Records from 2016 to 2024. Most recent: inspection, 15 November 2024.
Inspection history · 37
15 November 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8035213
23 July 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7964867
28 May 2024
Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7921457
2 May 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7905240
25 April 2024
In-Service Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7901440
5 April 2024
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7890627
30 March 2024
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7887062
3 March 2024
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7873287
8 February 2024
In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7862459
7 February 2024
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7862548
30 January 2024
PSC B · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7855998
16 January 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7849575
11 January 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7848413
11 January 2024
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7848459
5 December 2023
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7834483
4 December 2023
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7834467
1 December 2023
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7872229
29 November 2023
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7831510
27 March 2023
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7658025
26 February 2023
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7642007
26 February 2023
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7642009
1 February 2022
PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7387490
17 September 2021
PSC B · Ballast Water Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7311333
17 September 2021
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7335989
14 June 2021
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7228584
11 February 2021
PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7136768
6 February 2020
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6904123
8 July 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6741663
3 June 2019
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6702602
19 June 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6444594
12 June 2017
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6173461
6 June 2017
ISPS II Exam · Ballast Water Examination · NPV Safety Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6164223
29 September 2016
NPV Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6012785
17 August 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5975778
17 August 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5975787
25 May 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5884390
25 May 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5886872
10 - Safety of Navigation › N/A - No Subsystem › Speed and distance indicator
Issued 25 April 2024
Resolved
The administraion shall be satisfied that adequate arrangements are in place to ensure that the performance of the equipment required by this chapter is maintained. PSCO observed requirements listed on dispensation letter issued on 24APR24 were not being followed by ships crew. Speed log and #1 Gyro Compass were reported inoperable.
74SOLAS(20)V/16
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 2 May 2024
Resolution: Received dispensation letter and work order for gyro compass and speed log
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 March 2024
Resolved
Means sahll be provided to control leaks of flammable liquids. PSCO observed F/O leak on D/G #3 cylinder #6.
74SOLAS(09)II-2/4.1.1
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 March 2024
Resolved 31 March 2024
Resolution: Cleared via class report, see documents
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 30 March 2024
Resolved
After any survey of the ship under regulation 10 has been completed, not change shall be made in the structural arrangements, machinery, equipment covered by the survey, without the sanction of the Administration. PSCO observed a modified extension to the F/O leak alarm tank on the D/G #2,4.
74SOLAS(20)I/11b
17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 30 March 2024
Resolved 31 March 2024
Resolution: Cleared via class report, see documents
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 30 March 2024
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations; the company should ensure that any non conformity is reported, with its possible cause, if known. PSCO observed modifications to D/G #2,4 and a system fault on M/E gear case #3 oil mist detector that were not reported to class. An internal ISM audit is required within 30 days.
74SOLAS(20) IX/3.1
ISM code 10.2.2
50ac
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2024
Resolved 26 April 2024
Resolution: Received corrective action report
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 March 2024
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed minor F/O leak on the #2 HFO transfer pump.
74SOLAS(09)II-1/4.1.1
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 26 April 2024
Resolution: received corrective action report
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 March 2024
Resolved
The arrangements for storage, distribution and utilization of oil used in pressure lubrication systems shall be such as to ensure the safety of the ship and persons on board. PSCO observed a minor L/O coolers collected in a modified leak containment.
74SOLAS(09)II-2/4.2.3.1
40ac
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 26 April 2024
Resolution: received corrective action report
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 30 March 2024
Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected to. PSCO observed steam leaks on the hot water tank return valve and M/E preheater steam line.
74SOLAS(04)II-1/33.1
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 26 April 2024
Resolution: recieved corrective action report
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 March 2024
Resolved
After any survey of the ship under regulations 7,8,9 or 10 has been completed no changes shall be made in the structural arrangements, machinery, equipment and other items covered by the survey. without the sanction of the administration. PSCO observed a missing turning gear control on the #4 D/G.
74SOLAS(20) I/11b
40ac
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 26 April 2024
Resolution: recieved corrective action report
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 March 2024
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured. PSCO observed fuse failure on D/G #1.
74SOLAS(04) II-1/40.1.3
40ac
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 31 March 2024
Resolution: Cleared by class, see documents
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 March 2024
Resolved
Whenever a defect is discovered, either of which affects the safety of the ship or the efficiency or completeness of its other equipment, the master or owner of the ship shall report at the earliest convenience to the recognized organization responsible for issuiing the relevant certificate. PSCO observed M/E gear case #3 oil mist detector system fault.
74SOLAS(20) I/11c
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 28 May 2024
Resolution: Class provided attestation of oil mist detection system. See documents tab for correspondence.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 March 2024
Resolved
Electrical service essential for safety will be ensured under various emergency conditions. PSCO observed emergency deck lighting failure on starbourd bays 17 and 21 and port side, bays 33 adn 39.
