Records from 2016 to 2026. Most recent: inspection, 16 July 2026.
Inspection history · 16
16 July 2026
COC-CHEM & TVE Renew · Deficiency Check · PSC B · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8432605
30 March 2025
PSC B · COC-CHEM Annual
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8098865
14 December 2024
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8047632
20 March 2024
COC-CHEM & TVE Renew
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7879656
16 January 2024
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7850012
21 July 2023
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7748414
18 June 2023
PSC B · COC-CHEM Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7717385
6 June 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7470325
16 February 2022
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7394945
6 November 2020
MARPOL Annex VI Survey · Ballast Water Examination · COC-CHEM Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7090051
25 September 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6820716
18 January 2019
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6612101
9 January 2018
COE-Dockside
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6330540
22 November 2017
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6308825
26 November 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6047659
12 September 2016
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5998503
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 21 July 2026
Resolved
The cargoes containment system must have a high-level alarm that can be seen and heard where cargo transfer is controlled on the open deck.
PSCO observed inop audible high level alarm.
Rectify prior to next cargo loading operations.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2026
Resolved 23 July 2026
Resolution: Vessel provided purchase report for audible alarm for high level alarm.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 July 2026
Resolved
Each pressure-vacuum relief valve must be type approved under 46 CFR 162.017 for the preseeure and vacuum relief setting desired.
PSCO observed PV Breaker had 20by20 mesh instead of 30by30 mesh.
Rectify prior to next cargo loading operations.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 August 2026
Resolved 23 July 2026
Resolution: Vessel provided photos of mesh replacement. All sat.
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 16 February 2022
Resolved
In tankers, electrical equipment, cables and wiring shall not be installed in hazardous locations unless it conforms to the standards not inferior to those acceptable to the organization. PSCO foundelectrical wires serving the pressure sensor on the cargo discharge line for 1P, 5S and 7P to be pulled from the condiut with with wire exposed
74 SOLAS (20) II-1/45.11 16a/c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2022
Resolved 25 February 2022
Resolution: Class attended, verified wires placed back in proper service.
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 16 February 2022
Resolved
The associates piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO found the cargo tank washing line's gasket/flange to be leaking water.
74 SOLAS (20) II-1/26.1 16a/c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2022
Resolved 25 February 2022
Resolution: Class attended, verified tank washing line to be satisfactory.