LADYBOWER is a 2017 tank ship. The Coast Guard has recorded 14 inspections since 2018, most recently in May 2026, along with 5 deficiencies and 2 operational controls.
Records from 2018 to 2026. Most recent: inspection, 4 May 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it9293 - Convention (Subpart B), Gross Ton 10813 - Dead Weight, Metric Ton 16633 - Displacement, Metric Ton 3679 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 14
4 May 2026COC-GAS Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8359194
5 April 2026Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8342984
15 May 2025PSC B · COC-GAS Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8131928
20 May 2024PSC B · COC-GAS Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7911585
16 May 2023COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7685894
12 April 2023Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7667122
10 December 2022Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7607218
20 July 2022Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7512078
14 July 2022Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7506407
17 May 2022PSC B · COC-GAS Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7448965
1 July 2021COC-GAS Annual · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7236945
7 May 2020PSC A · COC-GAS Renew
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6944353
17 August 2018Deficiency Check · Administrative Inspection
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 May 2026Resolved
FIREFIGHTING SYSTEMS AND APPLIANCES SHALL BE KEPT IN GOOD WORKING ORDR AND READILY AVAILABLE FOR IMMEDIATE USE. PSCO OBSERVED THE CO2 FIREFIGHTING SYSTEM FLEXIBLE HOSE BETWEEN CYLINDERS 36 AND 37 INSTALLED IN A WAY THAT CAUSED IT TO BE STRETCHED WITH A 90 DEGREE KINK AT THE FITTING. AND FAILURE OF THE OUTER LAYER. tHE HOSES BETWEEN CYLINDERS 28,29, AND 30 WERE OBSERVED KINKED AND/OR DRY ROTTED. 72 SOLAS (AMMENDED) II-2/14.2.1.2 60 A/C
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 May 2026
Resolution: PSC NOLA received a class report from Bureau Veritas satisfying the requirement.
A certificate called an International Certificate of Fitness for the Carriage of Liquefied Gases in Bulk, should be issued after an initial or renewal survery to a gas carrier engaged in international voyages which complies with the relevant provisions of the Code. As per the International Certificate of Fitness issued to the vessel on 20 May 2020, the vessel is authorized to carry C3+ which is not listed in the IGC Code. IGC Code (1993) 1.5.4.1 40ac
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 May 2022
Resolved 1 August 2022
Resolution: The USCG Marine Safety Center decided that since the cargo C3+ is not in the International Gas Code the ship's company would have to apply for a Tripartite agreement to carry C3+. The company had class remove C3+ from the COF instead.
Deck/Cargo › Cargo Refrigeration › General
Issued 1 January 2018Resolved
0999-Vessel is equipped with a cargo compressor room (port side amidships) and a cargo re-heater room (starboard side amidships) which are both enclosed spaces. Ventilation extraction points from both spaces are located at the top of the space only. (74 SOLAS 14 VII/13.1 REF IGC 93/12.1) (50ac)
Action required: 705 - Other - as specified
Due 1 February 2018
Resolved 31 January 2018
Resolution: Received class report - vessel installed portable ducting to extend ventilation extraction point to bottom of space as a temproary measure and a class memorandum was issued requiring permanent repairs at next dry-dock in 2020.
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 1 January 2018Resolved
9900- Vessel's BWM plan references 1998 version of US BWM regulations on page 154. 33CFR151.2050(g) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 February 2018
Resolved 5 January 2018
Resolution: Received documentary evidence via email that vessel has updated USA-specific appendix to the BWMP to incorporate the most up-to-date version of the U.S. regulations.
Operations/Management › Ballast Water Managment › Submission of Report
Issued 1 January 2018Resolved
9900- Vessel had not submitted ballast water report at the time of USCG exam at 0900 on 1JAN18, vessel moored at or about 2100 on 31DEC17, exceeding 6 hour requirement. 33CFR151.2060(b)(3) 10c
Action required: 705 - Other - as specified
Resolved 1 January 2018
Resolution: Master submitted NBIC report and received confirmation of receipt from NBIC prior to completion of exam.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.