has an approved ballast water management plan on board.
Operations/Management › Ballast Water Managment › Sediments
Issued 25 March 2016
Resolved
PSCO found that the vessels hull below the water line was heavily covered with crustaceans. 33CFR151.2050(f). 40c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 28 March 2016
Resolved 8 April 2016
Resolution: Received underwater inspection report from SECIMAR, E.I.R.L. attesting to hull cleaning and inspection
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 25 March 2016
Resolved
PSCO found that the waste oil(sludge)system was missing from the procedures. 33CFR155.750(a)(2). 50c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 9 May 2016
Resolution: Received proper documentation attesting to the presence of transfer procedures for waste oil (sludge).
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 25 March 2016
Resolved
PSCO found the waste oil(sludge) pipng located on the starboard side has not been tested. 33CFR156.170(c)(5). 50c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 July 2016
Resolved 30 June 2016
Resolution: Hydrostatic test performed by Harbor Bunkering on 29Jun16
Electrical › Mast › Lightning Ground
Issued 25 March 2016
Resolved
PSCO found that the cable supporting on the mast on top of the pilot house was wasted leaving the cables unsupported. SOLAS(74) II-1/27(vi). 50bc
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 1 April 2016
Resolution: Verfied new support for electrical cable were installed.
Engineering › Fuel Oil Service System › Valve
Issued 25 March 2016
Resolved
PSCO found that the valve would not close due to lack of maintenance (starboard side). SOLAS(74)II-1/33(A)(v). 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 25 March 2016
Resolution: Corrected on the spot
Lifesaving › Inflatable Liferafts › Painter
Issued 25 March 2016
Resolved
PSCO found that the liferaft painter(both rafts) were not connected to the hydrostatic weaklink as required. SOLAS(74) III/20.2 10C
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 25 March 2016
Resolution: The liferaft painter were tied to the hydrostatic weaklink
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 25 March 2016
Resolved
PSCO found that there are no requirement in the safety management system to cover requirement 02 and 03 above. SOLAS(14)IX/3.1 ISM Part A 10.1 and 10.2 50b
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 9 May 2016
Resolution: Received proper documentation attesting to the implementation of regularly scheduled maintenance of fuel oil service system components.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 25 March 2016
Resolved
The PSCO found that the following crew members credentials were limited to 13 degrees 30 minutes North latitud : Chiefmate and Seaman Oiler. Minumum safe manning is for a two watch system system compant has manned vessel for a two watch system where the Chiefmate is one of the two watchstanders. SOLAS(14) V/14.3
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 9 May 2016
Resolution: Received proper documentation attesting to ther ship meeting safe manning requirements.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 25 March 2016
Resolved
PSCO found that the installed MSD did not have a labelor manualif it had certification as a TYPE II device
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 5 June 2016
Resolution: Inspected placard and manual proving that MSD is USCG approved.