← All vessels
ES WARRIOR
ES WARRIOR is a freight ship. The Coast Guard has recorded 9 inspections since 2016, most recently in January 2026, along with 5 deficiencies and 1 operational control.
Records from 2016 to 2026. Most recent: inspection, 30 January 2026.
- Built
- Not recorded
- Last inspected
- 30 January 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 5 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9775854 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3FDI9
1423635
Flag
PANAMA
—
Maury page id
psix-1423635
Inspections, by type
…with no type recorded1
Years with a record
6 calendar years (2016–2026)
The 9 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it34157 - Convention (Subpart B), Gross Ton
60513 - Dead Weight, Metric Ton
71222 - Displacement, Metric Ton
20042 - Convention (Subpart B), Net Ton
60513 - Dead Weight, Metric Ton
71222 - Displacement, Metric Ton
20042 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 9
30 January 2026
Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8304081
26 January 2026
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8298224
29 February 2024
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7867519
10 November 2021
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7344188
5 November 2021
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7346262
5 November 2021
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7346294
16 April 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6386501
12 June 2017
Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6173985
21 October 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6021783
Deficiency record · 5
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 January 2026
Resolved
IF A STEAM PIPE OR FITTING MAY RECIEVE STEAM FROM ANY SOURCE AT A HIGHER PRESSURE THAN THAT FOR WHICH IT IS DESIGNED A SUITABLE...REDUCING VALVE, RELIEF VALVE AND PRESSURE GAUGE SHALL BE FITTED. PSCO OBSERVED TEMP CONTROL VALVE FOR NO. 1 FUEL OIL HEATER SEIZED IN THE OPEN POSITION AND UNABLE TO CLOSE.
SOLAS (24) II-1/ 33.3
16 AC
Electrical › Electric Generation Source (emergency) › Number of Sources
Issued 16 April 2018
Resolved
1430-Auxilary engines-Each emergency generating set arranged to be automatically started shall be equipped with starting devices apprroved by the Administration with a stored energy capability of at least three consecutive starts. PSCO observed that the emergency generator did not start with the batteries designated as primary souce of starting. Secondary spring start was tested SAT. SOLAS 74 (a) 2014 Cons. II-1/44.2 60a
Electrical › Electric Generation Source (emergency) › Generator
Issued 21 October 2016
Resolved
PROVISION SHALL BE MADE FOR THE PERIODIC TESTING OF THE COMPLETE EMERGENCY SYSTEM ANS SHALL INCLUDE THE TESTING AND AUTOMATIC STARTING ARRANGMENTS. THE CREW WAS UNAWARE OF A SECOND METHOD OF STARTING THE EMERGENCY GENERATOR, MEANING THIS METHOD OF STARTING HAD NEVER BEEN TESTED AND THAT THE CREW HAD NOT BEEN TESTING THE COMPLETE EMERGENCY SYSTEM. 74 SOLAS (14) II-1/43.7, 10C
Operations/Management › Drills/Instruction › Fire
Issued 21 October 2016
Resolved
CREW MEMBERS SHALL RECEIVE INSTRUCTIONS ON THEIR ASSIGNED DUTIES. CREW MEMBERS WERE UNFAMILIAR WITH THEIR ASSIGNED DUTIES DURING A GALLEY FIRE DRILL. 74 SOLAS (14) II-2/15.2.1.2, 10C
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 21 October 2016
Resolved
SHIP STAFF TRAINING SHOULD INCLUDE FAMILIARIZATION IN THE OPERATION AND MAINTENANCE OF THE EQUIPMENT. THE CREW COULD NOT DEMONSTRATE ADEQUATE FAMILIARIZATION WITH THE OILY WATER SEPERATOR. MARPOL
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.