ETHANE OPAL is a 2016 tank ship. The Coast Guard has recorded 19 inspections since 2017, most recently in October 2025, along with 3 deficiencies and 1 operational control.
Records from 2017 to 2025. Most recent: inspection, 28 October 2025.
- Built
- 2016
- Last inspected
- 28 October 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 3 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9752292 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7TM6
1428824
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1428824
Inspections, by type
…with no type recorded3
Years with a record
9 calendar years (2017–2025)
The 19 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it57509 - Convention (Subpart B), Gross Ton
18260 - Convention (Subpart B), Net Ton
59110 - Dead Weight, Metric Ton
78649 - Displacement, Metric Ton
18260 - Convention (Subpart B), Net Ton
59110 - Dead Weight, Metric Ton
78649 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 19
28 October 2025
Administrative Inspection · COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8255457
9 December 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8044913
16 September 2024
COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7999245
10 April 2024
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7893461
21 September 2023
PSC B · COC-GAS Annual · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7795813
15 July 2023
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7742958
15 September 2022
COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7554588
20 October 2021
PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7334274
20 October 2021
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7337665
10 April 2021
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7176552
6 October 2020
Administrative Inspection · PSC B · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7070240
6 October 2020
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7073877
20 November 2019
Ballast Water Examination · ISPS II Exam · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6853387
24 July 2019
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6761272
24 July 2019
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6789036
14 January 2019
Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6605328
15 March 2018
Ballast Water Examination · COC-GAS Annual · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6366426
9 March 2017
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6223773
6 February 2017
PII Safety Exam · ISPS III Exam · COC-GAS Renew · Ballast Water Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6075795
Deficiency record · 3
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 July 2019
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to...other hazards.
The vessel experienced an equipment failure while transiting the navigable waters of the United States which adversely affected its maneuverability and posed a hazard to vessels and infrastructure along the Houston Ship Channel.
Submit for review a Classification Society report to [email withheld] attesting to the cause of the equipment failure, that authorized temporary or permanent repairs have been completed, and that the vessel's full and normal maneuverability has been restored.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 15 March 2018
Resolved
01 -1850- On ships carrying flammable and/or toxic products, a water-spray for cooling, fire prevention and crew protection should be installed to cover: Exposed cargo tank domes, cargo liquid and vapor discharge loading manifolds. 74SOLAS(14CONS)VII 13.1 REF IGC 11.3.1 10(c)
Documentation › Safety Management System › Safety/Environmental Protection Policy
Issued 15 March 2018
Resolved
The company should establish procedures, plans, and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protections of the environment. The various tasks should be defined and assigned to qualified personnel. The crew could not produce procedures for testing and flushing of deck water spray system. PSCO observed isolation valves for port and starboard manifolds to be closed during test of deck spray while ship was connected for cargo operation on a cargo waiver.
74SOLAS(14CONS)VII/13.1 REF: ISM 7 50a/c
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.