Records from 2018 to 2026. Most recent: inspection, 15 July 2026.
Inspection history · 63
15 July 2026
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8421145
15 June 2026
Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8405054
15 June 2026
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8405834
26 March 2026
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8296175
9 February 2026
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8308498
23 January 2026
In-Service Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8301881
15 December 2025
Deficiency Check · COI Inspection · Vessel Attendance
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8274832
7 August 2025
Vessel Attendance · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8191801
5 May 2025
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8128944
10 April 2025
In-Service Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8110050
20 March 2025
COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8088590
21 January 2025
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8066825
21 November 2024
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8038509
13 September 2024
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 8017802
27 August 2024
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7991953
12 July 2024
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7958511
21 March 2024
COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7874322
22 December 2023
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7841765
7 December 2023
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7836626
21 November 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7830379
30 August 2023
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7802105
7 June 2023
MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7701672
24 April 2023
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7676657
21 April 2023
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7676301
29 March 2023
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7658264
6 March 2023
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7645966
9 January 2023
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7617517
7 September 2022
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7552764
22 August 2022
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7540903
8 June 2022
COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7471324
10 May 2022
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7447870
4 May 2022
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7443843
1 February 2022
Special
Type not classified · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7390554
20 November 2021
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7355512
11 November 2021
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7351359
11 November 2021
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7366058
2 November 2021
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7343445
14 October 2021
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7334776
4 October 2021
Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7328199
10 September 2021
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7314279
13 August 2021
Special · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7290425
9 July 2021
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7249677
16 June 2021
Special · Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7228401
9 April 2021
Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7175779
5 March 2021
Examination of Repairs · Special · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7163479
6 January 2021
Special · Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7121666
15 December 2020
Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7113344
3 November 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7089118
1 October 2020
MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7068738
23 July 2020
Re-Inspection · MTSA Verification · Special · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7019088
10 June 2020
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7001004
24 April 2020
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6949297
24 March 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6933061
12 March 2020
Examination of Repairs
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6927965
18 February 2020
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6910725
13 February 2020
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6909107
24 January 2020
Deficiency Check
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6899594
23 January 2020
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6894590
16 December 2019
Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6874865
30 July 2019
Administrative Inspection
Administrative · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6770629
29 July 2019
MTSA Verification · Special
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6759863
1 June 2018
Administrative Inspection
Administrative · USCG East District (dp) · USCG East District (CGD-E) · Activity 6474022
1 June 2018
Construction Oversight · Initial Certification · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6502675
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 16 July 2026
Resolved
Doors shall have a latch with a minimum throw of 3/4 inch which can be operated from either side of the door. Double swing doors, where permitted for the proper utility of the space, may have the latch normally inoperative.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2026
Resolved 3 August 2026
Resolution: Door is now operating as designed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 17 December 2025
Resolved
Doors in bulkheads required to be Class A-60, A-30, or A-15 shall be of hollow steel or equivalent metal construction solidly filled with approved structural insulation capable of meeting the requirements for a Class A-15 bulkhead. MI observed that both the A end and B end passenger fire boundary door does not close properly.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2025
Resolved 9 January 2026
Resolution: Both doors repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 December 2025
Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering, electric power generation and distribution, and emergency internal communications. MI observed the A end MDE oil pressure sensor alarmed but did not secure the engine as designed. Caterpillar attended the vessel to fix the parameters.
Action required: 10 - Deficiency Rectified
Resolved 15 December 2025
Resolution: Set points were adjusted and tests were completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 March 2025
Resolved
Each self-propelled vessel must be provided with a power-driven pump, or pumps connected to the bilge main as required by table 1. Vessels #2 bilge pump was not able to take suction and the #1 bilge pump took over 30 minutes to take suction. Correct bilge system to take suction from each space without excessive delay.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2025
Resolution: MI atteneded vessel and witnessed satisfactory operation of #2 bilge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 March 2025
Resolved
The diesel fuel system must comply with §§ 56.50-60, 56.50-85, and 56.50-90. The fuel supply piping to engines must be of seamless steel, annealed seamless copper or brass pipe or tubing, or of nickel copper or copper nickel alloy meeting the requirements of subpart 56.60 for materials and § 56.50-70(a)(2) for thickness.
