MAURY USCG vessel records Sign in
← All vessels

APL DANUBE

APL DANUBE is a 2014 freight ship. The Coast Guard has recorded 28 inspections since 2017, most recently in December 2025, along with 4 deficiencies and 2 operational controls.

Records from 2017 to 2025. Most recent: inspection, 30 December 2025.

Built
2014
Last inspected
30 December 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9674517 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9HA3553
1438151
Flag
MALTA
—
Maury page id
psix-1438151

Inspections, by type

…with no type recorded3
Years with a record 7 calendar years (2017–2025)
The 28 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it112580 - Dead Weight, Ton
95263 - Displacement, Ton
96253 - Convention (Subpart B), Gross Ton
37602 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 28

30 December 2025 In-Service Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8287119
30 December 2025 Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8288412
24 December 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8287125
5 October 2025 In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8246586
5 January 2025 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8057589
19 March 2024 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7881845
23 December 2023 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7841992
28 June 2023 In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7725503
18 June 2023 Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7717370
6 April 2023 PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7663419
28 March 2023 Ballast Water Examination · Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7655048
28 March 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7658961
24 March 2023 In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7656529
22 March 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7655214
23 December 2022 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7612588
23 December 2022 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7613412
28 April 2022 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7435440
27 October 2021 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7337057
13 August 2021 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7285852
29 July 2021 Administrative Inspection · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7271406
4 May 2021 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7189102
4 May 2021 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7190688
29 April 2021 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7185857
28 April 2021 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7184531
21 November 2018 Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6584961
17 September 2018 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6542089
26 July 2018 Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6491272
30 May 2017 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6160603

Deficiency record · 4

14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 28 March 2023 Resolved
Following installation, the master, owner, operator, agent, or person in charge of a vessel subject to this subpart, must properly maintain the BMWS in accordance with all manufacturer specifications. Vessel reported BWMS inoperable. 33CFR151.2025(a)(1)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 18 June 2023
Resolution: Received class report attesting deficiency being rectified.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 March 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea with out danger to the ship or persons on board. On 24MAR2023 vessel was involved in a collision with a barge. Vessel required to submit a class survey report attesting to extent of hull damage in vicinity of STBD quarter and its affect on vessel seaworthiness.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2023
Resolution: HOUSTON PSC received class survey outlining minor damage sustained from collision
05 - Radio Communications › N/A - No Subsystem › INMARSAT ship earth station
Issued 4 May 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure that the ship in all respects will remain fit to proceed to sea with out danger to the ship or persons on board. PSCO attended the vessel after receiving a report of an allision with the Crescent City bridge. PSCO observed damage to both INMARSAT C antennas, mast light and damage to the mast riser. 74 SOLAS (2020) I/11.a
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 May 2021
Resolution: Accepted class report from BV attesting to satisfactory repairs and testing of INMARSAT C system and nav light on damage mast.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 4 May 2021 Resolved
The company and the ship shall comply with the requirements of the IMS Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory. the company should establish procedures plans and instructions including checklist as appropriate, for key shipboard operations concerning the safety of the personnel. SMS states to use card Bridge-060-passage plan procedure to complete passage plan. PSCO observed navigational charts were not used to conduct the plan procedure to complete passage plan, which was a major factor for the cause of the causality. Conduct internal audit and provide a corrective action plan within 90 days. 74 SOLAS (2020) IX/3.1 ISM 7
Action required: 705 - Other - as specified
Due 4 August 2021
Resolved 13 August 2021
Resolution: Received ISM audit report.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.