Records from 2016 to 2026. Most recent: inspection, 12 February 2026.
Inspection history · 23
12 February 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8310072
8 January 2026
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8282895
23 May 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8155819
3 April 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8104767
17 January 2025
Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8069236
6 January 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8059074
1 March 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7872495
17 January 2024
Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7850722
5 January 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7845762
24 May 2023
In-Service Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7695562
30 March 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7660036
23 November 2022
COI Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7596361
2 March 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7404412
20 January 2022
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7375440
16 March 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7150271
11 February 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7140153
4 November 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6846620
18 March 2019
Excursion Permit
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6644924
13 February 2019
Inclining Experiment · Internal Structural Exam · Deadweight Survey · Drydock Exam · Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6625529
13 November 2018
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6578081
16 October 2018
Security Breach, Potential · Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6571556
8 January 2018
Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6334493
2 December 2016
Initial Certification · Examination of Repairs · Inclining Experiment · Administrative Inspection · Construction Oversight · Deficiency Check · Plan Review (Other than "T")
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6053695
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 January 2026
Resolved
Wire connectors utilized in conjunction with screw type terminal blocks must be of the captive type such as the ring or the flanged spade type.
Multiple terminal connectors installed for the bridge electrical system are non-flanged spade type connectors. Proper terminal rings or flanged spade type connectors must be installed onto all terminal blocks/boards.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 15 January 2026
Resolution: received pictures showing correct connection points
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 17 January 2025
Resolved
Any vessel of at least five net tons which engages in the fisheries on the navigable waters of the United States or in the Exclusive Economic Zone, or coastwise trade. Vessel COD expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2025
Resolved 19 February 2025
Resolution: Vessel renewed COD, valid when pulled in MISLE.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 2 March 2022
Resolved
IBAs removed from vessel for servicing. Based on LBS route, vessel operating within one mile from land is not required to carry survival craft. Vessel restricted to operating within one mile from land. Notify this office once IBAs are returned to service on vessel.
Action required: 705 - Other - as specified
Resolved 6 April 2022
Resolution: IBAs returned to service.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 March 2021
Resolved
A patch of fire protection is missing overhead outboard on the sbd side above sewage pipe in engineroom. Another patch of fire protection is missing above switch panel. Needs to be replaced. 46CFR116.415(a)(2)(i)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: Missing patches were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 November 2019
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Replace placards which reflect the style of life jackets carried on board.
46 CFR 122.516 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 November 2019
Resolved 18 November 2019
Resolution: Confirmed that the lifejacket donning placards have been replaced and conincide with the style of lifejackets carried on board.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 November 2019
Resolved
An alarm for a fixed gas fire extinguishing system must be clearly and conspicuously marked “WHEN ALARM SOUNDS - VACATE AT ONCE. CARBON DIOXIDE BEING RELEASED.” Where a different extinguishing agent is installed, that agent shall be marked in place of “carbon dioxide.” Install placard in vicinity of the alarm in the engine room.
46 CFR 122.612 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 November 2019
Resolved 25 November 2019
Resolution: Vsl Rep sent a picture of the sign with the required verbiage located next to the siren.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 November 2019
Resolved
Excessive accumulation of oil, trash, debris or other matter might create a fire hazard, clog bilge pumping systems, or block emergency escapes. Remove oil and debris from the bow thruster and reefer space bilges.
Action required: 10 - Deficiency Rectified
Due 8 November 2019
Resolved 8 November 2019
Resolution: Ensured oil and debris from the bilges was cleaned up.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 6 November 2019
Resolved
Each survival craft must be stowed in a way that any protective covers will not interfere with launching and embarkation. The cover over the life floats prevents them from floating free. Cover must be removed while passengers are on board.
46 CFR 117.130 (a)
Action required: 10 - Deficiency Rectified
Due 6 November 2019
Resolved 6 November 2019
Resolution: Remove cover when passengers are on board.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 6 November 2019
Resolved
A vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. The vessel has not updated its paper or electronic charts since 2017.
46 CFR 121.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2019
Resolved 18 November 2019
Resolution: Confirmed that both the electronic charts and paper charts have been updated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 November 2019
Resolved
During inspection, unable to complete Boiler PSTPs. These PSTPs must be conducted in the presence of CG Marine Inspectors.
