GORDON K is a 2019 tank ship. The Coast Guard has recorded 10 inspections since 2018, most recently in August 2025, along with 15 deficiencies.

Records from 2018 to 2025. Most recent: inspection, 29 August 2025.

Built
2019
Last inspected
29 August 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 29 August 2025
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2018–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDK6396
1486808
Flag
UNITED STATES
Maury page id
psix-1486808

Documentation record

Registered dimensions (L × B × D)76.5 ft × 24.0 ft × 8.0 ft
Registered tonnagegross 98 / net 78
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderB & T WELDING LLC · VENICE, LA, UNITED STATES · built 2019
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portGALVESTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 25 February 2026 · expires 31 March 2027
Service, as the file records itTank Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it78 - Simplified, Net Ton
98 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 10

29 August 2025 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8220546
30 May 2024 Drydock Exam · COI Inspection · Cargo Tank Internal · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7923090
21 June 2023 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7720324
23 June 2022 MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7488579
7 June 2022 Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7470997
30 September 2020 Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7069296
29 September 2020 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7067669
22 November 2019 Deficiency Check · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6860901
10 July 2019 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6745609
15 January 2018 Construction Oversight · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6386548

Deficiency record · 15

02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 August 2025 Resolved
When minor alterations or minor repairs become necessary such works shall be done under the Officer in Charge Marine Inspection (OCMI). In your letter dated May 28, 2019 from the Marine Safety Center regarding stability calculations it states, “...the primary responsibility for accuracy and compliance with applicable regulatory requirement rests with the certifying professional engineer.” Provide attestation from the certifying professional engineer or naval architect that the forepeak access hatches are acceptable and in accordance with the Entech Designs LLC stability calculation dated May 5, 2019.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 September 2025
Resolved 5 September 2025
Resolution: Vessel Provided stability documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 August 2025 Resolved
All bilge pipes used in machinery spaces shall be made of steel or other acceptable material. MI observed flexible hose installed in the bilge suction line of the engine room bilge line. If flexible hose is installed in a vital water system, it must meet SAE J-1942 standards and installed with factory end fittings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2025
Resolved 5 September 2025
Resolution: Vessel welded steel pipe repalcing rubber hose.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 29 August 2025 Resolved
Where air pipes to ballast and other tanks extend above the freeboard or superstructure decks, the exposed parts of the pipes shall be of substantial construction; the height from the deck to the point where water may have access below shall be at least 30 inches on the freeboard deck and 171/2 inches on the superstructure deck. MI observed fill caps for ballast tanks flush with the deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2025
Resolved 5 September 2025
Resolution: Vessel welded stand pipes at 33".
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 29 August 2025 Resolved
Vessel owners or operators must ensure their vessels are operating in compliance with this part. MI identified that the operator is leaving the vessel unattended at a non regulated facility.
Action required: 10 - Deficiency Rectified
Due 29 August 2025
Resolved 29 August 2025
Resolution: Rectified on the spot
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 May 2024 Resolved
Nonmetallic flexible hose may be used in lengths not exceeding 76 cm (30 inches) where flexibility is required, subject to the limits in paragraphs (a)(1) through (4) of this section. MI observed fuel hose lengths on both MDE's approximately 8' long. Minimize flexible fuel hose length to 30" meeting SAE J-1942 stanadards.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2024
Resolved 1 August 2024
Resolution: Vessel submitted photographs of fixed section of piping
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 21 June 2023 Resolved
When minor alterations or minor repairs become necessary such works shall be done under the Officer in Charge Marine Inspection (OCMI). Nearly all freeing ports were found to be welded shut in the after part of the vessel without OCMI approval. In your letter dated May 28, 2019 from the Marine Safety Center regarding stability calculations it states, “...the primary responsibility for accuracy and compliance with applicable regulatory requirement rests with the certifying professional engineer.” Provide attestation from the certifying professional engineer or naval architect that the freeing port modification is acceptable and in accordance with the Entech Designs LLC stability calculation dated May 5, 2019. Provide documentation or remove the welded sections of freeing port within 30 days to the satisfaction of the attending Marine Inspector (MI). 46 CFR 30.01-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 25 July 2023
