← All vessels
PADEREWSKI
PADEREWSKI is a 2016 freight ship. The Coast Guard has recorded 14 inspections since 2017, most recently in May 2025, along with 2 deficiencies and 2 operational controls.
Records from 2017 to 2025. Most recent: operational control imposed, 31 May 2025.
- Built
- 2016
- Last inspected
- 31 May 2025
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9731389
5LPK7
1430147
Flag
LIBERIA
Maury page id
psix-1430147
Inspections, by type
…with no type recorded3
Years with a record
6 calendar years (2017–2025)
The 14 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it13318 - Displacement, Metric Ton
24778 - Convention (Subpart B), Gross Ton
31672 - Dead Weight, Metric Ton
10318 - Convention (Subpart B), Net Ton
24778 - Convention (Subpart B), Gross Ton
31672 - Dead Weight, Metric Ton
10318 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 14
31 May 2025
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8148675
29 May 2025
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8147335
26 April 2025
PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8116810
9 May 2023
PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7684332
11 July 2022
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7503309
29 June 2022
Deficiency Check · PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7486012
25 June 2022
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7486504
20 December 2020
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7117378
30 November 2020
Deficiency Check · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7103909
9 November 2020
PSC B
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7090200
28 April 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6944918
21 December 2018
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6601649
12 February 2018
COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6350782
13 March 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6101660
Deficiency record · 2
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 April 2025
Resolved
The purpose of this regulation is to maintain and monitor the effectiveness of the fire safety measures the ship is provided with. For this purpose, the following functional requirements shall be met: Fire protection systems and fire fighting systems and fire-fighting systems and appliances shall be maintained ready for use. PSCO observed failed fired hydrant valve gasket while testing emergency fire pump, due to leak the fire hose could not obtain and maintain pressure.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 29 June 2022
Resolved
1. The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSCO observed excessive fuel oil leaks on high pressure fuel system for all three generators onboard; including atomizing fuel oil on generator #3 cylinder #6. Additionally, lube oil leak observed on #2 generator lube oil cooler.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.