Records from 2016 to 2026. Most recent: inspection, 12 February 2026.
Documentation record
Registered dimensions (L × B × D)51.5 ft × 17.2 ft × 7.1 ft
Registered tonnagegross 42 / net 33
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderRAZORHEAD ALUMINUM BOATS LLC · NEW IBERIA, LA, UNITED STATES · built 2016
Hull materialAluminum
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it42 - Simplified, Gross Ton
33 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
12 February 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8309790
13 March 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8077215
13 May 2024
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7911682
30 January 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7858119
27 February 2023
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7637818
3 March 2022
COI Inspection · Deficiency Check · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7400635
2 March 2021
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7128510
12 March 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6925218
28 March 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6646252
3 April 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6379792
10 March 2017
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6100969
6 March 2017
COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6099359
24 February 2017
Simplified Stability Test
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6093915
14 February 2017
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6088240
30 January 2017
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6079786
9 September 2016
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5996618
20 June 2016
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5913232
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 March 2022
Resolved
Vessel is unable to provide any documentation in regards
to approval of installed engine room CO2 system as
required by 46CFR177.202 (b)(6)(ii). It is required for
the owner/operator to provide proof of meeting these requirements of this cite for submission to the Marine Safety Center.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 April 2022
Resolved 8 August 2022
Resolution: Operator submitted CO2 system plans that were then approved by MSC and had the installed system modified to match the approved plans.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 3 March 2022
Resolved
Vessels diesel generator main drive belt guard was missing as required by 46CFR177.960. Owner must install a sufficient belt guard and provide documentation to attending Marine Inspector that corrections have been made. Operation of the diesel generator is not permitted until satisfactory corrections are approved by the attending Marine Inspector.
46CFR177.960
705 c
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 March 2022
Resolved 7 March 2022
Resolution: VSL maintenance manager provided photo documentation of installed belt guard.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 March 2022
Resolved
Vessels diesel generator exhaust piping lacked insulation at the muffler ends as required by 46CFR182.430. Owner must install insulation and provide correction documentation to the satisfaction of the attending Marine Inspector.
46CFR182.430
50 c
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 7 March 2022
Resolution: VSL maintenance manager submited photos of replacement insulation on exhaust system.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 March 2022
Resolved
Both main engine turbo chargers were observed with hot surfaces as viewed with a thermal imagery camera. Insulation as required in 46CFR182.430 was missing. Installation of a suitable turbo charger insulating device must be installed and corrections documented to the satisfaction of the attending Marine Inspector.
46CFR182.430
50 c
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 7 March 2022
Resolution: VSL maintenance manager submitted photos of turbocharger thermal lagging inplace.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 March 2022
Resolved
All connections at the main starting batteries were observed to have non-permanent type connections as required by 46CFR183.350. Owner must replace battery connections with permanent type and document corrections to the satisfaction of the attending Marine Inspector.
46CFR183.350 (d)
50 c
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 7 March 2022
Resolution: VSL maintnenance manager submitted photos of hex nuts inplace on battery terminals.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 March 2022
Resolved
Vessels installed engine room CO2 bottles do not meet the requirement of two inch spacing between the bottom of the bottle and the deck as require by 46CFR181.410. Owner must correct the installation and document corrections to the satisfaction of the attending Marine Inspector.
46CFR181.410 (6)
50 c
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 18 March 2022
Resolution: VSL maintenance manager supplied photos of CO2 bottles installed per CFR.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 March 2022
Resolved
Engine room installed CO2 system distribution line did not extend beyond the last orifice as required by 46CFR181.410. Owner must correct the installation and document corrections to the satisfaction of the attending Marine Inspector.
46CFR181.410 (d)(2)
50 c
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 18 March 2022
Resolution: VSL maintenance manager submitted photos of CO2 piping extending beyond the last orifice.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 March 2022
Resolved
Vessels hand bilge pump hose was not able to meet the
requirement of 46CFR182.520 regarding the length of
suction hose enabling discharge overboard of each water
tight compartment. Owner must correct the length of the
hand bilge pump hose and document corrections to the
satisfaction of the attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 April 2022
Resolved 7 March 2022
Resolution: Proper hand pump placed onboard.
Communications › Radio Communications › VHF Radiotelephone
Issued 6 March 2017
Resolved
No operable DSC available.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 March 2017
Resolution: VHF DSC is not required on a Rivers only T-boat as per FCC.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 6 March 2017
Resolved
No Licensed Master availible at time of inspection.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 March 2017
Resolved 10 March 2017
Resolution: Verified captain license is valid
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 6 March 2017
Resolved
No proof of enrollment onboard at time of inspection.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 April 2017
Resolved 10 March 2017
Resolution: Viewed Drug and alcohol testing program enrollment and proper placards are posted on the vessel.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 6 March 2017
Resolved
No navigation charts or publications onboard at time of inspection.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 April 2017
Resolved 10 March 2017
Resolution: Verified proper charts and pubs are onboard the vessel.