Records from 2016 to 2020. Most recent: inspection, 6 July 2020.
Inspection history · 11
6 July 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6998404
8 June 2020
Administrative Inspection · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6971302
30 September 2019
Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6824376
20 March 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6645462
5 September 2018
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6532490
21 February 2018
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6358502
8 August 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6233852
22 February 2017
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6092915
23 January 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6075051
28 November 2016
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6048734
7 July 2016
PII Safety Exam · ISPS I Exam · COE-Offshore
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5932506
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 June 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects, will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed minor leak on the number two fuel oil pressure pump.
74SOLAS (14CONS)
Ch 1/II(A)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2020
Resolved 6 July 2020
Resolution: Received Class Report from RINA attesting to the replacement of the damaged mechanical seal on the number 2 fuel oil pressure pump.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 9 June 2020
Resolved
The opening below the lowest course of the guard rails shall not exceed 230mm (9 inches). The other courses shall be not more than 380 mm (15 inches) apart. Vessel missing horizontal guard rail on the aft most section of the starboard side.
ICLL 66/88
Annex 1 Reg 25 (3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2020
Resolved 6 July 2020
Resolution: Received pictures of the repair of the missing horizontal guard rail on the aft most section of the starboard side of vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 9 June 2020
Resolved
Efficient guard rails or bulwarks shall be fitted to all exposed parts of the freeboard and superstructure decks. Hinged section of port side guard rail is wasted and secured with tie down straps.
ICLL 66/88
Annex 1 Reg 25 (2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2020
Resolved 6 July 2020
Resolution: Received pictures of the repair of the hinged section of the port side guard rail.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 2 October 2019
Resolved
Having regard to the type of ships and the potential fire hazard involved...Ready availability of fire extinguishing appliances. Hoses located near both liferafts and by gangway were missing. Crew returned hoeses, but did not store them with nozzles. 74 SOLAS (97 Cons) II-2/2.7
Action required: 10 - Deficiency Rectified
Due 2 October 2019
Resolved 2 October 2019
Resolution: Crew provided nozzles with stowed fire hoses.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 October 2019
Resolved
Any required system shall be capable of continous operation at all times...sample external smoke detection system found in "air flow fault" status due to fuses having been removed. 74 SOLAS (97 Cons) II-2/13-I.1.2
Action required: 10 - Deficiency Rectified
Due 2 October 2019
Resolved 2 October 2019
Resolution: Chief engineer replaced the missing fuses and was able to reset the sample extraction smoke detection system.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 20 March 2019
Resolved
THE LINE THROWING APPLIANCES SHALL INCLUDE NOT LESS THAN FOUR PROJECTILES. ONE OUT OF FOUR PROJECTILES ONBOARD HAS EXPIRED, FOR WHICH NO SPARES WERE AVAILABLE. 74 SOLAS (97 CONS) III/49.1.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2019
Resolved 20 March 2019
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 20 March 2019
Resolved
BEFORE THE SHIP LEAVES PORT AND AT ALL TIMES DURING THE VOYAGE, ALL LIFE SAVING APPLIANCES SHALL BE IN WORKING ORDER AND READY FOR IMMEDIATE USE. TWO BOUYANT SMOKE SIGNALS CONTAINED WITHING THE FREE FALL LIFEBOAT ARE EXPIRED, FOR WHICH NO SPARES WERE ABAILABLE. 74 SOLAS (97 CONS) III/49.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2019
Resolved 20 March 2019
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 5 September 2018
Resolved
0920 - FIRE CONTROL PLAN - PLANS AND BOOKLETS SHALL BE KEPT UP TO DATE, ANY ALTERATION BEING RECORDED THEREON AS SOON AS PRACTICABLE. FIRE CONTROL PLAN IS MARKED AS REQUIRING (02) 20 PERSON LIFERAFTS. CERTIFICATES ISSUED REQUIRE (02) 15 PERSON LIFERAFTS TO BE KEPT ONBOARD. (02) 15 PERSON LIFERAFTS ARE IN COMPLIANCE WITH LSA CODE.
74 SOLAS (97 CON)
II-2/20.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2018
Resolved 14 September 2018
Resolution: Recieved and accetpted flag state attestation of change to fire control/safety plan to reflect the 15 passenger liferafts onboard.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 5 September 2018
Resolved
0920 - FIRE CONTROL PLAN - IN ALL SHIPS A DUPLICATE SET OF FIRE CONTROL PLANS OR A BOOKLET CONTAINING SUCH PLANS SHALL BE PERMANENTLY STORED IN A PROMINENTLY MARKED WEATHER-TIGHT ENCLOSURE OUTSIDE THE DECKHOUSE FOR THE ASSISTANCE OF SHORESIDE FIRE-FIGHTING PERSONNEL. SHIP HAS ONLY (01) FIRE CONTROL PLANS ONBOARD.
