Records from 2022 to 2026. Most recent: inspection, 7 May 2026.
Inspection history · 7
7 May 2026
PSC B · COC-CVE Quarterly
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8368156
27 March 2026
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8332971
9 November 2025
COC-CVE Annual · PSC A
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8260975
14 November 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8034771
10 November 2024
COC-CVE Initial · PSC A
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8031728
15 October 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8019268
1 February 2022
COC-CVE Initial Prep
Type not classified · Activities Europe · Activity 7388725
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 7 May 2026
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers/crew to identify the routes of escape and readily identify escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. PSCO observed low location lighting blocked in the hospital by furniture wheel chairs.
74SOLAS(20) II-2/13.3.2.5.1
Action required: 15 - Rectify deficiencies by next port
Due 11 May 2026
Resolved 7 May 2026
Resolution: Observed rectification prior to PSCO departing vessel.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 7 May 2026
Resolved
Fire doors in main vertical zone bulkheads, galley boundaries, and stairway enclosures shall be self-closing and be capable of closing with an angle of indication of up to 3.5 degrees opposing closure. PSCO observed FSD04 241J not able to properly close and latch.
74SOLAS(20) II-2/9.4.1.1.5.1
Action required: 15 - Rectify deficiencies by next port
Due 11 May 2026
Resolved 7 May 2026
Resolution: Observed rectification prior to PSCO departing vessel.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 7 May 2026
Resolved
Where the contents and use of a space are such that there is a doubt as to its classification for the purpose of this regulation, or where it is possible to assign two or more classifications to a space, it shall be treated as a space within the relevant category having the most stringent boundary requirements. PSCO observed stowage of combustibles in steering gear rooms, both port and starboard, a category 10 space.
74SOLAS(20) II-2/9.2.2.3.2.2
Action required: 15 - Rectify deficiencies by next port
Due 11 May 2026
Resolved 7 May 2026
Resolution: Observed rectification prior to PSCO departing vessel.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 7 May 2026
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300 mm above the deck at all points of the escape route, including angles and intersections. The marking must enable passengers/crew to identify the routes of escape and readily identify escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. PSCO observed no low location lighting in corridor 6236D and 6236G - both category 3 spaces.
74SOLAS(20) II-2/13.2.5.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2026
Resolved 22 May 2026
Resolution: Class provided proof of the space being duel category space of 3 and 4 not requiring LLL.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 November 2025
Resolved
Means of escape from control stations, accomodation spaces and service spaces. PSCO's observed muster tablet stations being stored in crew stairwells.
74 SOLAS 20 II-2/13
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 November 2025
Resolved 22 November 2025
Resolution: Recieved class report from LR attesting to satisfaction of escape routes being unnafected by tablet storage stations.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 November 2025
Resolved
Openings in bulkheads and decks in passenger ships. PSCO's observed FSD 04 268 M, FSD 072 G, FSD 07 337 A and FSD 04 070 J did not latch and close properly; not maintaining their intended boundary.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 9 November 2025
Resolution: Doors adjusted while team on board. Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 November 2024
Resolved
Escape doors from public spaces that are normally latched shall be fitted with means of quick release. Such means shall consist of a door-latching mechanism incorporating a device that releases the latch upon the application of a force in the direction of escape flow. Door located next to FSD 06 227M was missing the crash bar, limiting the functionality of escape. 74 SOLAS 20 II-2/13.3.2.6.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2024
Resolved 10 November 2024
Resolution: Resolved. New crash bar has been installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 November 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed a valve leak on the dry system in the paint locker through the first high pressure mist nozzle with a bucket hanging over the nozzle for leaking containment. 74 SOLAS 20 I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 December 2024
Resolved 14 November 2024
Resolution: Resolved. New section valve was installed.