46 CFR 119.310(c).
46 CFR 61.35
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2019
Resolved 8 November 2019
Resolution: Vsl Reps completed Boiler PSTPs.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 6 November 2019
Resolved
During the inspection, a drop of diesel fuel was found on a weld for the fuel fill line (piping), starboard fuel tank, directly above a transformer. Investigate leak and report findings.
46 CFR 115.840
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2019
Resolved 27 November 2019
Resolution: Received an email from [name withheld] stating that the vessel had just finsihed topping off the fuel tanks. They had taped a paper towel around the pipe where the drip was seen during the annual inspection. There was no sign of fuel on the towel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 November 2019
Resolved
During the inspection, a potential crack in the aluminum bow thruster tunnel was identified on the stbd side of the thruster joint. Clean up area and remove coating in way of this area and use dye pen to ensure satisfactory condition.
46 CFR 115.840
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2019
Resolved 8 November 2019
Resolution: Cleaned the area and conducted a dye penetrant test. The results came back negative with no surface crack.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 November 2019
Resolved
The vessel owner must ensure the designation of restricted areas on board the vessel. These include navigation bridge, machinery spaces, and control stations. See list in 33 CFR 104.270(b).
33 CFR 104.270
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2019
Resolved 20 November 2019
Resolution: eceived an email from [name withheld] containing pictures of restriced area signs on both doors entering the navigation bridge and the machinery spaces. Found to be sat.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 4 November 2019
Resolved
The vessel's IBAs exceeded its servicing interval due date of OCT 2019. Vessel is restricted to operate within one mile from land until IBAs are serviced.
46 CFR 117.25(a)
46 CFR 117.207(d)
46 CFR 160.151-57(n)(1)
Action required: 705 - Other - as specified
Resolved 18 November 2019
Resolution: IBAs have been serviced, reinstalled properly and the HRUs were replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 March 2019
Resolved
SALISH EXPLORER has undergone modifications which affected the vessel's stability characteristics. A new stability test and stability evaluation were completed and submitted to the Marine Safety Center (MSC) by a qualified naval architect, but the MSC has not yet completed their review of the calculations. Prior to receipt of final approval and an amended stability letter from the MSC, the vessel may operate, but may not carry in excess of 250 passengers, 6 crew members, and 10 persons in addition to the crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2019
Resolved 22 March 2019
Resolution: Received approved stability letter for vessel.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 2 December 2016
Resolved
Install and test emergency engine room lighting for evacuation paths IAW 46 CFR 120.432.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 December 2017
Resolution: Lights installed and tested.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 2 December 2016
Resolved
Prove operation of fire alarm panel emergency battery backup IAW 46 CFR 120.310(a)(1)(i).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 December 2017
Resolution: Tested emergency battery back-up.
Fire Fighting › Fire Pumps › Arrangement
Issued 2 December 2016
Resolved
Fire pump programming is only allowing the pump to be operated in either local OR remote operation. Prove operation of pump from both locations IAW 46 CFR 118.300(e).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 December 2017
Resolution: Tested operation of fire pump from local and remote stations.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 2 December 2016
Resolved
Provide adequate pressure/charge IAW with manufacturer's pressure-temperature relationship chart to fixed extinguishing system main FM-200 bottle IAW 46 CFR 118.410(a)(3).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 December 2017
Resolution: Fire servicing technicians added extinguishing agent to meet required pressure for the current tempuature of the space.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 2 December 2016
Resolved
Heat actuated devices (HAD) do not trigger the pilot bottle when heated individually, both have to be heated at the same time to release the pilot bottle piercing pin. Manufacturer’s instructions specify that each HAD is to be tested individually with five minutes in between to reset. Prove operation IAW manufacturer's instructions and 46 CFR 118.410(a)(3).
Action required: 705 - Other - as specified
Due 27 January 2018
Resolved 2 February 2018
Resolution: HAD's were removed as they were not required IAW 46CFR118.410 as the storage cylinder for the fixed gas system are not installed in the space it is protecting.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 2 December 2016
Resolved
Fixed engine room extinguishing system's 30 second time delay activated at 23 seconds. Manufacturer's instructions do not give a time variance from 30 seconds. Prove proper operation of time delay or approval from manufacturer for the 7 second difference IAW 46 CFR 118.410(a)(3).
Action required: 705 - Other - as specified
Due 5 March 2018
Resolved 13 March 2018
Resolution: Witnessed succesful operation of 30 second delay. All sat.