Records from 2018 to 2026. Most recent: inspection, 11 June 2026.
Inspection history · 32
11 June 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8401496
28 April 2026
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8357507
1 April 2026
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8340314
12 March 2026
Vessel Attendance · Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8325408
18 June 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8162427
31 March 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8099938
21 March 2024
Deficiency Check · COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7881024
13 September 2023
In-Service Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7791918
20 March 2023
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7656504
17 November 2022
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7595530
30 September 2022
In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7573078
22 March 2022
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7427525
2 February 2022
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7394137
12 October 2021
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7331094
1 October 2021
In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7324713
30 May 2021
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7210777
8 April 2021
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7170536
18 June 2020
In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6978656
27 May 2020
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6962169
28 February 2020
Annual Inspection · In-Service Inspection · Deficiency Check · Plan Review (Other than "T")
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6919083
14 October 2019
Security Breach
Type not classified · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6847261
26 September 2019
In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6821210
11 September 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6804169
23 June 2019
In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6724512
19 June 2019
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6721267
13 June 2019
Examination of Repairs
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6713907
21 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6679210
5 April 2019
Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6658200
22 March 2019
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6640378
4 March 2019
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6636109
1 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6608462
22 August 2018
MTSA Verification · DAPI Audit · Initial Certification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6519430
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 June 2025
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations.
Vessel reported overheating to the Port Azimuth Thruster due to a failed coolant pump while transiting the Lower Granite Locks. Vessel is to provide a technicians report and evidence of permanent repairs to the satisfaction of Marine Inspector.
Action required: 705 - Other - as specified
Due 25 June 2025
Resolved 24 June 2025
Resolution: Vessel crew replaced coolant pump in-kind. The vessel was attended by company port engineer and operationally tested which proved functionality with zero issues.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 April 2024
Resolved
A door in a main vertical zone bulkhead must be of the self-closing type capable of closing against a 3.5 degree list of the vessel. The starboard aft salon fire door on the 4th deck and the aft atrium fire doors on the second deck were incapable of self-closing with the vessel on an even keel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2024
Resolved 2 April 2024
Resolution: Operator provided video evidence of doors self-closing satisfactorily.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 April 2024
Resolved
A door in a fire control boundary must be capable of operation from either side by one person. The starboard aft atrium fire door on the 3rd deck was incapable of opening from the atrium side.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2024
Resolved 2 April 2024
Resolution: Operator provided video evidence of opening door from either side.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 2 April 2024
Resolved
Nontank vessels may not continue to operate on the navigable waters of the United States if the period of the vessel response plan [VRP] authorization has expired. Vessel's VRP expired in August 2023.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2024
Resolved 31 March 2025
Resolution: Def issued in error.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 2 April 2024
Resolved
Every vessel must have a detailed inspection of the radio installation by an FCC-licensed technician once every five years. Vessel's Safety Radio Telephony Certificate has expired. 47 CFR 80.903
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 May 2024
Resolved 31 March 2025
Resolution: Company has been notified of requiremnt to carry FCC certificates. Company has called out FCC Inspector to condcut exam. Company will follow up with office upon completion.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 September 2023
Resolved
07105- Construction and arrangement of the a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of inspection giving consideration to provision for protection against fire. Vessel was found with 02 fire doors leading into the main dining area with a latch key missing proper fastners to ensure operation and one key on the door adjacent to the dining hall missing. Repair to the satisfaction of the attending marine inspector.
46 CFR 116.100(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 15 November 2023
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 September 2023
Resolved
7105- Construction and arrangement of the a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of inspection giving consideration to provision for protection against fire. 2nd deck door to the skylounge was found with a seized latch and unable to close. Repair to the satisfaction of the attending marine inspector.
46 CFR 116.100(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 15 November 2023
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 September 2023
Resolved
07120- Means of Escape - Each level of a space containing a balcony must have two independent means of escape that meet the requirements of § 116.500 of this part. Vessel egress dividers on the stbd fwd 2nd deck were found with bolts permanently affixing them to vessel and inhibiting their ability to be removed for emergency egress. Vessel shall remove the bolts and the egress dividers to their original design.