Fuel return line on B end MDE was chaffed to it's steel core, replace with new line.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2025
Resolved 24 March 2025
Resolution: Crew replaced fule return line. MI varified correction in person.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 March 2025
Resolved
Each fire pump shall be capable of delivering water simultaneously from the two highest outlets at a Pitot tube pressure of approximately 50 p. s. i. Fire pump took over 20 minutes to get operational, diagnose issue with pump and correct.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2025
Resolved 24 March 2025
Resolution: MI atteneded vessel and witnessed satisfactory operation of both fire pump and emergency fire pump.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 20 March 2025
Resolved
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. NOTE: Normally these tests are conducted annually. Vessel didn’t have any documentation available that these tests have been conducted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2025
Resolved 15 December 2025
Resolution: PSTP's were completed during COI inspection
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2025
Resolved
If your vessel's Certificate of Inspection is renewed annually, the marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, at each inspection for certification. Vessel was not able to test relief valves installed on bodies of receivers. Relief valves will need to be bench tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 April 2025
Resolved 15 December 2025
Resolution: Relief valves were tested during COI.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 20 March 2025
Resolved
Each navigation light must meet the technical details of the applicable navigation rules. Vessels primary forward mast head light was out.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 December 2025
Resolution: Lights were tested and working during COI
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 21 November 2024
Resolved
For the purpose of this subpart, all glass in windows or airports shall be at least 1/4 inch thick. However, greater thickness may be required for strength purposes in certain locations. All glass shall be fitted in steel or equivalent metal frames and shall be retained by steel or equivalent metal glazing beads or angles.
2 BROKEN WINDOWS IN THE PASSENGER LOUNGE REPLACED BY WOODEN SHEETS TO COVER DAMAGE.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2024
Resolved 21 January 2025
Resolution: NCDOT QA, Clayton Cutler, emaled MI's with photographic evidence of temporary solution to M/V RODANTHE's broken windows. Photos attached to documents.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 March 2024
Resolved
Must meet NFPA standard. Vessel does not have required number of activation cylinders for fixed firefighting due to testing for COI.
Action required: 10 - Deficiency Rectified
Resolved 21 March 2024
Resolution: Required cylinders procured from NCDOT stock.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 December 2023
Resolved
Lifejackets must be readily accessible. Lifejacket stowage container lids have seized making them very difficult to open. Current lid securing straps hinder accessibility of lifejackets.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 December 2023
Resolved 22 December 2023
Resolution: Lifejacket container repaired. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2023
Resolved
Vessel's B-end main diesel engine is overheating. Complete permanent repairs prior to carriage of passengers. Vessel's repairs must be cleared by a marine inspector from DD Nags Head IAW 46CFR70.20.
Please conduct sea trials after repair prior to operations in addition, please provide the Masters attestation to the repairs and sea trial, and his/her comfort in running the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 November 2023
Resolution: Cleaned marine growth from blocked vent line in keel cooler cofferdam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 April 2023
Resolved
Vessel's A-end oil cooler failure. Complete permanent repairs prior to carriage of passengers. Vessel's repairs must be cleared by a marine inspector from DD Nags Head IAW 46CFR70.20.