Resolution: Vessel removed welded plates in freeing ports and sent photos.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 June 2023 Resolved
Lifejackets must be stowed so that the distribution and donning does not impede orderly movement to muster stations and survival craft embarkation stations. Lifejackets were stowed underneath a bench seat which required multiple steps to access them and werenot readily accessible by the crew. Install a new arrangement for quicker access within 14 days to the satisfaction of the attending MI. 46 CFR 199.212(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 25 July 2023
Resolution: Vessel installed a cabinet for quicker access to lifejackets.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 June 2023 Resolved
Approved portable fire extinguishers (PFEs) must be installed in accordance with table 34.50-10(a) of this section. The public space on the main deck has two CO2 10-B:C PFEs, not a 2-A PFE as required; the machinery area has two CO2 10-B:C fire extinguishers, not two 40-B PFEs as required; the cargo deck area has one 10-B:C, not two 40-B PFEs as required; and there is not a spare 2-A and 40-B PFE onboard as required, which all needs to be corrected to the satisfaction of the attending MI. 46 CFR 34.50-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 12 July 2023
Resolution: Vessel purchased new fire extinguishers and numbered them.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 21 June 2023 Resolved
Retro-reflective material. The lifebuoys shall be fitted with retro-reflective material (tape) with a minimum of 5 cm (2 inches) width around the lifebuoy at four locations spaced equally around the circumference of the lifebuoy. Retro-reflective material shall be Type II material that is approved under 46 CFR 164.018. 46 CFR 160.150-3(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 25 July 2023
Resolution: Vessel purchased current corrected charts.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 21 June 2023 Resolved
Each vessel must have marine charts that are currently corrected. Vessel had a Furuno chart plotter with an SD card with no record or log of notice to mariners or updated marine charts. Provide updates or current corrected paper charts as well as maintaining a proper update log within 14 days to the satisfaction of the attending MI. 33 CFR 164.33(a)(1)(ii)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 25 July 2023
Resolution: Def closed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 June 2023 Resolved
Each fire extinguisher shall be marked with a number and the location where stowed shall be marked in corresponding numbers in at least 1/2 inch figures. All PFE stowage locations are not marked with the corresponding number of its respective PFE. Mark all stowage locations appropriately. 46 CFR 35.40-25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 25 July 2023
Resolution: Vessel numbered all extinguishers
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 21 June 2023 Resolved
All self-propelled vessels shall have permanently exhibited for the guidance of the officer in charge of the vessel the following plans: General arrangement plans showing for each deck the fire extinguishing appliances, etc. The general arrangement plan will need to be updated to reflect the new/corrected PFEs installed onboard, reviewed and approved by the attending MI. 46 CFR 35.10-3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2023
Resolved 25 July 2023
Resolution: Vessel updated general arrangements/fire control plan to satisfaction of attending MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 June 2022 Resolved
Unapproved STBD generator keel cooler piping (PVC) installed. Install APPROVED piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 July 2022
Resolution: Metal piping installed to replace PVC. Pictures uploaded into DOCUMENTS.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 29 September 2020 Resolved
The operation of the carbon dioxide system shall automatically shut down any mechanical ventilation. The vents for MDE's are not operating as designed. Make permanent repairs to satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 9 October 2020
Resolved 29 September 2020
Resolution: Fire dampner repaired.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for personnel on tankers
Issued 22 November 2019 Resolved
The terms, endorsements, and conditions set forth on a certificate of inspection shall have the same force and effect as the regulations contained in this subpart. The vessel is required by their COI to maintain one individual with a tankerman-PIC endorsement on board for the purpose of conducting cargo operations. The vessel was found to be operating with only a tankerman-PIC barge endorsement and not a tankerman-PIC endorsement. Vessel is not permitted to conduct cargo operations until an individual holding the proper endorsement is employed aboard the vessel.
Condition: Invalid
Action required: 703 - Prior to bunkering operations
Resolved 27 November 2019
Resolution: New tankerman with proper tankerman PIC endorsement has been hired by the company.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.