Records from 2018 to 2026. Most recent: inspection, 24 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)55.0 ft × 20.0 ft × 8.0 ft
Registered tonnagegross 58 / net 47
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTELL CITY BOAT WORKS INC · TELL CITY, IN, UNITED STATES · built 2017
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portCHARLESTON, SC
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 December 2025 · expires 30 November 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it47 - Simplified, Net Ton
58 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
5 inspections, each with its date, unit and type; 17 deficiencies with the resolution recorded against each; 1 casualty investigation, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 March 2026
Resolved
If twist-on types of connectors are used, the connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration.
Wire connection for starboard shaft bilge pump was made outside of a enclosure and was not secured to prevent loosening.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2026
Resolved 30 March 2026
Resolution: Received photo of repaired box.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 24 March 2026
Resolved
Emergency exit used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”.
Doors to the engine room were not marked as above.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2026
Resolved 2 April 2026
Resolution: Picture of placards sent.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 March 2024
Resolved
A fixed fire-extinguishing system installed to protect the engine room.
CO2 system has not completed commissioning and missing support brackets and actuator heads are in operative.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 May 2024
Resolution: Hiller replaced heat actuators and conducted satisfactory test and commissioned system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 March 2024
Resolved
All seals and gaskets must be properly maintained to prevent leaks of flammable or combustible liquid, as those terms are defined in 46 CFR subpart 30.10, into the machinery space.
Steering system has large hydraulic leak.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2024
Resolution: Deficiency rectified
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 March 2024
Resolved
In addition to the requirements in paragraph (a) of this section, all fire-suppression and detection equipment and systems on board a towing vessel must be maintained.
Cable/pipe run from machinery space to pilot house needs to be made fire and gas tight.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 May 2024
Resolution: Vessel sealed transists going to the bridge with marine fire caulk.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 25 March 2024
Resolved
Each towing vessel must be equipped with navigation lights, shapes, and sound signals in accordance with the International Regulations for Prevention of Collisions at Sea (COLREGS) or 33 CFR part 84 as appropriate to its area of operation.
Lower tow light is obstructed by overspray.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2024
Resolved 2 May 2024
Resolution: Replaced lower tow light, tested satisfactory
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 25 March 2024
Resolved
A towing vessel must carry adequate and up-to-date charts, maps, and nautical publications for the intended voyage.
No NOAA chart present for operating area.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2024
Resolved 2 May 2024
Resolution: Printed charts for charleston harbor and will print addational charts once vessel knows where it is working.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 March 2024
Resolved
The portable fire pump must be self-priming and power-driven, with: (1) A minimum capacity of at least 300 LPM (80 gpm) at a discharge gauge pressure of not less than 414 kPa (60 psi), measured at the pump discharge.
Pump missing gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 2 May 2024
Resolution: installed pressure gauge
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 March 2024
Resolved
A sufficient amount of lined commercial fire hose 15 meters (50 feet) in length, at least 40 mm (1.5 inches) in diameter and immediately available to attach to it so that a stream of water will reach any part of the vessel.
Hose marked "Na Hoku" remark hose if stating with the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 2 May 2024
Resolution: hose was remarked
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 25 March 2024
Resolved
Except as provided in §§ 80.177 and 80.179, operation of transmitters of any ship station must be performed by a person holding a commercial radio operator license or permit of the class required below. The operator is responsible for the proper operation of the station.
Master did not have documentation of MROP.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 2 May 2024
Resolution: received copy of masters MROP
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 25 March 2024
Resolved
Each towing vessel must perform the applicable tests in Table 143.245(b) of this section. Alarm set points-Twice every 5 years, with no more than 3 years elapsing since last test.
Missing documentation of verification of alarm set points.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 26 March 2024
Resolution: Received report alarms were tested, upon initial testing were inoperative, alarms were corrected and made functional see report in vessel documents.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 25 March 2024
Resolved
Vessel knows and applies the variation and deviation, where a magnetic compass is fitted and where charts or maps have enough detail to enable this type of correction.
Missing compass deviation table.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 1 July 2024
Resolution: Vessel provided deviation table
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 25 March 2024
Resolved
Each vessel must have posters or signs displayed in the vicinity of each survival craft and the survival craft's launching controls that— (a) Illustrate the purpose of controls; (b) Illustrate the procedures for operating the launching device; (c) Give relevant instructions or warnings; (d) Can be easily seen under emergency lighting conditions; and (e) Display symbols in accordance with IMO Resolution A.760(18).
Missing life raft launching instructions.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 2 May 2024
Resolution: launching instructions were printed and posted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 25 March 2024
Resolved
The following systems must be equipped with gauges at the machinery location: (1) Main engine lubricating oil pressure and main engine RPM; (2) Main engine cooling water temperature.
Missing gauges in machinery space
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 2 May 2024
Resolution: Gauges were installed above both engines in the machinery space.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 March 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
operation of shaft seal inspection plate opens shaft tube sea water bleed valve.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 2 May 2024
Resolution: Valve was repositioned to allow inspection of the shaft seal.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 25 March 2024
Resolved
Fire detection system is arranged and installed so a fire in the engine room automatically sets off alarms on a fire detection control panel at the operating station.
Fire detection system was battery was unplugged and breaker turned off. System power sources were restored and operated properly.
Action required: 10 - Deficiency Rectified
Resolved 25 March 2024
Resolution: Resored power to detection panel.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 March 2022
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the 75% of the vessels that has not obtained a valid COI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 March 2024
Resolution: Vessel recieved COI