MAURY USCG vessel records
← All vessels

KANG MAY

KANG MAY is a freight ship. The Coast Guard has recorded 6 inspections since 2017, most recently in January 2024, along with 1 deficiency and 1 operational control.

Records from 2017 to 2024. Most recent: inspection, 16 January 2024.

Built
Not recorded
Last inspected
16 January 2024
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 January 2024
Operational controls None recorded without a removal date
Years with a record 5 calendar years (2017–2024)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9774472
1429399
Flag
LIBERIA
Maury page id
psix-1429399

Documentation record

Tonnage as PSIX records it70000 - Dead Weight, Metric Ton
13276 - Displacement, Metric Ton
27488 - Convention (Subpart B), Net Ton
46990 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 6

16 January 2024 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7829269
11 October 2020 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7075186
29 April 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6672421
8 March 2019 Administrative Inspection · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6929945
6 August 2018 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6496452
9 April 2017 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6111466

Deficiency record · 1

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 October 2020 Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due reard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose for which the equipment is intended, the working conditions to which it will be subjected and the environmental conditions onboard. PSCO received report that #4 fuel oil injector for #4 cylinder malfunctioned resulting in a propulsion irregularity due to a high cylinder exhaust temperature on #4 cylinder. PSCO observed that bothfuel oil injectors for the #4 cylinder had been replaced after propulsion irregularity and before PSCO's arrival. Demonstrate operational readiness of main diesel engine
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 October 2020
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.