← All vessels
DARYA JAYA
DARYA JAYA is a 2017 freight ship. The Coast Guard has recorded 6 inspections since 2018, most recently in June 2026, along with 2 deficiencies.
Records from 2018 to 2026. Most recent: inspection, 25 June 2026.
- Built
- 2017
- Last inspected
- 25 June 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9752412 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
VRPV6
1450814
Flag
HONG KONG
—
Maury page id
psix-1450814
Inspections, by type
The 6 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it36272 - Convention (Subpart B), Gross Ton
63584 - Dead Weight, Metric Ton
75197 - Displacement, Metric Ton
21607 - Convention (Subpart B), Net Ton
63584 - Dead Weight, Metric Ton
75197 - Displacement, Metric Ton
21607 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
25 June 2026
PSC B
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8413504
6 February 2020
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6899559
27 November 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6847221
12 February 2019
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6624491
19 July 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6476803
19 July 2018
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6484691
Deficiency record · 2
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 July 2018
Resolved
13101 (Propulsion and Auxillary machinery) After any survey of the ship under regulations 7,8,9,or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items without the sanction of the of the Administration. PSCO Observed a F/O leak on the fuel pump of the No. 2 cylinder of the main engine which had been plugged with silicone putty while waiting for the shipyard to provide a technician to repair the leak. Provide clarification from Class on whether the temporary fix is adequate until the technician can serivce the vessel.
SOLAS 74(a) 2014 cons I/II(b) 17a
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 July 2018
Resolved
13101 - (Propulsion and Aux machinery) - After any survey of the ship under regulations 7,8,9,or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment, and other items without the sanction of the Administratio. PSCO observed a F/O leak on the fuel pump of the No. 2 cylinder of the main engine which had been plugged with silicone putty while waiting for the shipyard to provide a technician to repair the leak. Provide clarification from Class on whether the temporary fix is adequate until the technician can service the vessel. SOLAS 74(a) 2014 cons. I/11(b) 17 a
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.