Records from 2016 to 2025. Most recent: inspection, 8 December 2025.
Inspection history · 13
8 December 2025
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8278260
10 December 2024
Annual Inspection · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8035004
11 January 2024
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7886836
10 January 2023
Drydock Exam · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7623361
28 December 2021
COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7373050
5 January 2021
Drydock Exam · Hull Examination · Annual Inspection · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7120269
7 July 2020
Type not recorded
No type recorded · Station Tybee · USCG Southeast District (CGD-SE) · Activity 7000069
30 December 2019
Annual Inspection · Administrative Inspection · Deficiency Check · DAPI Audit · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6880472
18 December 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6598816
25 January 2018
Drydock Exam · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6344339
5 January 2017
DAPI Audit · COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6053903
5 January 2017
DAPI Audit
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6068212
19 May 2016
Hull Examination · DAPI Audit · Initial Certification · Plan Review "T" Boat
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5886403
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 8 December 2025
Resolved
A vessel of not more than 65 feet in length carrying not more than 12 passengers, with independent gasoline fuel tanks built in accordance with ABYC H-24 will be considered as meeting the fuel tank requirements.
Observed cracking of plastic portable gasoline fuel tank.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2025
Resolved 10 December 2025
Resolution: Emailed photo of new fuel tank.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 8 December 2025
Resolved
Portable watertight containers for distress flares and smoke signals shall be of a bright color, and containers shall be clearly marked in legible contrasting letters at least 0.5 inches high: “DISTRESS SIGNALS”.
Watertight container not labeled.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2025
Resolved 10 December 2025
Resolution: Photo of "Distress Signals" written on watertight container.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 8 December 2025
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible.
Charts onboard did not have most up to date corrections.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2025
Resolved 10 December 2025
Resolution: Sent in updated chart for AOR.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 7 January 2020
Resolved
At each initial and subsequent inspection for certification of a vessel the owner or operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances. Repair rub rail, chips, and gelcoat.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2020
Resolved 27 February 2020
Resolution: Repairs were made to the rub rail, chips, and gelcoat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 7 January 2020
Resolved
Deck rails must be designed to withstand a point load of 200 lbs. Tighten hand rails.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2020
Resolved 27 February 2020
Resolution: Repairs were made to the handrails.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2020
Resolved
Batteries must be mounted in trays lined with or constructed of, a material resistant to damage by electrolyte. Mount batteries and provide boots for positive side of terminal.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2020
Resolved 27 February 2020
Resolution: A battery box was placed in service and a boot placed on the positive terminal.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 7 January 2020
Resolved
Ring life buoy must be fitted with a lifeline that is dark in color or resistant to deterioration to UV light.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2020
Resolved 27 February 2020
Resolution: Ring life buoy line was replaced with UV resistant line.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 January 2020
Resolved
A person who manufactures or imports a boat for his or her own use and not for sale must obtain required hull identification number in accordance with requirements of issuing authority and permanently affix the HIN to the boat.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2020
Resolved 27 February 2020
Resolution: A new plate with the HIN was placed in service.