74SOLAS(04) II-1/ 40.1.2
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 March 2024
Resolved 31 March 2024
Resolution: Cleared via class, see documents
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 30 March 2024
Resolved
The means for securing and maintaining weather tightness shall be to the satisfaction of the administration. The arrangements shall ensure that the tightness can be maintained in any sea conditions. PSCO observed failed gasket and missing bolts on hatch cover for E/R skylight. ICLL 16.4
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 April 2024
Resolution: recieved corrective action report
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 February 2024
Resolved
SHIPS SHALL BE DESIGNED AND MAINTAINED W/ THE MECHANICAL REQUIREMENTS OF A RECOGNIZED CLASSIFICATION SOCIETY; VESSEL WAS UNABLE TO START MAIN ENGINE DURING MOORING EVOLUTION DUE TO LOW START AIR PRESSURE. VESSEL'S CREW ALONG W/ DNV ATTESTED TO THE PROPER OPERATION OF START AIR SYSTEM.
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Resolved 8 February 2024
Resolution: DNV AND SHIP'S CREW ATTESTED TO THE PROPEWR OPERATION OF VESSEL'S START AIR SYSTEM
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 January 2024
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed, and maintained in compliance with the structural, mechanical, and electrical requirements of a classification society which is recognized by the Administration... PSCO's observed jacket water emanating from the main engine cycliner casing.
74 SOLAS (04) II-1/3-1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 3 March 2024
Resolution: Vessel provided class report survey for completed repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 January 2024
Resolved
Hydrolic power-operated steering gear shall be provided with the following: arrangements to maintain the cleanliness of the hydraulic fluid taking into account the type and design of the hydraulic system. PSCO's observed hydraulic oil leaking from multiple gaskets.
74 SOLAS(04) II-1/29.12.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 30 January 2024
Resolution: Engineers tightened bolts in areas where gaskets were located to prevent hydraulic fluid from leaking.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 January 2024
Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect, including those on board tankers or in compartments assigned principally for accumulator batteries, in paint lockers, aceteyne stores or similar spaces, unless the Administration is satisfied that the equipment is appropriately certified for safe usage in the dust, vapors, or gasses likely to be encountered. PSCO's observed the casing to the light in the paint locker was damaged.
74 SOLAS (04) II-1/45.10.4
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 30 January 2024
Resolution: Light casing to the light in paint locker was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 January 2024
Resolved
74SOLAS(09)CH II-1/Reg 3-1
Ship shall be designed, constructed, and maintained in compliance with the structural, mechanical, and electrical requirements of a classification society. During transit into port M/V SEALAND PHILADELPHIA main engine shutdown unexpectedly over multiple occasions.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2024
Resolution: Flag control letter
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 26 February 2023
Resolved
All ships of 300 gross tonnage and upwards and passenger ships irrespective of size shall, in addition to meeting the requirements of paragraph 2.2, be fitted with: a 9 GHz radar. Vessels X-Band radar is inoperable.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 March 2023
Resolution: MSD SB received documentation from flag attesting to the successful repairs to the X-Band Radar.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 September 2021
Resolved
13101 - Propulsion and Auxiliary Machinery - Means shall be provided whereby normal operation of propulsion machinery can be sustained or restored even though one of the essential auxiliaries becomes inoperable. While berthing at Port Hueneme, the Chief Engineer found the A3 main engine fuel pump to be overheating and removed it from service. Subsequently the vessel lost propulsion while maneuvering to the dock. - SOLAS 74a II-1/26.3
Action required: 17 - Rectify deficiencies prior to departure
Due 17 September 2021
Resolved 18 September 2021
Resolution: Crew replaced defective fuell pump with a spare. Conducted satisfactiry engine tests. Class report issued.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 September 2021
Resolved
07124-Fire Safety-Maintenance, testing and inspections shall be carried out based on the guidelines developed by the organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. Fixed flame detectors were found to have been tested by crew using disposable lighters, which can damage detectors. No other devices for flame detectors were provided by the crew. Manufacturer's instructions require the use of "suitable equipment". - SOLAS 74a II-2/14.2.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2021
Resolved 18 September 2021
Resolution: Crew located a flame detector test lamp.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 3 June 2019
Resolved
74SOLAS(14)III/20.2 15ac BEFORE THE SHIP LEAVES PORT AND AT ALL TIMES DURING THE VOYAGE, ALL LIFE-SAVING APPLIANCES SHALL BE IN WORKING ORDER AND READY FOR IMMEDIATE USE. VESSEL'S RESCUE BOAT HAS INOPERABLE STARTER.
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Resolved 4 June 2019
Resolution: New Rescue boat outboard motor was installed and tested and found in order. (Maker: Yamaha Motor, Type: F25LC).It was confirmed by Yamaha Motor Japan that Engine type F25LC is same as type F25G which is MED type approved (MED-B-9853, Certified by DNVGL
Lifesaving › Lifeboat › Hull
Issued 6 June 2017
Resolved
01-0610 Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed missing reto-reflective tape and damaged fiberglass on the keel of the free fall lifeboat. 74SOLAS(2014 Cons) III/20.2 40AC
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 June 2017
Resolved 12 June 2017
Resolution: New retro-reflective tape was fitted on the free-fall lifeboat and the damaged fiberglass was removed and repaired.
