Records from 2015 to 2026. Most recent: inspection, 28 January 2026.
Documentation record
Registered dimensions (L × B × D)491.8 ft × 72.0 ft × 41.0 ft
Registered tonnagegross 9,628 / net 9,628
ITC dimensions (L × B × D)491.8 ft × 72.0 ft × 41.0 ft
ITC tonnagegross 11,354 / net 6,082
BuilderFINCANTIERI BAY SHIPBUILDING · STURGEON BAY, WI, UNITED STATES · built 2018
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 18 November 2025 · expires 31 December 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it19684 - Dead Weight, Gross Ton
24268 - Displacement, Gross Ton
11354 - Convention (Subpart B), Gross Ton
9628 - Regulatory (Subpart C or D), Gross Ton
6082 - Convention (Subpart B), Net Ton
9628 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
28 January 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8303081
23 December 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8286825
20 November 2025
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8271812
8 October 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8249650
11 February 2025
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8078103
5 June 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7928904
16 November 2023
Examination of Repairs · Administrative Inspection · COI Inspection · Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7825789
16 March 2023
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7657630
15 February 2023
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7637234
25 January 2023
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7627006
17 October 2021
MTSA Verification · Internal Structural Exam · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7331037
19 March 2021
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7159277
2 March 2021
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7148903
6 February 2020
Ballast Water Examination · Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6904419
7 February 2019
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6619525
4 June 2015
Deficiency Check · Administrative Inspection · Examination of Repairs · In-Service Inspection · Welding Related Inspections Qualification Testing · Initial Certification · MTSA Verification · Construction Oversight
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6503868
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 November 2025
Resolved
Each generator arranged for parallel operation must have reverse-power or reverse-current trips. Crew was not able to test reverse power relay trips, test in presence of a Marine Inspector.
46 CFR 32.45-1
46 CFR 111.12-11(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 January 2026
Resolution: Witnessed reverse power realy testing on Gens 1 & 3.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 20 November 2025
Resolved
When liquid cargoes other than those referred to in paragraph 6.1...additional safety measures shall be required, having due regard to the provisions of the International Bulk Chemical codes defined in regulation VII/8.1, the Bulk Chemical Code. The conditions of the ship and its equipment shall be maintained to conform with the provisions of the code to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board or without presenting an unreasonable threat of harm to the marine environment. Barge's Inert Gas system was inoperable preventing tests from being conducted. Conduct tests in the presence of a Marine Inspector.
74SOLAS(2020)II-2/6.2
IBC Code 1.5.3.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 January 2026
Resolution: Witnessed IGG testing
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 November 2025
Resolved
Each portable container of flammable or combustible liquid used for portable auxiliary equipment must be stowed in a paint locker or an open location designated by the master. The "Alcohol" flame locker doors were not latching secure.
46 CFR 147.45(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 January 2026
Resolution: New locker installed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 December 2023
Resolved
The inspection shall be such as to insure that the vessel, as regards the...electrical installations..., is in satisfactory condition and fit for the service for which it is intended.
Vessel was unable to test the reverse power relays for the generators as required by 46 CFR 111.12-11(f).
46 CFR 31.10-15(b)
Action required: 17 - Rectify deficiencies prior to departure
Due 27 December 2023
Resolved 29 December 2023
Resolution: MIs were provided satisfactory video evidence of the test of the reverse power relay.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 December 2023
Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have onboard an emergency means to enable the person in charge of a transfer operation to a facility, to another vessel, or within the vessel to stop the flow of oil or hazardous material.
Vessel was unable to test the emergency stop for the aft electric cargo pump (designated for phenol).
46 CFR 155.780(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 December 2023
Resolved 29 December 2023
Resolution: MIs witnessed satisfactory emergency shutdown of the electric cargo pump designated for phenol.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 December 2023
Resolved
The last 1.0 meter of vapor piping upstream of the vessel vapor connection...must be-painted in the sequence of red/yellow/red. The width of the red bands must be 0.1 meter and the width of the middle yellow band must be 0.8 meter; and labeled with the word "VAPOR" painted in black letters at least 50.8 mm (2 inches) high.
MI observed the vapor collection system for the phenol cargo piping was not appropriately marked.
46 CFR 39.2001(h)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2024
Resolved 28 December 2023
Resolution: VCS lines properly marked.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 December 2023
Resolved
The inspections and tests shall insure that the equipment and associated structure are in satisfactory operating conditions and fit for the service in which they are intended.
MI observed the handle for IG system valve HV-6.31 was significantly corroded and had multiple holes, compromising its integrity.
46 CFR 31.30-1
46 CFR 61.01-1(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2024
Resolved 28 December 2023
Resolution: Handle replaced.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 25 January 2023
Resolved
Where firefighting equipment is not required, but is installed, the equipment and its installation shall be of an approved type.
