Records from 2018 to 2024. Most recent: inspection, 2 June 2024.
Inspection history · 8
2 June 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7925028
12 April 2024
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7891921
9 February 2023
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7634520
14 December 2022
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7606789
14 December 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7610123
12 December 2022
COE-Administrative
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7607984
6 November 2019
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6843103
23 June 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6453016
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 April 2024
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed that ships engineers temporarily installed a 01 gallon container to catch leaking hydraulic oil from the pressure lines feeding aft stbd captstan at the last facing block before the piping turns vertical to penetrate the overhead in the steering gear space. 74 SOLAS (cons), II-1/26.1, Next US after Foreign, Code 40.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 May 2024
Resolved 2 June 2024
Resolution: PSC NOLA received a class report from NKK satisfying the requirement.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 April 2024
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed temporary repair on the lube oil heat exchanger seawater feed line and on the flange for the discharge side of the circulating pump for the A.C. 74 SOLAS cons., II-1/26.1, Next US after foreign, Code 40.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 May 2024
Resolved 2 June 2024
Resolution: PSC NOLA received a class report from NKK satisfying the requirement.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 December 2022
Resolved
07110 - Fire Safety - Spare charges shall be provided for 100% of the first ten extinguishers and 50% of the remaining fire extinguishers capable of being recharged on board. PSCO discovered that vessel did not have appropriate fire extinguishing agent to replace Yamato ABC powder fire extinguisher
- 74 SOLAS 20 II-2/10.3.3
- 40AC
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 February 2023
Resolution: Received class report to clear deficiency.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 December 2022
Resolved
07199 - Fire Safety - The ignitability of combustible materials shall be restricted. PSCO observed a blanket and pillow fixed as a bed directly next to the main electrical switchboard in the engine control room
- 74 SOLAS 20 II-2/4.1.3.
- 15AC
Action required: 15 - Rectify deficiencies by next port
Due 14 December 2022
Resolved 14 December 2022
Resolution: Crew members removed blanket and pillow.