Records from 2017 to 2026. Most recent: inspection, 15 July 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Professional
Detail on this page
14 inspections, each with its date, unit and type; 9 deficiencies with the resolution recorded against each; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Inspection history · 14
15 July 2026
Vessel Attendance · Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8437039
13 December 2024
Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8046608
19 June 2023
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7719369
29 May 2023
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7718959
16 May 2023
MARPOL Annex I Examination · Canadian Vsl Safety Exam (D9 only) · PSC B
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7689566
14 September 2022
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7558655
21 June 2021
PSC B
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7231376
20 May 2021
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7205024
2 January 2021
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7118614
19 June 2020
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6980908
4 December 2019
Canadian Vsl Safety Exam (D9 only)
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6867674
10 November 2019
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6852939
20 November 2018
Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6584498
13 November 2017
Canadian Vsl Safety Exam (D9 only)
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6305171
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 May 2023
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Two of the Class "A" doors leading into the fuel purifier room from the engine room, which is a Class "A" fire boundary, were found to be tied and held in the "open" position.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2023
Resolution: Vessel removed hold-back ties on the doors, allowing for the proper function.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Stowage incl. uprights, lashing, etc. (timber)
Issued 17 May 2023
Resolved
Whenever there is a hazardous condition either on board a vessel or caused by the vessel or its operation, the owner, agent, master, operator, or person in charge must immediately notify the nearest Coast Guard Sector Office. Containers were found on deck overflowing with old rollers from the vessel's conveyor belt system, as well as with scrap metal and other waste, with no means of containment to prevent the rollers and other scrap from becoming a safety hazard in rough seas or weather.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2023
Resolution: Vessel secured all loose scrap metal in bins and lashed to deck to properly secure.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 17 May 2023
Resolved
Closures for openings above the freeboard deck must be as strong as the structure to which they are attached and must be weathertight. A porthole on the starboard side leading into the accommodation space was found to have a hole cut in it with a hose for a portable AC unit duct taped to the outside.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2023
Resolution: Vessel was able to install the proper glass from original install, creating a weathertight seal.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 17 May 2023
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Multiple buckets of oily water and oil, as well as sorbent pads full of oil were found throughout the engine room.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 17 May 2023
Resolution: Vessel personnel cleaned engine room and removed all standing oil and sorbents pad throughout.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 17 May 2023
Resolved
The diamond, lines, and letters must be painted in white or yellow on a dark ground or in black on a light ground and permanently marked on the sides of the vessel. The load line was found to be deteriorated to the point where it no longer contrasted with the background.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2023
Resolved 29 May 2023
Resolution: Received Final Attendance Report from LR, as well as photos, showing load line marks repainted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 May 2023
Resolved
When alteration or repair of boilers, pressure vessels, machinery, safety valves or piping systems becomes necessary, the work shall be done under the cognizance of the Officer in Charge of Marine Inspection. It shall be done in accordance with the regulations in effect at the time such vessel or installation was contracted for or built (whichever is latest), or in accordance with the regulations in effect for new construction. An automated valve controlling the temperature on the cooling water system for the main propulsion system, as well as other auxiliary machinery in the engine room, was found to be sheared off, and the crew had rigged a manual lever and chain fall system to control the valve. No notification was made to Lloyd's Register or the Transport Canada.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2023
Resolved 19 June 2023
Resolution: Received report from LR stating that cooling valve had been repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 May 2023
Resolved
When alteration or repair of boilers, pressure vessels, machinery, safety valves or piping systems becomes necessary, the work shall be done under the cognizance of the Officer in Charge of Marine Inspection. It shall be done in accordance with the regulations in effect at the time such vessel or installation was contracted for or built (whichever is latest), or in accordance with the regulations in effect for new construction. A hose was found rigged on top of the main engine scrubber to drain excess water produced by the scrubber into a bucket. No notification was made to Lloyd's Register or to Transport Canada
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2023
Resolved 18 May 2023
Resolution: Vessel took hose out of bucket and put it back into the manufactured collection area.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 May 2023
Resolved
When alteration or repair of boilers, pressure vessels, machinery, safety valves or piping systems becomes necessary, the work shall be done under the cognizance of the Officer in Charge of Marine Inspection. It shall be done in accordance with the regulations in effect at the time such vessel or installation was contracted for or built (whichever is latest), or in accordance with the regulations in effect for new construction. A leak was found in the scavenger air system for the main propulsion system. No notification was made to Lloyd's Register or to Transport Canada.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2023
Resolved 18 May 2023
Resolution: Vessel installed washers in between air boxes and stopped the leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 May 2021
Resolved
Vessel reported loss of power, which resulted in loss of propulsion of the main engines while transiting near Gros Cap Reef Light in Lake Superior, Michigan. Vessel identified the cause was their fuel pump on their service generator. Conduct appropriate repairs prior to weighing anchor from Waiska Bay to the satisfaction of U.S. Coast Guard. (46 CFR 58.01-35)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2021
Resolution: Vessel had a spare fuel pump on board and changed out the faulty unit with the new one. Conducted satisfactory tests on all generators and engines.