Annual fire fighting equipment servicing conducted NOV 2022 has outstanding inoperable equipment (alarm pull station and horn). Repair and/or replace units and verify installation with approved technician. Provide technician report to USCG.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2023
Resolved 16 October 2023
Resolution: Replaced strobe and alarm pull station.
12 - Dangerous Goods › N/A - No Subsystem › Special requirement
Issued 6 February 2020
Resolved
Vessels carrying toxic of flammable products or both
shall be equipped with at least two instruments designed
and calibrated for testing for the specific vapors in
question. Vessel's secondary means for testing toxic
vapors(dragger tubes) were expired. Vessel is prohibited
from loading Aceton or Phenol until providing proof of
receipt of new dragger tubes.
Action required: 10 - Deficiency Rectified
Due 11 February 2020
Resolved 11 February 2020
Resolution: Kirby Representative provided pictures of new Dragger Tubes.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 6 February 2020
Resolved
When Table 1 in 46 CFR 153(Subchapter O) refers to this
section, a cargo containment system must have a
permanent inert gas system(IGS). The vessels CAA list
n-Propylamine as a authorized cargo with a special
requirement for a IGS. Vessel personnel could not prove
proper operation of the installed inert gas system.
Vessel is prohibited from carrying n-Propylamine until
proper operation of the IGS is proven to the
satisfaction of the USCG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2021
Resolution: MI witnessed vessel crew operate IG system.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 6 February 2020
Resolved
Each generator arranged for parallel operation must have
reverse-power or reverse-current trips. Vessel was
equipped with multiple generators capable of parallel
operation. Reverse-Power safety's were unable to be
successfully tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 February 2020
Resolution: Received tech report showing successful testing of the reverse power trips.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2018
Resolved
Bergan tank level and alarm monitoring system testing incomplete at delivery. System to be serviced by naufacture/vendor service representative. At delivery the following discrepancies were observed: cargo tank #1 port and starboard high level and overflow alarms, cargo tank #3 starboard temperature detector, cargo tank #4 port high level and overflow alarms, cargo tank #4a starboard high level and overflow alarms, cargo tanks #1 starboard and #2 port and starboard temperature sensors malfunctioning. Ballast tank level scale (~ 67' DEPTH) was incorrect. Diesel fuel oil tank level indicator malfunctioning. Ballast tank #2 port and forepeak appear to be reversed. When complete, contact cognizant OCMI, with CG Marine Inspector to attended and verify the Bergan tank level and alarm monitoring system.
46 CFR 39.2003 and 46 CFR 39.2009
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 7 February 2019
Resolved 7 February 2019
Resolution: CG witnessed SAT alarms on all cargo tanks
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2018
Resolved
Cargo tank #4 port, at delivery deep well suction valve stem was found bent. Valve be repaired or replaced and tested to satisfaction of attending ABS Classification Surveyor. 46CFR32.50-15(b)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2019
Resolved 7 February 2019
Resolution: CG and ABS Verified valve was replaced. Tested all SAT.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2018
Resolved
Cargo tanks #1 port and starboard, at delivery Acetone cargo pump explosion proof electric motor was not installed. Install Acetone cargo pump explosion proof electric motor. When complete, contact cognizant OCMI, with CG Marine Inspector to attend, verify installation, confirm explosive rating and test of emergency shutdown. 46CFR32.50-1 & 46CFR32.50-3
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2019
Resolved 7 February 2019
Resolution: CG verified new explosion proof electric motor was installed and working properly.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2018
Resolved
Cargo tanks #4 and #4a's, Phenol cargo pump explosion proof electric motor not installed at delivery. Install the Phenol cargo pump explosion proof electric motor. When complete, contact cognizant OCMI, CG Marine Inspector to attend, verify installation, confirm explosive rating and test of emergency shutdown. 46CFR32.50-1 &46CFR32.50-3
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2019
Resolved 7 February 2019
Resolution: CG verified new explosion proof electric motor was installed and working properly.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2018
Resolved
Several discrepancies were noted on the Volcanic Thermal Glycol Heating System by attending ABS Class Society Surveyor during initial delivery. The Volcanic Thermal Fluid Heater shall not be operated until confirmation is provided and received from an attending ABS Surveyor that all outstanding items of class (OSR's) and discrepancies noted in ABS Sturgeon Bay initial survey new construction report SB2947709 were tested and examined to the satisfaction of the class surveyor. 46CFR63.10-1 & 46CFR 63.15-1
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2019
Resolved 7 February 2019
Resolution: CG verified all discrepancies were corrected. ABS witnessed all repairs by Volcanic.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2018
Resolved
Cargo tank #4a port and starboard thermal fluid heating expansion loops wsere not properly supported with sufficient pipe hangers at delivery. It is recommended that appropriate pipe supports be added to the mid-point of the cargo tank 4a port and starboard heating expansion loops. Sufficient hanger to be added and examined to the satisfaction of the attending ABS Class Surveyor.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2019
Resolved 7 February 2019
Resolution: CG and ABS verified new metal bracket had been fabricated to properly support expansion loops.