74 SOLAS (97 CON)
II-2/20.2
Action required: 10 - Deficiency Rectified
Due 5 September 2018
Resolved 5 September 2018
Resolution: SHIP PROVIDED LOCATIONS OF ADDITIONAL POSTED FIRE CONTROL PLANS, SUFFICIENTLY MET REQUIREMENT.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 5 September 2018
Resolved
0696 - WIRE ROPE FALL - FALLS USED IN LAUNCHING SHALL BE... RENEWED WHEN NECESSARY DUE TO DETERIORATION OF THE FALLS OR AT INTERVALS OF NOT MORE THAN 5 YEARS. SHIP OULD NOT PROVIDE DOCUMENTATION OF LAST RESCUEBOAT FALL REPLACEMENT.
74 SOLAS (97 CON)
III/19.4
Action required: 10 - Deficiency Rectified
Due 5 September 2018
Resolved 5 September 2018
Resolution: SHIP WAS ABLE TO PROVIDE FOR FALL MAINTENANCE RECEIPT.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 23 January 2017
Resolved
0799 - Every oil fuel pipe from a storage tank situated above the double bottom shall be capable of being closed from a safe position outside the space concerned in the event of a fire occurring in the space such tanks are situated. Fuel shut off handle to emergency generator tank was wasted and removed. - 74 SOLAS 1997 Cons. Ch. II-2/Reg. 15.2.5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 January 2017
Resolved 23 January 2017
Resolution: Deficiency rectified prior to completion of exam.
Fire Fighting › Means of Escape › Doorways
Issued 23 January 2017
Resolved
0799 - Doors required to be self-closing shall not be fitted with hold-back hooks. However, hold-back arrangements fitted with remote release devices of the fail-safe type may be authorized. Multiple doors were fitted with hold-back hooks that are required to be self-closing. 74 SOLAS 1997 Cons. Ch. II-2/Reg. 15.2.5
Action required: 705 - Other - as specified
Due 23 January 2017
Resolved 22 February 2017
Resolution: Class survey report attesting to removal of door hold back hooks.
Communications › Alarms/Indicators › Fire Alarm
Issued 23 January 2017
Resolved
1020 - The fire detection system shall initiate audible and visual alarms in sufficient places to ensure the alarms are heard and observed on the navigation bridge and by a response engineer officer. One alarm did not have working, active alarm able to be heard in the generator room. 74 SOLAS 1997 Cons. Ch. II-2/Reg. 14.2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 February 2017
Resolved 22 February 2017
Resolution: Class survey report attesting to repair of broken wire connection for generator room fire alarm.
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 28 November 2016
Resolved
33 CFR 160.206: EACH NOA MUST CONTAIN ALL OF THE INFO SPECIFIED IN TABLE 106.206
Action required: 705 - Other - as specified
Due 28 November 2016
Resolved 28 November 2016
Resolution: VESSEL SUBMITTED ACCURATE NOA; VESSEL VETTED
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 12 July 2016
Resolved
0750: Arrangements for the distribution of oil fuel shall be such as to ensure the safety of the ship and persons on board. Precautions shall be taken to prevent any fuel oil that may escape from any pump. The #1 fuel oil transfer pump is leaking. 74SOLAS(97)II-2/15.2.4 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2016
Resolution: Class report received/accepted, def cleared.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 12 July 2016
Resolved
0750: Every oil fuel pipe which, if damaged, would allow oil to escape from a settling tank shall be fitted with a cock or valve directly on the tank capable of being closed. The HFO #1 settling tank is leaking fuel into the bilge from an unknown location near the valve and/or sounding tube at the base of the tank. 74SOLAS(97)II-2/15.2.5 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2016
Resolution: Class report received/accepted, def cleared.
Engineering › Thrusters › Motor
Issued 12 July 2016
Resolved
1430: The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to ship or persons on board. Vessel reported to CG that the bow thruster was inoperable during inbound transit to port everglades. 74SOLAS(14)I/11(a) 16ac
Action required: 705 - Other - as specified
Due 26 July 2016
Resolved 13 July 2016
Resolution: Class report received/accepted, def cleared.
Operations/Management › Vessel Safety Management › Company Verification/Review/Evaluation
Issued 12 July 2016
Resolved
2565: The company should carry out internal safety audit on board and ashore at intervals not exceeding twelve months. The last record of ISM audit conducted by the company was on 05Jul2015. 74SOLAS(14)IX/3.1 ISM Code/12.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2016
Resolution: Class report received/accepted, def cleared.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 12 July 2016
Resolved
0110: The LSA and other equipment of cargo ships of 500 GT and upwards shall be subject to annual survey within 3 months before/after each anniversary date. The SOLAS Safety Equipment certificate has not completed annual/periodic surveys since the survey date of 12Jun14. 74SOLAS(14)I/8(a)(iv) 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 July 2016
Resolution: Class report received/accepted, def cleared.
Personnel › Certificates/Documents/Licenses › STCW Certificate, Chief Mate
Issued 12 July 2016
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 July 2016
Resolution: [name withheld] provided proof of applicaiton prior to departing vsl, def cleared.