Please conduct sea trials after repair prior to operations in addition, please provide the Masters attestation to the repairs and sea trial, and his/her comfort in running the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2023
Resolution: USCG Marine Inspector received objective evidence through phone conversation with Mater and NCDOT maintenance team: drained engine coolant system and replaced engine oil cooler with new part and replaced engine coolant. Conducted Sea Trials. All sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 29 March 2023
Resolved
Windows are broken in the passenger lounge. Temporary repair has been performed. Perform permanent repair to ensure space is weather tight IAW 46CFR172.30.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2023
Resolved 7 June 2023
Resolution: Observed repaired window while on board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2023
Resolved
B-End fuel system leaking. Make repairs; provide tech
report and Captain's attestation of repairs to the satisfaction of Coast Guard Marine Inspector 46CFR58.01-35.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 March 2023
Resolution: Repair was fixed within ten min. of returning to dock. It was found to have a loose elbow at the fuel PSI sensor. All test SAT.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 June 2022
Resolved
Install 120 B fire ext. in engine room as per table in 46CFR76 and COI, properly mount IAW 46CFR76.
Action required: 10 - Deficiency Rectified
Due 8 June 2022
Resolved 10 June 2022
Resolution: Ext installed in engine room.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 8 June 2022
Resolved
Update fire control plan following changes made during drydock. Submit to MSC for review. Once reviewed by MSC OCMI (MI) will conduct final approvals.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2022
Resolved 10 July 2022
Resolution: Received verification from MSC of submitted updates.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2022
Resolved
Update and submit PSTPs to MSC for approval following changes after DD/Mods IAW 46CFR62.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 July 2022
Resolved 10 July 2022
Resolution: Recieved verification from MSC is reviewing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 November 2021
Resolved
NCDOT reported that the vessel was experiencing excessive vibration from the main engines for unknown reasons. NCDOT removed the vessel from service to troubleshoot and identify cause of vibration. Provide casual factors and corrective actions for excessive engine vibration to USCG Marine Inspector prior to commercial operation
Action required: 60 - Rectify deficiencies prior to movement
Due 22 November 2021
Resolved 7 June 2022
Resolution: Sea trails conducted following Drydock and modifications all SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 November 2021
Resolved
On November 11, 2021, it was reported that the A end clutch disengaged several times while underway. Provide causal analysis as to the cause of the failure and corrective actions taken. Vessel shall not engage in commercial operation until cleared by local USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 November 2021
Resolution: Failure was caused by fried battery supplying breaker panel that shares circuit with thrust controller. Battery replaced in kind and system functioned as intended.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 November 2021
Resolved
Work vest were found stowed with Lifejackets. Remove and properly stow work life jackets IAW 46CFR199.70(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 November 2021
Resolution: Work vest removed from passenger life jacket lockers and stowed in lounge.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 November 2021
Resolved
Stowage of fire eductor required IAW fire control plan. Eductor was found in sink in gear locker. Stow IAW 46CFR76.10-10 and 46CFR 78.45-1.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 November 2021
Resolution: Eductor stowed as per approved Fire Control Plan
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 2 November 2021
Resolved
Prove proper operation of port A & B end search lights IAW 46CFR71.25-50
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 November 2021
Resolution: All spot light operating as designed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 October 2021
Resolved
Vulkan coupling on A-end failed during start-up of the MDE. Replace and conduct sea trials to satisfaction of the attending CG marine inspector IAW 46CFR58.10-10.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 October 2021
Resolution: New coupling installed and sea trials completed with MI.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 13 August 2021
Resolved
Vessel reporting Public Address system and General Alarm is inoperable. Identify the cause and make repairs iaw 46 CFR 113.50-5.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 August 2021
Resolution: Repairs made satisfactory.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 9 April 2021
Resolved
Found outboard passenger lounge window busted after contact with busted pilan at south dock mooring in Ocracoke. Replace window.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2021
Resolved 12 April 2021
Resolution: Window replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 January 2021
Resolved
NCDOT QA found a failed Vulkan coupling on the A-end mde. Replace coupling and conduct operational test.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 February 2021
Resolution: Coupling replaced, tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 December 2020
Resolved
Bilge suction has been modified. Remove all unapproved parts/equipment and ensure crew are well trained on bilge suction alignment and priming techniques iaw 46 CFR 15.405
