Registered dimensions (L × B × D)118.7 ft × 34.0 ft × 14.6 ft
Registered tonnagegross 198 / net 134
ITC dimensions (L × B × D)120.2 ft × 34.0 ft × 16.0 ft
ITC tonnagegross 424 / net 127
BuilderMCDERMOTT SHIPYARDS · PORT OF NEW IBERIA, LA, UNITED STATES · built 1976
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portKETCHIKAN, AK
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 15 October 2025 · expires 31 October 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it198 - Regulatory (Subpart C or D), Gross Ton 424 - Convention (Subpart B), Gross Ton 134 - Regulatory (Subpart C or D), Net Ton 127 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 33 inspections, each with its date, unit and type; 10 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 3 other vessels inspected with it; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 27 September 2023Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, other openings into such spaces. Ventilation dampers did not fully secure and required hand tools to operate. Repair dampers to operational condition.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 21 March 2024
Resolution: Ventilation dampers were satisfactorily rebuilt.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 27 September 2023Resolved
Must carry portable fire extinguishers IAW table 142.230(b), and One 40–B extinguisher for each 1,000 brake horsepower of the main engines. Identified portable extinguishers in machinery space were not all 40-B. Install TWO more 40-B portable extinguishers in machinery space.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 21 March 2024
Resolution: Verified 2 additional extinguishers were installed in machinery space.
12 - Dangerous Goods › N/A - No Subsystem › Special requirement
Issued 27 September 2023Resolved
Paints, flammable, and combustible products must be stored in a designated storage cabinet when not in use. A 40–B portable fire extinguisher must be located near the storage room or cabinet.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 21 March 2024
Resolution: Verified satisfactory portable extinguisher installed by paint locker.
The Master must ensure all hatches, doors, and other openings designed to be watertight function properly. Watertight doors did not properly secure close and gaskets were found unsatisfactory. Repair gaskets and dogs on watertight doors.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 21 March 2024
Resolution: ABS completed load line survey 13FEB24 and verified satisfactory operation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 September 2023Resolved
At least two lifebuoys must be fitted with a floating electric water light. The water light must be attached by the lanyard with a corrosion-resistant clip to allow the water light to be quickly disconnected from the lifebuoy. The clip must have a strength of (50 pounds). Each lifebuoy with a floating electric water light must have a lanyard of at least (3-6 feet), securing the water light around the body of the lifebuoy. Install clips and attach lanyards to body of lifebuoys. Mark name of vessel in block capital letters.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2023
Resolved 21 March 2024
Resolution: Corrections to lifebuoys were installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 September 2023Resolved
Fixed fire-extinguishing systems must be approved by the Commandant (CG–ENG). Halon systems that are nolonger approved by Commandant will have to demonstrate that the system was approved at the time of installation. Provide P.E. approval drawing of the combination Halon CO2 system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2023
Resolved 21 March 2024
Resolution: Received Halon system documentation. Accepted system as existing equipment IAW 46CFR142.215(d).
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 3 February 2020Resolved
The purpose of a TSMS is to establish policies, procedures, and required documentation to ensure the owner or managing operator meets its established goals while ensuring continuous compliance with all regulatory requirements. The TSMS must contain a method to ensure all levels of the organization are working within the framework. An external vessel audit conducted on 08JAN20 identified 9 non conformities with the SMS as noted on ABS report 4080173. Conduct an audit of the company safety management system related to the non conformities identified in ABS report 4080173 including but not limited to the conduct of internal audits, the roles and responsibilities of the DPA and other management personnel, accident reporting procedures, management of change process and overall records management.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 March 2020
Resolved 17 June 2020
Resolution: Received final audit report from ABS attesting to correction of all non-conformities (see MISLE# 6917069, Management System Oversight activity originated by MSD Ketchikan).
The management must demonstrate that they implemented the policies and procedures as contained in the TSMS and the entire organization is adhering to their safety management program. The TSMS Maintenance Procedures identify the main propulsion, electrical power generating system, and fuel systems as critical systems and notes all found deficiencies in critical systems shall be resolved with priority and made safe by the vessel master or shore side support. If the deficiency cannot be resolved with priority, the Management of Change process shall be utilized which includes an inspection by the asset integrity team. As noted in deficiencies 2 and 3, there is an exhaust leak in the engine room and a hole in the engine room fuel day tank. The vessel master reported these items during nearly every Weekly Vessel Condition Report beginning in August 2018 as well as the monthly vessel safety and maintenance inspection report. There is no objective evidence proper action was taken by the company when the deficiency reports were received. Conduct an external audit of the vessel towing safety management system to include the TSMS Maintenance Procedures section. 46CFR 138.210(b).
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Due 20 December 2019
Resolved 8 January 2020
Resolution: External Audit conducted by TPO, findings identified. Exhaust system and fuel oil leak have been replaced/repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 20 November 2019Resolved
Machinery and electrical systems must be designed and maintained to provide for the safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. There is a significant exhaust leak in the machinery space. 6 CFR 143.205
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 20 December 2019
Resolved 8 January 2020
Resolution: Exhaust system and fuel oil leak have been replaced/repaired.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 20 November 2019Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid into the machinery space. There is an approximately 1 inch diameter hole in the fuel day tank allowing fuel and flammable vapors to leak into the machinery space. 46 CFR 143.220
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 20 December 2019
Resolved 8 January 2020
Resolution: Exhaust system and fuel oil leak have been replaced/repaired.
Recorded names · 1
SIDNEY FOSS (2004). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.