46 CFR 116.439
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 15 November 2023
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 September 2023
Resolved
07103 - Division - Penetrations - Windows in doors in fire control boundaries must comply with the requirements of paragraphs (a) through (e) of this section. Glazing beads or angles of steel or equivalent material must be installed to hold glass in place in windows or air ports in a fire control boundary in event of a fire. Vessel had 05 window retention brackets missing on 2nd deck windows. Vessel is required to repair to the satisfaction of the attending marine inspector.
46 CFR 116.433
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 15 November 2023
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 13 September 2023
Resolved
07115- Fire Dampers - Suitable means, such as a manual damper, automatic damper, or vent cover, must be provided in an accessible location outside the space served by the ventilation duct for shutting off the passage of air through the ventilation duct in the event of fire. FWD STBD laundry room had fire damper with missing handle to manually close damper.
46 CFR 116.610 (d)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 15 November 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 September 2023
Resolved
09209 - Electrical- Electrical equipment on a vessel must be installed and maintained to: minimize accidental personnel contact with energized parts. Vessel had an open electrical junction box on the port overhead of the main engine room. Vessel is required to repair the junction box to the satisfaction of the attending marine inspector.
46 CFR 120.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2023
Resolved 15 November 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 September 2023
Resolved
11117 - Lifebuoys - Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Stern lifebuoy on the port side was found in unserviceable condition: tears in the body of the lifebuoy and deteriorated buoy line. Vessel is required to replace the lifebuoy and provide the attending marine inspector documentation.
46 CFR 115.808(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2023
Resolved 15 November 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 September 2023
Resolved
99101 - Other - All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high. Escape in the dining room markings were faded. Vessel is required the markings to the satisfaction of the attending marine inspector.
46 CFR 122.206
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2023
Resolved 15 November 2023
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 September 2023
Resolved
07199 - Other (Fire Safety) Electrical equipment on a vessel must be installed to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment. Vessel had an extension cord run as a permant installation through the overhead. Vessel removed extension cord from space.
46 CFR 120.200
Action required: 10 - Deficiency Rectified
Resolved 15 November 2023
07 - Fire Safety › N/A - No Subsystem › Fire patrol
Issued 13 September 2023
Resolved
07107 - Fire Patrol - Vessels described by 46 CFR 114.110(f) must submit plans to the cognizant OCMI, in accordance with 46 CFR 115.700, for the installation and use of monitoring device(s) to ensure the wakefulness of the watchmen required in paragraph (a) of this section. Vessel submitted plan states Each Lone Worker radio is programmed to emit 30 second audible warning alarm if the Security Watchstander does not manually key microphone every 15mins and a continual audible emergency alarm will sound on every shipboard handheld radio until the watchstander radio is manually keyed. Lone worker radio does not activate a continual audible emergency alarm on every shipboard handheld radio. Vessel is required to bring radios in compliance with approved watchman plan to the satisfaction of the attending marine inspector.
46 CFR 122.410
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2023
Resolved 15 November 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 March 2023
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Vessel did not have the proper donning instructions for the lifejackets present onboard. Replace or install the lifejacket donning instructions in each crew/passenger stateroom to type present to the satisfaction of attending marine inspector. 46 CFR 122.516
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2023
Resolved 14 April 2023
Resolution: Proper placards were installed on each passenger cabin door.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 1 October 2021
Resolved
EACH SURVIAL CRAFT AND LAUNCHING APPLIANCE ON A VESSEL MUST BE INSPECTED MONTHY USING THE MANUFACTURERS INSTRUCTIONS. VESSEL HAS NOT BEEN CONDUCTING MONTHY INSPECTIONS ON VESSELS SURVIVAL CRAFTS. VESSEL MUST PROVIDE DOCUMENTATION TO THE COAST GUARD THAT SURVIAL CRAFT MONTHLY INSPECTIONS ARE BEING CONDUCTED AND LOGGED.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 October 2021
Resolved 12 October 2021
Resolution: VSL rep supplied survival craft maintenance procedures, and log entries indicating monthly inspections being conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 June 2020
Resolved
The exhaust piping must be properly supported by noncombustible hangers or blocks. The support bracket on the starboard generator was found to be broken free from the block for the exhaust pipe. 46 CFR 119.430(b)
Condition: Design Flaw
Due 2 July 2020
Resolved 27 April 2021
Resolution: Exhause piping hanger has been redesigned to allow more movement avoiding cracking of the welds.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 June 2020
Resolved
A vessel must be operated in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported. The coolant hose from the head tank for the centerline generator was found to be leaking.
