Records in 2016. Most recent: inspection, 9 October 2016.
Inspection history · 4
9 October 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6019092
7 October 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6018079
21 September 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6006170
12 September 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5998661
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 13 September 2016
Resolved
The condition of the ship and it's equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to sea without danger to the ship or persons on board. Temporary flexible hoses were found rigged, connectiong hydrolic sump tanks in steering gear room.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 13 September 2016
Resolved 15 September 2016
Fire Fighting › Structural - A Class Divisions › Doors
Issued 13 September 2016
Resolved
Stairways and lift trunks which penetrate more than a single deck shall be protected by self closing doors at all levels. Self closing doors in engine room were tied open. Door on boat deck level leading to engine room would not self close.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 September 2016
Resolved 15 September 2016
Lifesaving › Inflatable Liferafts › Capacity
Issued 13 September 2016
Resolved
Cargo ships shall carry one or more inflatable liferafts on each side and the capacity shall be sufficient to accomodate the total number of persons on board. Life radft capacity on each side less than 19 persons.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 13 September 2016
Resolved 15 September 2016
Navigation › Emergency Steering › Compass Reading for Emergency Steering
Issued 13 September 2016
Resolved
All ships 500gt and upwards shall have a gyro compass heading repeater to supply heading information visually at the emergency steering position. Reading of gyro repeaters differed 45 degress between bridge and steering gear room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 October 2016
Resolved 15 September 2016
Engineering › Steering Gear System › Follow-up Assembly
Issued 13 September 2016
Resolved
The main steering gear shall be capable of putting the rudder over from 35 degrees to 35 degrees on the other side. The rudder limits were 28 degrees to 32 degrees.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 October 2016
Resolved 15 September 2016
Documentation › Logs/Records › Bunker Delivery Notes/Samples
Issued 13 September 2016
Resolved
The vessel operator shall keep a written record available for inspection of each item tested under 33CFR 156.170. Bunker transfer pipe shall be hydrostatically tested at 1.5 MAWP.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 September 2016
Resolved 15 September 2016
Lifesaving › Rescue Boat Equipment › Buoyant Line
Issued 13 September 2016
Resolved
The normal equipment of every rescue boat shall consist of: one buoyant lifeline not less that 50m in length, of sufficient strength to tow a life raft. No tow line present on rescue boat.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 September 2016
Resolved 13 September 2016