Records from 1990 to 2023. Most recent: inspection, 15 June 2023.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 35
15 June 2023
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7716062
24 July 2020
Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7013150
30 October 2019
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6844969
28 August 2018
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6525437
18 July 2018
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6483489
2 November 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6299885
20 October 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6291746
6 September 2016
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5996723
23 June 2016
Examination of Repairs · Deficiency Check · Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5917048
23 September 2011
Examination of Repairs · Internal Structural Exam · Deficiency Check · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4152683
10 July 2008
Internal Structural Exam · Examination of Repairs · Re-Inspection · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3268085
21 September 2006
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2782169
20 April 2005
COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2337442
26 May 2004
Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2078645
6 May 2003
Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1787485
24 April 2002
Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1607511
16 February 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1406859
6 April 2000
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1453741
15 April 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1395164
9 April 1999
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1122286
26 March 1998
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1449033
10 March 1997
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1455450
16 July 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1089853
22 May 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1409499
25 April 1995
Type not recorded
No type recorded · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 674491
5 April 1995
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367347
3 November 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1175419
27 September 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1152669
8 March 1993
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1147293
4 February 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 943967
8 November 1991
Re-Inspection · Inclining Experiment
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1262296
1 March 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 925883
18 December 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 902506
11 December 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1231697
28 August 1990
Initial Certification · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1229458
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 30 October 2019
Resolved
Vessel placard for crane operator hand signals communication was faded and not visible or readable. Vessel must replace the placard so all symbols are visible.
46CFR107.259
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 October 2019
Resolved 30 October 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 30 October 2019
Resolved
Vessel failed to complete annual inspection within allotted timeframe.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 30 October 2019
Resolved 30 October 2019
Resolution: Vessel completed annual inspection.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 August 2018
Resolved
Fire Extinguisher was not properly serviced and maintenanced
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2018
Resolved 30 August 2018
Resolution: All fire ext's serviced by 3rd party and Stbd main deck ext was replaced with new.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 August 2018
Resolved
Vessel crew was not familiar with fire drill procedures
Action required: 10 - Deficiency Rectified
Due 28 September 2018
Resolved 28 August 2018
Resolution: Crew completed drill to the satisfaction of the CG.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 2 November 2017
Resolved
Generator cable found severly damaged. Repair or replace to satisfaction of CGMI prior to operating commercially.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 November 2017
Resolution: Feeder cable replaced.
Engineering › Diesel Engine (auxiliary) › Silencer (exhaust)
Issued 2 November 2017
Resolved
Generator found with modified exhaust. Exhause piping not properly supported or insulated. Remove modified exhaust piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 November 2017
Resolution: Exhaust modification removed.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 2 November 2017
Resolved
Vessel had not conducted tests and inspections of crane IAW API RP 2D. DEF to remain open until next annual to confirm vessel conducts and logs all pre-use and annual checks.
Action required: 705 - Other - as specified
Resolved 28 August 2018
Resolution: Vessel is conducting crane operational checks.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 2 November 2017
Resolved
Vessel had not conducted a 5 year rated load test of crane within the 60 month allotted time. Complete test in presence of CGMI.
Action required: 705 - Other - as specified
Resolved 30 November 2017
Resolution: 60 Month rated load test completed and witnessed by Coast Guard Inspector.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 November 2017
Resolved
Vessel did not complete an inspection within the required timeframes.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 November 2017
Resolution: Vessel completed a satisfactory inspection.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 20 October 2017
Resolved
Vessel is required to conduct an annual inspection within 90 days prior, or 90 days after its anniversary date. Vessel has an anniversary date of 23 June. Vessel did not schedule an annual inspection until 20OCT2017. Vessel must conduct a satisfactory inspection prior to operating commercially.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 28 August 2018
Resolution: Vessel was scheduled and completed within inspection window
Communications › Radio Communications › EPIRB
Issued 6 September 2016
Resolved
EPIRB removed from vessel to replace expired battery. Provide onboard an EPIRB in accordance with 46 CFR 180.64.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 September 2016
Resolved 6 September 2016
Resolution: EPIRB returned to vessel, tested, and properly installed.
Fire Fighting › Means of Escape › Blocked
Issued 6 September 2016
Resolved
Engine room aft emergency escape does not open from engine room side. Make engine room aft emergency escape operable from both sides. 46 CFR 177.15-1
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Moved securing device so handle accessible from engine room side.
Documentation › Markings/Placards › Warning Signs
Issued 6 September 2016
Resolved
Mark emergency escape routes and exits in accordance with 46 CFR 185.30-15.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Marked routes and exits.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 September 2016
Resolved
Install guards around rotating machinery and insulation around jacket water piping leading from generator to keel cooler per 46 CFR 183.01-15 (old T).
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Guards installed over MDE shafts and PTOs. Lagging installed on jacket water pipes leading from generator to keel cooler.
Electrical › Electric Supply System (service) › Cable
Issued 6 September 2016
Resolved
Properly terminate dead end wire in vicinity of generator per 46 CFR 183.01-15 (old T).
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Cable terminated in junction box.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 6 September 2016
Resolved
Center independent fuel tank was repaired and put in service without testing in accordance with 46 CFR 182.20-25. Conduct test per 46 CFR 182.20-25 to prove repairs to tank can withstand pressure of 5 psi or 1 1/2 times maximum service head, whichever is greater (standpipe of 11 1/2 feet and water may be used to meet 5 psi test).
