MAURY USCG vessel records
← All vessels

SEA UNITY

SEA UNITY is a 2016 freight ship. The Coast Guard has recorded 13 inspections since 2017, most recently in January 2026, along with 10 deficiencies and 3 operational controls.

Records from 2017 to 2026. Most recent: inspection, 7 January 2026.

Built
2016
Last inspected
7 January 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 January 2026
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2017–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9717345
V7A7501
1383364
Flag
LIBERIA
Maury page id
psix-1383364

Documentation record

Tonnage as PSIX records it43968 - Convention (Subpart B), Gross Ton
81112 - Dead Weight, Metric Ton
94796 - Displacement, Metric Ton
27326 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

13 inspections, each with its date, unit and type; 10 deficiencies with the resolution recorded against each; 3 operational controls with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 13

7 January 2026 Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8302538
7 October 2024 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8009647
29 September 2024 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8013186
26 November 2021 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7357623
23 November 2021 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7359587
2 August 2021 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7274989
24 May 2021 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7205319
13 August 2019 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6768292
26 July 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6763167
30 August 2018 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6522292
16 June 2017 Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6177512
20 March 2017 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6106024
17 March 2017 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6106876

Deficiency record · 10

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 August 2018 Resolved
13101- Propulsion main engine- The purpose of the regulation is to prevent the ignition of flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSCO observed lube oil main line for exhaust valves located on second deck of main engine with RTV sealant on couplings leaking lube oil with folded aluminum drain with rags at the end. SOLAS 74(a)2014 cons II-2/4.1.1 60a
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 6 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Main engine exhaust valve lube oil crossover pipe was repaired with new o rings.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 30 August 2018 Resolved
09232- Working Conditions- Cleanliness of engine room - The ship owners and their crews should apply a program of maintenance and housekeeping. PSCO observed multiple water bottles filled with fuel/ oil as well as oily rags stuffed in the discharge tubes of the purifiers. Also, observed a 5 gallon plastic drum that was filled with oil from bleeding off the incinerator along with containers filled with oils throughout engine room. SOLAS 74(a)2014 cons II-2/ MSC/Circular.601 3.2 60a
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 6 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Crew removed jugs of oil throughout the engine room.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 30 August 2018 Resolved
07111 - Personal equipment for fire safety- Fire-fighter's outfits shall comply with the fire safety systems code. PSCO observed excessive leaking of air on breathing apparatus which used 3/4 of air being consumed in just under 5 minutes during fire drill. SOLAS 74(a)2014 cons II-2/10.10.1 FSS Code 2007/3.2.1.2 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 6 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. SCBA bottle was replaced and tested. BV stated it was crew member improperly improperly operated SCBA
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 August 2018 Resolved
13199-Machinery-Where sounding pipes are used, they shall not terminate in any space where the risk of ignition of spillage from the sounding pipe might arise. The termination of sounding pipes are fitted with self-closing blanking devices and with a small diameter self-closing control cock located below the blanking device is opened that oil fuel in not present. PSCO observed multiple sounding pipes self closing device not operating correctly. SOLAS 74(a) 2014 cons. II-2/4.2.2.3.5.1.3 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Vessel repaired sounding tubes and ensured they were self closing
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 30 August 2018 Resolved
14503-Garbage Management Plan-Every ship of 400 gross tonnage and above and every ship which is certified to carry 15 or more persons engaged in voyages to ports or offshore terminals under the jurisdiction of another party to the convention and every fixed or floating platform shall be provided with a Garage management Plan. PSCO garage management plan has not been updated to reflect MEPC.277(70) no mention of cargo residues, e-waste storage besides one page. PSCO found batteries in engine room workshop not IAW garage management plan. Marpol 2017 cons. Annex V/10.3 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Vessel moved batteries and was following garbabe managment plan.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 30 August 2018 Resolved
04110 - Abandon ship drills- During an abandon ship drill the crew shall board the lifeboat, properly secure themselves in their seats and commence launch procedures up to but not including actual release of lifeboat. the lifeboat shall then either be free-fall launched with only the required operating crew on board, or lowered into the water by means of the secondary means of launching with or without the operating crew on board. In both cases the lifeboat shall thereafter be maneuvered in the water by the operating crew onboard, or simulated launching shall be carried out in accordance with the guidelines developed by the organization. PSCO observed last launching/ maneuvering in water was conducted in April, 2018. SOLAS 74(a) cons 2014 III/19.3.3.4 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 6 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Stated that the vessel launched life boat at 12mile anchorage.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 30 August 2018 Resolved
07116 - Ventilation - Ventilation ducts shall be steel or equivalent material running from aft ventilation into the UPS outside the engine control room. Class must clarify why ventilation was installed and the UPS status. SOLAS 74(a) cons 2014 II-2/9.7.1.1 17a
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 6 September 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Stated that the C/E high outside temprature. stated crew was being proactive.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 August 2018 Resolved
07199-Fire Safety-The arragement for the storage, distrubution and utilization of other flammable oils employed under pressure in power transmission syatems, control and activating syatems and heating syatems shall be such as to ensure the safety of the ship and person on board. PSCO oberved rescue boat gasoline and kerosene stored in buckets in steering gear room. SOLAS 14(a) cons. 2014 II-I/5.1.2 10c
Action required: 10 - Deficiency Rectified
Due 30 August 2018
Resolved 30 August 2018
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Crew moved gasoline and kerosine to paint locker.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 30 August 2018 Resolved
99103-Marpol operations-Install and operate a ballast water management system that has been approved by the Coast Guard. Unless otherwise expressly provided in this subpart, the master, owner, operator, agent or person in charge of vessel employing a Coast Guard-approved BWMS must meet the application ballast water discharge standard, found in 151.2030 of this subpart at all times of discharge into the waters of the United States. PSCO observed submitted report and records showing use of Ballast Treatment system but after review of treatment system the records of the system do no match with the entries. Vessel is prohibited from discharging ballast water into United States water. 33CFR151.2025 (a)(1)
Action required: 705 - Other - as specified
Due 6 September 2018
Resolved 3 September 2018
Resolution: Vessel departed the river conducted a ballast water exchange using the system.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 20 March 2017 Resolved
Before the Ship leaves Port and at all times during the voyage, all Life-Saving appliances shall be in working order and ready for immediate use. The Stern Launch Lifeboat was unable to start and operate.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 March 2017
Resolved 20 March 2017
Resolution: Ships Crew changed the Lifeboats batteries and the Lifeboat started and operated satisfactorily.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.