Electrical › Lighting (service) › Lighting Fixture
Issued 6 June 2017
Resolved
02-0520 A main electric lighting system which shall provide illumination throughout those parts of the ship normally assessable to and used by passengers or crew shall be supplied from the main source of electrical power. PSCO observed several broken or missing lighting fixtures outside of the accommodation spaces. 74SOLAS(2004 Cons) II-I/41.2.1 40AC
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 June 2017
Resolved 12 June 2017
Resolution: The broken lighting fixture on 1st deck port side was replaced by the ship spare, and other missing lighting fixtures on 2nd & 3rd deck port side now fitted by the ship crew.
Engineering › Compressed Air System (start air) › Compressor
Issued 29 September 2016
Resolved
Main Engine is consuming excess starting air, reducing the number of air starts.
74 SOLAS (14 Cons.) II-1/26.1
Action required: 17 - Rectify deficiencies prior to departure
Due 29 September 2016
Resolved 31 October 2016
Resolution: Recieved class report attesting to the repair.
Engineering › Diesel Engine (propulsion-direct drive) › Pump, High Pressure (fuel injection)
Issued 29 September 2016
Resolved
Vessel's fuel pumps are in an unknown operational condition. Additionally, only 05 out of the 06 fuel pumps are able to be repaired or replaced.
74 SOLAS (14 Cons.) II-1/26.3.4
Action required: 17 - Rectify deficiencies prior to departure
Due 29 September 2016
Resolved 31 October 2016
Resolution: Recived class report attestting to the repair.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 29 September 2016
Resolved
Vessel is using LSMGO fuel with viscosity/temperature levels outside of perameters set by the Safety Management System.
74 SOLAS (14 Cons.) IX/5, ISM Code 10.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 29 September 2016
Resolved 31 October 2016
Resolution: Recieved class report attesting to the repair.
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 17 August 2016
Resolved
The main engine lost fuel oil pressure, preventing the engine from starting while transitting into the port of Los Angeles, CA. 74 SOLAS(2014) CH I-1,Reg 11(a) 60(a)(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 August 2016
Resolution: The #3 ICU was replaced and witnessed by class. This fixed the low fuel oil pressure.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (air motor)
Issued 25 May 2016
Resolved
74SOLAS(14CONS ED.) CH.II-I/REG 26.4 MEANS SHALL BE PROVIDED TO ENSURE THAT THE MACHINERY CAN BE BROUGHT INTO OPERATION FROM THE DEAD SHIP CONDITION WITHOUT EXTERNAL AID: VESSEL EXPERIENCED A LOSS OF PROPULSION AND WAS UNABLE TO RESTART. 60AC
Action required: 17 - Rectify deficiencies prior to departure
Due 25 May 2016
Resolved 26 May 2016
Resolution: Class report received. Main Engine tested ahead and astern and found working.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 25 May 2016
Resolved
74SOLAS(14CONS ED.)CH. II-2/REG.4.1 THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF CUMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: 1 MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS; PIPING THAT PROVIDES FUEL OIL TO INCENERATOR WAS FOUND TO HAVE CONSISTENT LEAK. 40AC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 25 May 2016
Resolved 26 May 2016
Resolution: Class report received. Incinerator operated and verified no leakage further.
Engineering › Compressed Air System (start air) › Valve
Issued 25 May 2016
Resolved
74SOLAS(14CONS ED.) CH.II-1/REG. 26.3.9 MEANS SHALL BE PROVIDED WHEREBY NORMAL OPERATION OF PROPULSION MACHINERY CAN BE SUSTAINED OR RESTORED EVEN THROUGH ONE OF THE ESSENTIAL AUXILIARIES BECOMES INOPERATIVE. SPECIAL CONSIDERATION SHALL BE GIVEN O HE MALFUNCIONING OF: AN AIR COMPRESSOR AND RECEIVER FOR STARTING OR CONTROL PUPOSES. LOW AIR LEVEL ALARM FOR MAIN ENGINE LINE INOPERABLE. 60AC
Action required: 17 - Rectify deficiencies prior to departure
Due 25 May 2016
Resolved 26 May 2016
Resolution: Class report received. Connections are rectified, testing of alarms verified and found satisfactory.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 25 May 2016
Resolved
74SOLAS(CONS ED.)CH.II-1/REG 45.1.3 ALL ELECTRICAL APPARATUS SHALL BE SO CONSTRUCTED AND SO INSTALLED AS NOT TO CAUSE INJURY WHEN HANDLED OR TOUCHED IN THE NORMAL MANNER. ELECTRIC JUNCTION BOX ON DECK 5 IS MISSING PROTECTIVE COVER ALLOWING EXPOSED WIRING. 10C
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 25 May 2016
Resolution: Rectified on the spot to the satisfaction of the Coast Guard.