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Conducted satisfactory air test in accordance with ABS Steel Vessel Rules, Part 3, 3-7-1/5.5.
Electrical › Electric Supply System (service) › Battery Installation
Issued 6 September 2016
Resolved
Install cover for generator battery box per 46 CFR 183.05-20.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Installed battery box cover.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 23 June 2016
Resolved
Vessel was not available for required dry dock examination and internal structural examinations as required by vessel's COI. Conduct satisfactory dry dock and internal structurural examinations.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2016
Resolved 7 September 2016
Resolution: Completed credit hull/ISE exam 07Sep2016.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 23 September 2011
Resolved
Port outboard bulkhead in equipment room is severely wasted and has several doubler plates covering the rust holes
Due 26 October 2011
Resolved 17 October 2011
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 September 2011
Resolved
Stbd nav light is covered in paint over spray and needs to be cleaned or replaced.
Due 26 October 2011
Resolved 26 September 2011
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 23 September 2011
Resolved
Keel cooler for port engine has pin hole leak in it 3' fwd of the engine.
Due 26 October 2011
Resolved 17 October 2011
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 23 September 2011
Resolved
4 PFD's have inoperable lights.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 September 2011
Electrical › Electrical Distribution System (service) › Panelboard
Issued 23 September 2011
Resolved
Breaker panel in equipment room is missing 2 breaker blanks
Due 26 October 2011
Resolved 26 September 2011
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 23 September 2011
Resolved
Emergency escape hatch needs a handle installed so one person may safely open it without the aid of a ladder or chair
Due 26 October 2011
Resolved 26 September 2011
Communications › Alarms/Indicators › Bilge Alarm
Issued 23 September 2011
Resolved
Bilge alarms not working
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 September 2011
Fire Fighting › Means of Escape › Emergency Lighting
Issued 23 September 2011
Resolved
Emergency lights not working
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 September 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 July 2008
Resolved
Fire pump was improperly wired into subpanel. Cover was loosened and wire run behind cover without any knockout/connector and cover acted as guillotine when closed.
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 18 July 2008
Resolution: Wire was run through a knockout connector and cover can now close properly.
Lifesaving › Launching Appliances › Lines
Issued 10 July 2008
Resolved
Emergency man rope was cut to deck level, needs to reach water line when elevated.
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 18 July 2008
Resolution: Man rope was replaced with new line, splice into a thimble and knotted every 12 inches.
Fire Fighting › Means of Escape › Blocked
Issued 10 July 2008
Resolved
Dogs need to be removed from hatch over galley area. Space also acts as a berthing area and hatch is the only alternate escape other than door over engine room.
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 18 July 2008
Resolution: Dogs removed, demonstrated that hatch can easily be opened from inside the space.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 10 July 2008
Resolved
Hydraulic pressure alarm for lifting system not visible at control station.
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 18 July 2008
Resolution: An audible/visual alarm was added to the system and mounted next to the control station for low pressure in hydraulic system.
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 10 July 2008
Resolved
Vessel is a lift boat and needed an anemometer to accurately determine wind speed in order to comply with ops manual.
Action required: 705 - Other - as specified
Due 18 July 2008
Resolved 18 July 2008
Resolution: A hand held anemometer was locally procured and placed in the pilot house. Proper function was tested.
Documentation
Issued 22 May 1996
Resolved
PROVE ESTABLISHMENT OF CHEMICAL TESTNG PROGRAM PER 46 CFR PART 16.
Condition: Unknown
Due 22 May 1996
Resolved 22 May 1996
Documentation
Issued 28 August 1990
Resolved
SUBMIT AN OPERATING MANUAL FOR REVIEW AND APPROVAL BY THE U.S. COAST GUARD MARINE SAFETY CENTER, WASHINGTON, D.C., VESSEL IS PERMITTED TO OPERATE ON ITS EXISTING OPERATING MANUAL UNTIL THE U.S. COAST GUARD APPROVED MANUAL ISRECEIVED.
Condition: Unknown
Due 28 August 1990
Resolved 28 August 1990
Documentation
Issued 28 August 1990
Resolved
PROVIDE APPROVED PLANS AS REQUIRED BY ITEM 1 TO THE COGNIZANT OCMI.
Condition: Unknown
Due 28 August 1990
Resolved 28 August 1990
Documentation
Issued 28 August 1990
Resolved
SUBMIT THE FOLLOWING PLANS FOR REVIEW AND APPROVAL BY THE U.S. COAST GUARD MARINE SAFETY CENTER, WASHINGTON, D.C.: INBOARD AND OUTBOARD PROFILES, LEG STRUCTURAL SUPPORT AND LEG STRENGTH CRITERIA, HYDRAULIC JACKING SYSTEM DETAILS INCLUDING ALARMS AND CONTROLS.
Condition: Unknown
Due 28 August 1990
Resolved 28 August 1990
Documentation
Issued 28 August 1990
Resolved
SUBMIT STABILITY CALCULATION TO THE U.S. COAST GUARD MARINE SAFETY CENTER, WASHINGTON, D.C. FOR REVIEW AND APPROVAL.
Condition: Unknown
Due 28 August 1990
Resolved 28 August 1990
Navigation
Issued 28 August 1990
Resolved
CALIBRATE MAGNETIC COMPASS AND SUBMIT DEVIATION TABLE TO [name withheld].
Condition: Unknown
Due 28 August 1990
Resolved 28 August 1990