MAURY USCG vessel records
← All vessels

FRONT CASCADE

FRONT CASCADE is a 2017 tank ship. The Coast Guard has recorded 10 inspections since 2018, most recently in September 2025, along with 1 operational control.

Records from 2018 to 2025. Most recent: inspection, 19 September 2025.

Built
2017
Last inspected
19 September 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 19 September 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2018–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9769829
1458502
Flag
MARSHALL ISLANDS
Maury page id
psix-1458502

Documentation record

Tonnage as PSIX records it82515 - Convention (Subpart B), Gross Ton
157434 - Dead Weight, Metric Ton
184134 - Displacement, Metric Ton
52110 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 10

19 September 2025 PSC B · COC-TVE Annual
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8230882
13 September 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8233665
8 October 2024 Bulk Liquid Transfer Monitor
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8016210
11 September 2024 COC-TVE Renew · PSC B
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7995430
25 January 2024 COC-TVE Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7850321
19 November 2022 PSC B · COC-TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7597102
17 January 2021 PSC B · COC-TVE Renew
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7123852
30 December 2019 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6880766
21 February 2019 Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6619905
13 January 2018 COE-Offshore · ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6334912

Deficiency record · 0

No deficiencies recorded against this vessel. This means none were written in the records covered — it is not a statement about the vessel's condition. What a recorded resolution is.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.