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2021
Resolved 4 January 2021
Resolution: Unapproved parts have been removed; op test sat.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 21 December 2020
Resolved
Onboard ballast tank indicator is inoperable. Provide onboard table/graph for crew to manually sound tanks and provide accurate tank level iaw 46 CFR 56.50-90.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2021
Resolved 4 January 2021
Resolution: Sounding tables have been provide in the EOS and bridge.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 21 December 2020
Resolved
Onboard navigation equipment computer is intermittently updating while vessel is underway. During "update" the depth sounder is inoperable. Repair/update computer to prevent reoccurrence.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2021
Resolved 4 January 2021
Resolution: A loose connection was found on the pilothouse battery. Battery was replaced and connection repaired; op test sat.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 21 December 2020
Resolved
Provide revised procedure and arrangement for man overboard recovery. Current arrangement is unsafe iaw 46 CFR 199.155(c).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2021
Resolved 4 January 2021
Resolution: A new aluminum ladder has been provided at the embarkation station.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 October 2020
Resolved
Found IBA servicing due October 31st. Ensure annual servicing is completed prior to expiration.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 October 2020
Resolved 6 November 2020
Resolution: IBA's now all properly serviced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 July 2020
Resolved
CAT Techs are replacing the cylinder liners, piston rings, and head gaskets on both A & B MDE. Complete repairs and conduct sea trials to satisfaction of attending CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 August 2020
Resolution: CAT technician completed warranty repairs to both A-end and B-end MDEs; operational test sat.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 April 2020
Resolved
A-end starboard spotlight inop. Repair light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2020
Resolved 10 June 2020
Resolution: Spotlight operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 April 2020
Resolved
Found sound power phone system not operating properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2020
Resolved 10 June 2020
Resolution: Installed new sound powered phone.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 24 April 2020
Resolved
found compass not working. Repair compass.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2020
Resolved 10 June 2020
Resolution: Compass operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 February 2020
Resolved
Anchor was damaged from contacting piling. Conduct repairs to the satisfaction of attending USCG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 March 2020
Resolved 19 February 2020
Resolution: Anchor was replaced with a new one from inventory.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 18 December 2019
Resolved
Found general alarm contact maker not supplied at feeder distribution panel. Install contact maker.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 January 2020
Resolved 24 January 2020
Resolution: IAW 16101-200-320-1, Rev. E, the general alarm system receives power through EP205 located on the bridge and the UPS located adjacent to the bridge. A secondary contact maker is not required.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 December 2019
Resolved
Unable to witness testing of pressure vessel safety relieving devices due to system configuration. Conduct bench test of relieving devices.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 January 2020
Resolved 13 February 2020
Resolution: Witnessed satisfactory testing of the safety relieving devices.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 18 December 2019
Resolved
Unable to conduct drills due to foul weather. Conduct drills.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 January 2020
Resolved 13 February 2020
Resolution: Witnessed satisfactory Fire and MOB Drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 July 2019
Resolved
Vessel suffered a catastophic failure of the A-end main engine. Replace engine and conduct operational test.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 August 2019
Resolved 18 December 2019
Resolution: Engine overhaul completed; operational test sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 29 July 2019
Resolved
Found machinery space missing the required visual indicator to show when the emergency generator was supplying the load. Provide visual indicator.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2019
Resolved 18 December 2019
Resolution: Visual indicator located on engine control panel; sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 July 2019
Resolved
Found improper line used to attach the floating waterlight to each ring lifebuoy. Install proper lines.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2019
Resolved 23 January 2020
Resolution: Proper line attached.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 July 2019
Resolved
Found instruction plaque required to prevent accidental engagement of the transmissions in the wrong direction missing. Install plaque.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2019
Resolved 18 December 2019
Resolution: Instruction plaque installed properly; sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 July 2019
Resolved
Design Verification Test Procedures (DVTP) and Periodic Safety Test Procedures (PSTP) have not been approved. Test with local OCMI upon approval from MSC.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 August 2019
Resolved 11 May 2020