Records from 2018 to 2026. Most recent: inspection, 28 May 2026.
Inspection history · 9
28 May 2026
PSC B
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8382048
2 October 2024
PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8010631
1 September 2023
Deficiency Check
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7782360
17 June 2023
Damage Survey
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7717015
16 May 2022
PSC B · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7451743
4 October 2019
COE-Dockside · ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6826330
4 October 2019
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6830606
9 May 2019
ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6680168
28 August 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6525073
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 17 June 2023
Resolved
Condition of the ship and equipment must be maintained to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed a 13 inch transverse crack in the bulkhead above the stern tube thru hull opening inside the engine room.
74 SOLAS (20) I/11A
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2023
Resolved 2 October 2024
Resolution: Corrected and verified during inspection and inside DNV class report.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 October 2019
Resolved
Electrical installations shall be such that all auxilliary services neccessary for maintaining the ship in normal operational and habitable conditions will be ensured without recourse to the emergency source of electrical power. Ships breaker failed from SSDG, causing emergency generator to kick on and provide power. SOLAS74(2014cons)II-1/40.1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 October 2019
Resolution: Vessel repaired and tested equipment to the satisfaction of class and MSUPA Marine Inspectors.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 October 2019
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a class society which is recognized. Ship has installed piping system for maintenance not in accordance with ship drawings. SOLAS74(2014cons)II-1/3.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 October 2019
Resolution: Vessel's class has attended and required drawings of the piping modification to be submitted for approval prior to 06JAN20.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 4 October 2019
Resolved
The Administration may permit the use of oil level gauges with flat glasses & self closing valves. Self closing valves are gagged open and will not operate. SOLAS74(2014cons)II-2/4.2.2.3.5.2.2
Action required: 10 - Deficiency Rectified
Resolved 4 October 2019
Resolution: Vessel removed all gagging devices to the satisfaction of the attending PSCE.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 28 August 2018
Resolved
Nonconducting mats or gratings shall be provided at front and rear of main and emergency switchboards. Nonconducting mats missing at front and rear of 06 switchboards.
**Vessel did order nonconducting mats while exam team was on board. Invoice uploaded under deficiency documents**
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 September 2018
Resolved 2 September 2018
Resolution: Vessel purchased and installed non-conductive matting. See Documents for picture and receipts.