Records from 2000 to 2010. Most recent: inspection, 2 March 2010.
Inspection history · 17
2 March 2010
COI Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3685889
13 May 2009
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3472242
30 July 2008
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3285230
21 April 2008
Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3187204
11 April 2008
Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3180606
27 February 2007
Simplified Stability Test · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2866069
19 April 2006
Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 2630246
9 March 2005
COI Inspection · Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2306030
7 September 2004
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2189115
19 May 2004
Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 2085400
3 March 2004
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 2017598
15 January 2004
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1986051
12 November 2003
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1946182
13 March 2003
Re-Inspection · Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1756466
2 August 2001
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1070994
13 June 2001
Re-Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1448302
17 March 2000
Hull Examination · COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1466665
Construction/Loadline › Structures › Transverse Bulkhead
Issued 2 March 2010
Resolved
Make engine room fume tight, seal forward penetrations.
Action required: 705 - Other - as specified
Due 9 March 2010
Resolved 3 March 2010
Resolution: Made engine room air tight
Lifesaving › Lifebuoys › Stowage
Issued 2 March 2010
Resolved
Replace corrosion resistant clip on ring life buoy with quick release type.
Action required: 705 - Other - as specified
Due 9 March 2010
Resolved 3 March 2010
Resolution: Replaced old clip with quick release type clip.
Construction/Loadline › Hull › Bottom Plating
Issued 13 May 2009
Resolved
Crop and renew bottom plate in steering compartment where cracked and leaking.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 May 2009
Resolved 22 June 2009
Resolution: Satisfactorily inserted bottom plate.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 May 2009
Resolved
Gouge and reweld cracks in aft engine room bulkhead in way of generator supports.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 27 May 2009
Resolved 22 June 2009
Resolution: Cracks welded.
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 May 2009
Resolved
Conduct man overboard and fire fighting drills.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 May 2009
Resolved 22 June 2009
Resolution: Credit given for previous drills.
Electrical › Electric Generation Source (service) › Generator
Issued 27 February 2007
Resolved
Remove and clean generator windings in engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 March 2007
Resolved 19 March 2007
Engineering › Bilge Water Management System › Pump
Issued 27 February 2007
Resolved
Replace bilge foot pickup in lazerette.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 March 2007
Resolved 19 March 2007
Electrical › Electric Supply System (service) › Battery Installation
Issued 27 February 2007
Resolved
Secure generator battery in engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 March 2007
Resolved 19 March 2007
Electrical › Electric Supply System (service) › Cable
Issued 27 February 2007
Resolved
Reattached electrical wiring to overhead in battery room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 March 2007
Resolved 19 March 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 27 February 2007
Resolved
Install guard or replace lighting fixture in battery space IAW 46 CFR 183.410.
Action required: 705 - Other - as specified
Due 27 March 2007
Resolved 19 March 2007
Electrical › Electrical Distribution System (service) › Switchboard
Issued 9 March 2005
Resolved
Prove proper operation of AC amp gauge.
Due 9 April 2005
Resolved 22 March 2005
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 9 March 2005
Resolved
Provide screen for fuel vent.
Due 9 April 2005
Resolved 22 March 2005
Engineering › Fuel Oil Service System › Tank
Issued 9 March 2005
Resolved
Gouge and weld crack of fuel tank top.
Due 9 April 2005
Resolved 22 March 2005
Lifesaving › Hand Flares › Not on Board
Issued 19 May 2004
Resolved
Missing three orange smoke signals.
Condition: Unknown
Due 19 May 2004
Resolved 19 May 2004
Construction/Loadline › Hull
Issued 8 April 2003
Resolved
Repair two cracks in port strut supports in rudder compartment. LEGACY COMPONENT DESC: Strut/Cross Tie
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2003
Construction/Loadline › Hull
Issued 8 April 2003
Resolved
Repair crack on starboard side shell in rudder room. LEGACY COMPONENT DESC: Hull Plating
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2003
Construction/Loadline › Hull
Issued 8 April 2003
Resolved
Remove identified backing strips for inspection of full penetration welds possible removal of all backing strips and possible refit of insert. inspection continues. LEGACY COMPONENT DESC: Side Shell
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 April 2003
Resolution: Additional 835 issued that clarifies this deficiency and cancels this version.
Construction/Loadline › Structures
Issued 8 April 2003
Resolved
Install insert port fwd enginer room bulkhead to include doubler, vertical crack in bulkhead and hole in bulkhead. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2003
Construction/Loadline › Structures
Issued 8 April 2003
Resolved
Reweld washed out crack (weld) in ventalation stack stbd side. LEGACY COMPONENT DESC: Ventilators
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2003
Navigation › Piloting/Steering
Issued 13 March 2003
Resolved
Provide updated copies of the follwoing nautical publications: Coast Pilot [name withheld] list, Tide Tables, Tidal current Tables.
Due 13 April 2003
Resolved 28 August 2003
Engineering › Bilge Water Management System
Issued 13 March 2003
Resolved
Reinstall bilge strainer in rudder compartment. LEGACY COMPONENT DESC: Strainer
Due 13 April 2003
Resolved 28 August 2003
Construction/Loadline › Hull
Issued 13 March 2003
Resolved
Repair cracked welds at deck on transom in rudder compartment. LEGACY COMPONENT DESC: Weld
Due 13 April 2003
Resolved 30 April 2003
Construction/Loadline › Hull
Issued 13 March 2003
Resolved
Renew 4 stringers in overhead in rudder room. LEGACY COMPONENT DESC: Stringer
Due 13 April 2003
Resolved 30 April 2003
Construction/Loadline › Structures
Issued 13 March 2003
Resolved
install insert in aft bulkhead port side where doubler and cracks are located. no doubler plate. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 13 April 2003
Resolved 30 April 2003
Construction/Loadline › Structures
Issued 13 March 2003
Resolved
repair cracks around ventalation/stacks at deck. and below deck. LEGACY COMPONENT DESC: Ventilators
Due 13 April 2003
Resolved 30 April 2003
Construction/Loadline › Structures
Issued 13 March 2003
Resolved
renew rub rails for tires that are worn through.
Due 13 April 2003
Resolved 28 August 2003
Construction/Loadline › Structures
Issued 13 March 2003
Resolved
reweld ventilation pipe in rudder compartment LEGACY COMPONENT DESC: Ventilators
Due 13 April 2003
Resolved 30 April 2003
Fire Fighting › Miscellaneous Items
Issued 13 March 2003
Resolved
prove proper operation of smoke detector.
Due 13 April 2003
Resolved 28 August 2003
Engineering › Fuel Oil Service System
Issued 13 March 2003
Resolved
Renew fuel piping to 46 CFR 182.455 or provide documentation stating it complies with SAE J-1942 and J-1475 (fittings) LEGACY COMPONENT DESC: Hose
Due 13 April 2003
Resolved 30 April 2003
Fire Fighting
Issued 13 June 2001
Resolved
Provide closures for forward ventilation trunks to engine room. (one each port and starboard side of pilot house)
Condition: Unknown
Due 13 June 2001
Resolved 13 June 2001
Electrical
Issued 13 June 2001
Resolved
Provide drip cover for electrical breaker box center on ER forward bulkhead(below deck hatch openings.)
Condition: Unknown
Due 13 June 2001
Resolved 13 June 2001
Lifesaving
Issued 17 March 2000
Resolved
PROVIDE & INSTALL REQUIRED 100 FT PAINTER & WEAK LINK IAW 46 CFR 180.175 & 46 CFR 180.137.
Condition: Unknown
Due 24 March 2000
Resolved 22 March 2000