Records from 2017 to 2026. Most recent: inspection, 20 May 2026.
Documentation record
Registered dimensions (L × B × D)37.6 ft × 11.8 ft × 8.3 ft
Registered tonnagegross 16 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderST PETERSBURG, FL, UNITED STATES · built 1975
Hull materialFRP (Fiberglass)
PropulsionAuxiliary Sail
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portST PETE BEACH, FL
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 30 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it16 - Regulatory (Subpart C or D), Gross Ton
11 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
20 May 2026
Administrative Inspection · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8377484
2 December 2025
Hull Examination · Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8241493
9 April 2025
Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8108552
22 February 2024
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7861317
5 December 2023
Internal Structural Exam · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7791106
12 January 2023
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7620570
17 October 2022
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7585406
25 March 2022
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7418436
1 December 2021
Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7326614
8 April 2021
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7167679
10 April 2020
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6934588
3 December 2019
Drydock Exam · In-Service Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6847137
27 February 2019
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6625391
11 January 2018
Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6336034
14 November 2017
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6306394
25 January 2017
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6077293
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 6 March 2023
Resolved
Every vessel must be fitted with a suitable magnetic compass designed for marine use to be mounted at the primary operating station.
Vessel's magnetic compass was found inoperable.
46 CFR 184.402(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 March 2023
Resolved 20 March 2023
Resolution: Vessel representative provided photograph via email of a mounting magnetic compass at the operation station, deficiency rectified.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 January 2023
Resolved
A vessel to which this subchapter applies may not be operated without having on board a valid U.S. Coast Guard Certificate of Inspection.
Vessel was due for COI inspection on 17NOV2022 and has yet to receive a COI inspection. Vessel shall not operate with passengers until new COI has been issued.
46 CFR 176.107(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 January 2023
Resolved 6 March 2023
Resolution: Issued COI to vessel upon satisfaction inspection, deficiency cleared.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 April 2022
Resolved
46 CFR 176.700 Jibstay tang through hole elongated. Provide repair proposal to replace or renew tang.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2022
Resolved 12 May 2022
Resolution: Toggle bolt at base of tang found to be fractured, replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 April 2021
Resolved
The preventative maintenance plan (PMP) should address the following at a minimum: the maintenance schedule of the rigging and associated equipment to include detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule.
The vessel's PMP is missing detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule.
Provide an updated PMP for the vessel. The updated PMP shall include at a minimum: the maintenance schedule of the rigging and associated equipment to include detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule (life cycle).
46 CFR 176.840
Action required: 705 - Other - as specified
Resolved 14 June 2021
Resolution: The operator created a PMP identifying: maintenance schedule of the rigging and associated equipment to include detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 April 2021
Resolved
The preventative maintenance plan (PMP) should address the following at a minimum: the maintenance schedule of the rigging and associated equipment to include detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule.
The vessel's PMP is missing detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule. The marine inspector identified the following during a visual inspection of the deck level standing rigging: mizzen port aft shroud toggle fork found fractured, main mast back stay toggle fork found fractured on the port side, mizzen stbd aft shroud toggle fork found fractured, one of four securing bolts used for securing the keel stepped main mast step located forward stbd side found stripped and was able to be backed out by hand, main mast found with light pitting corrosion beneath the main deck collar, main mast gooseneck cotter pin used to retain the gooseneck bolt was found corroded and broke when handled, and port/stbd shroud chain plate fasteners/nuts found heavily corroded inside of the main cabin.
The operator shall contract a third party surveyor to complete a rigging inspection to include a rigging inspection aloft. The rigging inspection shall establish a baseline to update the vessel's PMP. The updated PMP shall include at a minimum: the maintenance schedule of the rigging and associated equipment to include detailed protocol for examinations and inventory of rigging components including age of component as well as size and replacement schedule (life cycle). A third party rigging survey does not substitute for the vessel owner/operator from implementing a PMP or conducting/documenting preventative maintenance. The operator must replace all standing rigging components found in a damaged condition and back out the corroded chain plate fasteners for visual inspection by a USCG marine inspector. Contact the USCG marine inspector to be present for the third party surveyor's inspection aloft. Visually monitor the corrosion on main mast and replace mast step bolt found stripped.
46 CFR 176.840
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 April 2021
Resolution: The operator contracted a third party rigging surveyor to complete a rigging survey to include a survey aloft. All damaged rigging on the vessel was replaced in kind. A separate 835 for a PMP was issued.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 April 2021
Resolved
A life jacket shall be on board for each person to include passengers and crew. 01 life jacket was found with damaged retro reflective material. Renew retro reflective material and place life jacket back into service. 01 life jacket was found with a damaged retaining strap clip. Replace life jacket in kind.
46 CFR 180.71(a)
Action required: 10 - Deficiency Rectified
Due 8 April 2021
Resolved 8 April 2021
Resolution: The operator had 02 brand new spare Coast Guard approved lifejackets in a storage space on shore. The 02 new lifejackets were placed into service on the vessel.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 April 2021
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines. The operator tested the fuel shutoff valve and it would not close. Provide maintenance and prove operation of the fuel shutoff valve or replace the valve in kind.
46 CFR 182.455(b)(4)
Action required: 10 - Deficiency Rectified
Due 8 April 2021
Resolved 8 April 2021
Resolution: The operator used a lubricant to free the valve and cycled the valve several times. The valve was successfully tested and placed back into service.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 January 2017
Resolved
Passed annual inspection on 02JUL16. Complete annual inspection prior to carrying passengers. 46CFR176.105
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 January 2017
Resolution: Completed Annual inspection.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 25 January 2017
Resolved
Repair bilge high level alarm/audible system. 46 CFR 182.530
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2017
Resolution: Bilge alarms were operational.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 25 January 2017
Resolved
Provide appropriate mount for operating station portable fire extinguisher. 46 CFR 181.500
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 31 January 2017
Resolution: A bracket was installed.
Lifesaving › Lifefloat › Retroreflective Material
Issued 25 January 2017
Resolved
Replace retroflective tape on ring buoy. 46 CFR 180.70
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2017
Resolved 31 January 2017
Resolution: Retro was afixed to the ring.