Due 2 July 2020
Resolved 27 April 2021
Resolution: Coolant hose has been replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 28 February 2020
Resolved
Vessel must make permanant repairs to the 3 fractures identified in the superstructure that have been drill stopped and sealed as a temporary repair.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 31 March 2021
Resolved 22 March 2022
Resolution: All weld repairs completed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 March 2019
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Two aft bulkhead penetrations in machinery space are not watertight. Remove plastic hose and make cable penetrations watertight. Plastic hose in question is a chaffing item installed by Caterpillar for the Tier IV engine system. To be completed by 05APR, in order to permit time for company to consult with manufacturer.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 April 2019
Resolved 5 April 2019
Resolution: Inspected bulkhead penetrations. Both had been properly repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 22 March 2019
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 150F, must be insulated where necessary to prevent injuries. Each SSDG in engine room has unprotected areas on the turbo charger, potentially exposing crew members to injury. Install proper insulation/lagging on exposed areas within two weeks.
Action required: 10 - Deficiency Rectified
Due 5 April 2019
Resolved 22 March 2019
Resolution: Proper insulation/lagging was installed. Deficiency rectified.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 March 2019
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Over 50% of all watertight penetrations are improperly installed IAW Coast Guard Approval 164.138/33/0 and exhibit unauthorized bundled cabling. Make watertight and correct improperly installed watertight penetrations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 3 May 2019
Resolution: Verified proper installation of all watertight penetrations.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 22 March 2019
Resolved
Fire dampers must fitted with an indicator showing whether the damper is open or closed, and be marked with red letters of at least 0.5 inches in height stating, “VENTILATION FIRE DAMPER”. All fire dampers with the exception of 03 dampers protecting the galley space, are not properly marked or fitted with indicators.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 5 April 2019
Resolution: The dampers have been labeled with open and close direction arrows.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 22 March 2019
Resolved
A fire damper must close against the draft in the duct and be accessible for periodic inspection by means of a hinged or bolted plate in the duct and surrounding bulkhead or deck, if fitted. All internal fire dampers on board are not accessible for visual inspection.
Action required: 705 - Other - as specified
Due 20 June 2019
Resolved 19 June 2019
Resolution: Received photos from the operator showing completed access ports in the ventilation ducting.
04 - Emergency Systems › N/A - No Subsystem › Shipboard Marine Pollution emergency operations
Issued 22 March 2019
Resolved
A vessel with the accumulative oil capacity of 250 Barrels (10,500 Gallons) or more must have transfer procedures as required by 33 CFR 155.720 through 155.760; Persons in Charge as per 33 CFR 155.700 who are designated in writing as per 33 CFR 155.715, who meet the requirements of 33 CFR 155.710. The vessel must also meet all other applicable operational and administration items as identified in 33 CFR 155 and 33 CFR 156.115 through 156.170.
Provide transfer procedures, line diagrams, PIC designations and proof of training and prove compliance with all applicable sections of 33 CFR 155 and 33 CFR 156 to the attending Marine Inspector prior to carrying out fuel transfer operations.
Action required: 705 - Other - as specified
Resolved 2 April 2019
Resolution: Received electronic versions of updated fuel transfer procedures and line diagram, sat. Documents uploaded to MISLE Activity.