Records from 2019 to 2026. Most recent: inspection, 8 July 2026.
Inspection history · 9
8 July 2026
COC-GAS Renew · PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8420677
11 June 2024
COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7931004
10 February 2023
COC-GAS Renew · Administrative Inspection · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7635030
7 April 2022
PSC B · COC-GAS Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7421340
16 February 2021
COC-GAS Renew · PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7135201
3 February 2020
PSC B · COC-GAS Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6901430
10 December 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6871059
12 February 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6624350
23 January 2019
Deficiency Check · ISPS II Exam · Ballast Water Examination · COC-GAS Renew · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6612859
01 - Certificates & Documentation › 012 - Crew Certificates › Endorsement by flagstate
Issued 8 July 2026
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 10 - Deficiency Rectified
Due 8 July 2026
Resolved 8 July 2026
Resolution: Master provided flag endorsement applications for 3 missing members.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 12 June 2024
Resolved
Gas carriers carrying cargoes emitting toxic vapours or gases* shall carry lifeboats with a self-contained air support system complying with the requirements of section 4.8 of the Code. A lifeboat with a self-contained air support system shall be so arranged that the air in the lifeboat remains safe and breathable and the engine runs normally for a period of notless than 10 min and pressure of atmosphere inside shall not exceed outside atmosphere pressure by 20 hPa.
Solas74(2014) III/31.1.6, LSA Code CH IV, 4.8
PSCO's observed air supply hose to be bleeding air directly into lifeboat.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2024
Resolution: Hose that was producing air leak was changed out with suitable high pressure hose and observed under pressure by attending surveyor and found satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 3 February 2020
Resolved
Gas carriers carrying cargoes emitting toxic vapours or gases equipped with self-contained air support systems shall remain safe and breathable and runs for a period of not less than 10 mins. Self-contained air support system was leaking air and dropping steady pressure.
Action required: 10 - Deficiency Rectified
Due 3 February 2020
Resolved 3 February 2020
Resolution: Crew replaced charging valve on the lifeboat air cylinders that was leaking air.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 3 February 2020
Resolved
Ships shall carry one or more totally enclosed lifeboats complying with 4.6 of the code. Each lifeboat shall be arranged that access to the lifeboat is provided with hatches which can be closed to make the lifeboat watertight. Hatchway gasket material was found unsealed and falling off the hatch entrance.
Action required: 10 - Deficiency Rectified
Due 3 February 2020
Resolved 3 February 2020
Resolution: Crew repaired the effected gasket with an adhesive prior to exam completion.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 24 January 2019
Resolved
Gas detection equipment should be so designed that it may readily be tested. Testing and calibration should be carried out at regular intervals.
Fixed gas calibration certificate provided to PSCOs was from construction yard, dated 26OCT2016. During test of fixed gas detection system, 50% LEL propane used, PSCOs witnessed reading of 63%. In calibration mode, PSCOs witnessed reading of 166%.
93 IGC 13.6.6 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 January 2019
Resolution: Crew reviewed manufacturer's instruction manual, and was able to properly calibrate the fixed gas detection system in the presence of PSCOs. A function test was also witnessed from airlock sample point.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 January 2019
Resolved
Maintenance, testing and inspections shall be carried out based on the guidelines according to the Organization* in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. (MSC.1/Circ.1432) Annual inspections should be carried out to ensure that the indicated actions are taken for the specific equipment: (7.9) Fixed dry powder systems.
Vessel’s most recent annual inspection of fixed dry chemical firefighting system is dated 05DEC2017.
74 SOLAS (14)II-2/14.2.2.1 ref MSC.1/Circ.1432
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 January 2019
Resolution: Received Survitec annual servicing certificates for both port and starboard fixed dry powder systems.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 January 2019
Resolved
Airlock doors should be self-closing.
Interior and exterior airlock doors were not self-closing.
74 SOLAS (14)VII/13.1 93 IGC 3.6.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 January 2019
Resolution: Crew adjusted self-closing devices on the airlock doors, tested in the presence of PSCOs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 January 2019
Resolved
Emergency shutdown valves in liquid piping should fully close in all service conditions within 30 s of actuation.
Upon activation of the ESD, the port side manifold liquid line valves closed in 42 s.
74 SOLAS (14)VII/13.1 93 IGC 5.6.4
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 24 January 2019
Resolution: Crew adjusted liquid line valves, ESD tested in presence of PSCOs.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 January 2019
Resolved
The company should establish procedures to ensure the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. In meeting these requirements, the company should ensure that: (10.2.1) inspections are held at appropriate intervals; (10.2.3) appropriate corrective action is taken. The vessel is required to complete annual servicing of the fixed dry powder fire-fighting system, and appropriate periodic calibration and testing of the fixed gas detection systems. Vessels previous fixed dry powder fire-fighting system annual servicing certificate was dated 05DEC2017, and was not carried out during previous ports of call in Ain Sukhna Egypt; Rabigh, Saudi Arabia; Antwerp, Belgium; Stade, Germany; or Vlissingen, Netherlands. During examination, it was discovered that servicing was scheduled for Houston, TX. 1.5 months after annual certification expiry. In addition, crew was unable to find a valid copy of calibration of fixed gas detection system, calibration certificate (labeled LGE TA-001) was blank, and the Master could only provide original shipyard testing certificate (STX Onboard Test Procedure, pg 45) dated 26OCT2016. The crew then was unable to demonstrate satisfactory on-board calibration of the fixed gas detection system resulting in erroneous LEL readings, which provides objective evidence that the Company did not provide satisfactory training to the crew.
74 SOLAS(14)IX/3.1 ISM Part A/10.2
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2019
Resolved 12 February 2019
Resolution: Received satisfactory documentation from Company rectifying the deficiency.