Records from 2017 to 2026. Most recent: inspection, 29 May 2026.
Documentation record
Registered dimensions (L × B × D)381.7 ft × 96.0 ft × 28.0 ft
Registered tonnagegross 9,669 / net 9,669
ITC dimensions (L × B × D)381.7 ft × 96.0 ft × 28.0 ft
ITC tonnagegross 8,522 / net 5,304
BuilderGUNDERSON MARINE LLC · PORTLAND, OR, UNITED STATES · built 2018
Hull materialSteel
PropulsionNone
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portVALDEZ, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 18 April 2026 · expires 31 May 2027
Service, as the file records itOil Recovery
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8522 - Convention (Subpart B), Gross Ton
9669 - Regulatory (Subpart C or D), Gross Ton
5304 - Convention (Subpart B), Net Ton
9669 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 29
29 May 2026
Periodic Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8383585
26 March 2026
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8369533
6 March 2026
Drydock Exam · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8316684
2 February 2026
Administrative Inspection
Administrative · USCG Arctic District (dp) · USCG Arctic District (CGD-A) · Activity 8305089
31 March 2025
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8102792
2 January 2025
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8056873
11 March 2024
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7877534
11 December 2023
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7837794
18 May 2023
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7691781
4 April 2023
Underwater Inspection in lieu of Drydock
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7663477
24 March 2023
Internal Structural Exam · COI Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7656591
2 June 2022
In-Service Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7467516
4 May 2022
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7444189
17 February 2022
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7398201
15 November 2021
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7352809
8 April 2021
Annual Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7171946
18 March 2021
Construction Oversight
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7158947
10 March 2021
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7155291
9 March 2021
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7153920
17 December 2020
Construction Oversight
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7120632
24 September 2020
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7131319
16 July 2020
Annual Survey
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7019596
16 May 2019
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6704659
17 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6838842
12 April 2019
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6669827
27 September 2018
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6549740
11 September 2018
Examination of Repairs
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6538885
12 August 2018
Construction Oversight
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6651294
27 October 2017
Initial Certification · Construction Oversight
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6344355
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2024
Resolved
There is a check valve and a stop valve before the air receivers. Make compressed air piping as per the approved plans.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2024
Resolved 10 April 2024
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 5 April 2023
Resolved
Sub-Chapter S requires every vessel to have a stability letter. The vessel has been found to be operating outside the parameters of their stability letter. Vessel shall remove ballast or have a new stability letter issued. 46CFR31.10-3
46CFR170.120
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 11 December 2023
Resolution: ABS updated the stability book.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 24 March 2023
Resolved
Where the general emergency alarm signal cannot be heard over the background noise, there must be a red flashing light or rotating beacon, in addition to the general emergency alarm signal. Flashing light in way of workshop in the generator space did not flash.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2023
Resolved 4 April 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 4 May 2022
Resolved
The cargo handling equipment shall be maintained by the tank vessel's personnel in accordance with the regulations in this subchapter, including the following:
Cargo pump pressure gauge shall be tested at least once a year for accuracy. Gauge not tested annually. Test gauge.
46 CFR 35.35-70
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2022
Resolved 2 June 2022
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 4 May 2022
Resolved
Each hose assembly used for transferring oil or hazardous material must meet the following requirements:
The hose burst pressure and the pressure used for the test required by 33 CFR 156.170 must not be marked on the hose and must be recorded elsewhere at the facility as described in paragraph (f) of this section. Test pressure recorded on hose. Remove test pressure.
33 CFR 154.500(g)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2022
Resolved 17 May 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 16 July 2020
Resolved
Barge has a sea chest and sea valve in #2 void. After installation of a snow removal system, vessel should have meet the requirements of 46 CFR 56.50-55, but did not. Provide approved plans and followed by installation of a bilge pump prior to operation of the snow removal system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 11 December 2023
Resolution: ABS and MSC agreed that portable pumps will suffice.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 27 September 2018
Resolved
ZERO DRAFT: no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 13 December 2018
Resolution: AIS discrepancy corrected, AIS broadcasting all pertinent information.