Records from 2017 to 2025. Most recent: inspection, 7 October 2025.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)37.3 ft × 13.2 ft × 2.6 ft
Registered tonnagegross 8 / net 8
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderARMSTRONG MARINE USA INC · PORT ANGELES, WA, UNITED STATES · built 2018
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationMonohull
Hailing portFRIDAY HARBOR, WA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8 - Simplified, Gross Ton
8 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
8 inspections, each with its date, unit and type; 13 deficiencies with the resolution recorded against each; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Inspection history · 8
7 October 2025
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8203171
24 September 2024
Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8009727
5 September 2023
Annual Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7784910
1 September 2022
Internal Structural Exam · Annual Inspection · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7549816
26 August 2021
Internal Structural Exam · Administrative Inspection · Drydock Exam · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7297547
7 May 2020
Drydock Exam · Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6949901
28 May 2019
Annual Inspection · DAPI Audit
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6697299
5 December 2017
Construction Oversight · Initial Certification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6392509
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 October 2025
Resolved
THE OWNER, MANAGING OPERATOR, OR A QUALIFIED SERVICING FACILITY AS APPLICABLE MUST CONDUCT THE FOLLOWING INSPECTIONS AND TESTS: PORTABLE AND SEMI-PORTABLE EXTINGUISHERS MUST BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH NFPA 10... MARINE INSPECTOR OBSERVED PORTABLE FIRE EXTINGUISHERS LAST SERVICED IN SEPTEMBER 2024.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 15 October 2025
Resolution: Fireboy was replaced and tested, fire extinguishers were serviced.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 7 October 2025
Resolved
A VESSEL MUST CARRY EITHER A FIRST-AID KIT THAT MEETS THE REQUIREMENTS IN 46CFR199.175(b)(10) OR A KIT WITH EQUIVALENT CONTENTS AND INSTRUCTIONS. ASPIRIN IN THE FIRST AID KIT WAS PAST THE EXPIRATION DATE.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 15 October 2025
Resolution: New aspirin bottle purchased.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 September 2024
Resolved
Exhaust blower switches must be located outside of any space required to be ventilated by this section, and must be of the type interlocked with the starting switch and the ignition switch so that the blowers are started before the engine starter motor circuit or the engine ignition is energized. A red warning sign at the switch must state that the blowers must be operated prior to starting the engines for the time sufficient to insure at least one complete change of air in the space served.
The exhaust blower servicing the fuel tank compartment was non operational at the time of inspection and a warning sign stating the blower must be operated prior to starting the engine was missing at the operating station. 46CFR182.460(e)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 24 September 2024
Resolved 24 September 2024
Resolution: Vessel reps were able to install and operationally test a new blower servicing the gasoline tank compartment during the time of inspection. All Sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 September 2022
Resolved
A vessel's COI and Stability Letter must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. COI and Stability Letter were not posted.
46CFR176.302/ .306
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2022
Resolved 7 September 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 September 2022
Resolved
Portable fire extinguisher on board small passengers vessels must be installed IAW NFPA 10, Standard for Portable Fire Extinguishers, 2010 Edition, effective December 5, 2009, IBR approved for § 176.810(b).
46CFR175.600
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 September 2022
Resolved 2 September 2022
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 9 September 2021
Resolved
A veesel on a lakes, bays, and sounds route must carry three hand flare distress signals and three hand orange smoke distress signals. All distress signals on vessel were expired. Replace flares with serviceable flares.
Cite: 46CFR180.68
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2021
Resolution: Vessel provided proof of 6 new distress flares onboard vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 September 2021
Resolved
A vessel more than 26 ft. but not more than 65 ft. must carry a minimum of 01 life buoy of not less than 24 inches. Life buoy is sun damaged beyoned repair. Ensure vessel replaces life buoy.
Cite: 46CFR180.70(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2021
Resolution: Vessel operator provided proof of new life buoy received and onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 September 2021
Resolved
Number and identification and their sizes must be marked on each container of life jackets. Location of adult life jackets not marked. Vessel must mark stowage location.
Cite: 46CFR185.604
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 September 2021
Resolution: Vessel provided picture showing stowage location marking for adult life jackets.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 9 September 2021
Resolved
Hydrostatic release unit for EPIRB not marked with expiration date. Vessel must replace hydrostatic release unit and mark with expiration date.
Cite: 46CFR185.740
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 1 October 2021
Resolution: Received photograph showing HRU installed onboard with expiration date marked.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 9 September 2021
Resolved
Each EPIRB, other than an EPIRB in inflatable life raft must be tested monthly. Vessel was not conducting monthly EPIRB test. Vessel must provie proof of EPIRB test.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2021
Resolved 9 September 2021
Resolution: Operator provide log showing EPIRB monthly test conducted on 9/9/2021.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 May 2019
Resolved
Mount Fixed fire extinguisher vertically per instructions on the bottle. Replace Dry Chem extinguisher with CO2 extinguisher. 46CFR181.410
Action required: 705 - Other - as specified
Due 6 June 2019
Resolved 24 June 2019
Resolution: Correctly installed CO2 extinguisher.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 May 2019
Resolved
Wire penetration from fuel space to lazerett is not vapor tight. 46CFR181.400(a)(5)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2019
Resolved 24 June 2019
Resolution: Filled wire pen to make vapor tight.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 28 May 2019
Resolved
Install flame screen on diesel fuel tank vent. 46CFR182.450(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2019
Resolved 24 June 2019
Resolution: Installed flame screen.