Records in 2018. Most recent: inspection, 8 June 2018.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 8 June 2018
No resolution recorded
33CFR155.480(a)(1)- On a tankship, each cargo tank must be equiped with an overfill device that meets the requirments for tank overfill alarms. High alarm on Tank 5c is not operational. 40ac
Condition: Design Flaw
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 1 May 2018
Resolved
Recovery time of the rescue boat shall not be more than 5 minutes in moderate sea conditions. The rescue boat was not recoverable during the Port State Control Exam due to the shaft of the electric motor breaking off. -SOLAS 2014 CH III Reg17.4
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Electric motor replaced with spare and demonstrated proper functionality.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 1 May 2018
Resolved
Efficient guard rails shall be fitted to all exposed parts of the freeboard, the height of which shall be at least 1m from the deck. Vessel has a significant bend along the railing where they placed a piracy solution jet gun aft of the starboard lifeboat. -ICLL 2005 Annex I Reg 25 (2)
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Per the Class Survey, the defect is to be treated as condition, so that it may be rectified and confirmed at the attendance of surveyor ASAP, but no later than 30 JUN 2018.
Fire Fighting › Fire Hoses › Connections
Issued 1 May 2018
Resolved
Fire hoses shall be connected to outlets at all times. Fire hoses throughout machinery spaces are not connected to their outlets. -46CFR 34.10-10(l)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Per the Class Survey, the defect is to be treated as condition, so that it may be rectified and confirmed at the attendance of surveyor ASAP, but no later than 30 JUN 2018.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 1 May 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. The Port State Control Officer observed a failed gasket causing an active leak on the steampipe from the boiler. -SOLAS 2014 Ch 1 Reg 11 (a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Per the Class Survey, the defect is to be treated as condition, so that it may be rectified and confirmed at the attendance of surveyor ASAP, but no later than 30 JUN 2018.
Engineering › Sea-water System (primary cooling) › Pump
Issued 1 May 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. The Port State Control Officer observed an active leak at a rate of approximately 20-30 drops per second on the main cooling pump from the sea chest. -SOLAS 2014 Ch 1 Reg 11 (a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Per the Class Survey, the defect is to be treated as condition, so that it may be rectified and confirmed at the attendance of surveyor ASAP, but no later than 30 JUN 2018.