MAURY USCG vessel records Sign in
← All vessels

VEGA SONG

VEGA SONG is a 2018 tank ship. The Coast Guard has recorded 10 inspections since 2018, most recently in July 2025, along with 2 deficiencies and 1 operational control.

Records from 2018 to 2025. Most recent: inspection, 17 July 2025.

Built
2018
Last inspected
17 July 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9793260 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1484795
Flag
LIBERIA
—
Maury page id
psix-1484795

Inspections, by type

…with no type recorded1
Years with a record 7 calendar years (2018–2025)
The 10 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it46250 - Convention (Subpart B), Gross Ton
17264 - Convention (Subpart B), Net Ton
50591 - Dead Weight, Metric Ton
69657 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 10

17 July 2025 COC-GAS Annual · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8187776
11 December 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8046371
22 July 2024 PSC B · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7963930
1 July 2023 COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7720859
17 May 2022 Administrative Inspection · COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7453017
19 May 2021 COC-GAS Annual · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7200837
9 January 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7121997
16 May 2020 Ballast Water Examination · PSC A · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6953317
8 December 2018 ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6592293
8 February 2018 Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6346245

Deficiency record · 2

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 16 May 2020 Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate for key shipboard operations concerning the safety of personnel ship and protection of the environment. The various tasks should be defined and assigned to qualified personnel. Vessel's crew uses their cargo gas as a testing medium to test fixed gas system LEL alarm. Vessel did not have any procedures to instruct crew members in how to conduct a test, only calibration is addressed. ISM Code A/7 - 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2020
Resolved 9 January 2021
Resolution: The vessel submitted documentation attesting that the correct procedure of fixed gas detection system testing and calibration is addressed in the company's SMS procedures.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 16 May 2020 Resolved
Incinerator walls are to be protected with insulated fire bricks/refractory. Refractory on incinerator door was damaged and falling off. MARPOL VI/16 -10c
Action required: 10 - Deficiency Rectified
Due 16 May 2020
Resolved 16 May 2020
Resolution: Replaced Refractory

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.