← All vessels
HAFNIA PRIDE
HAFNIA PRIDE is a 2016 tank ship. The Coast Guard has recorded 11 inspections since 2017, most recently in September 2026, along with 1 deficiency and 1 operational control.
Records from 2017 to 2026. Most recent: inspection, 8 September 2026.
- Built
- 2016
- Last inspected
- 8 September 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 1 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9737747 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9V7897
1430585
Flag
SINGAPORE
—
Maury page id
psix-1430585
Inspections, by type
…with no type recorded1
Years with a record
7 calendar years (2017–2026)
The 11 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it74996 - Dead Weight, Ton
89195 - Displacement, Ton
22260 - Convention (Subpart B), Net Ton
43142 - Convention (Subpart B), Gross Ton
89195 - Displacement, Ton
22260 - Convention (Subpart B), Net Ton
43142 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 11
8 September 2026
COC-TVE Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8486215
7 January 2025
COC-TVE Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8059385
11 April 2024
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7893839
11 March 2024
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7876965
20 January 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7852116
20 January 2024
COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7852119
15 January 2024
Administrative Inspection · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7849491
22 May 2023
PSC B · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7694060
16 September 2021
COC-TVE Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7313491
15 January 2019
Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6607069
30 January 2017
COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6079745
Deficiency record · 1
14 - Pollution Prevention › 148 - Ballast Water › Extraordinary Condition Claims
Issued 23 January 2024
Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030 (a), use an AMS as described in 151.2025 (a) (3), or ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this section. Subject vessel, of keel laid date 23JUN2014 and ballast water capacity of 21457 m3, is past its compliance date per the implementation schedule in 33 CFR 151.2035 (b). Currently, vessel's installed BWTS is inoperative. Vessel is not authorized to discharge untreated ballast into the waters of the U.S. without prior written authorization from the local Captain of the Port under the provisions of 33 CFR 151.2040 (b).
33CFR 151.2035
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.