← All vessels
ATLANTIC SURVEYOR
Research Vessel · Research Ship class · Built 1970s · USCG East District (CGD-E) · Other hulls named ATLANTIC SURVEYOR
ATLANTIC SURVEYOR is a 1977 research vessel. The Coast Guard has recorded 63 inspections since 1989, most recently in May 2026, along with 129 deficiencies and 3 casualty investigations between 2007 and 2013.
Records from 1989 to 2026. Most recent: inspection, 27 May 2026.
- Built
- 1977
- Last inspected
- 27 May 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 129 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 3 investigations · 2007–2013
Identity
582365
WDM8530
149547
Flag
UNITED STATES
366733250, 368244130
Maury page id
psix-149547
Inspections, by type
…with no type recorded6
Years with a record
35 calendar years (1989–2026)
The 63 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Research Ship class in Maury's sources begin in 1980.
Documentation record
Registered dimensions (L × B × D)103.9 ft × 25.0 ft × 6.7 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderUNIVERSAL IRON WORKS INC · HOUMA, LA, UNITED STATES · built 1977
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portCAPE MAY, NJ
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 23 April 2026 · expires 30 April 2027
Service, as the file records itResearch Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
EX361MMSI 368244130 · active · exemption · granted 21 May 2026, expires 21 May 2030
EX354MMSI 368244130 · active · exemption · granted 9 January 2026, expires 9 January 2030
WDM8530MMSI 368244130 · active · compulsorily equipped · granted 12 March 2022, expires 12 March 2032
WTR5417MMSI 366733250 · active · compulsorily equipped · granted 22 February 2017, expires 6 May 2027
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 63
27 May 2026
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8382116
15 October 2025
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8254209
5 June 2025
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8152235
23 October 2024
COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8020303
1 February 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7858970
12 September 2023
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7790114
28 March 2023
Drydock Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7658262
2 February 2023
Plan Review "T" Boat · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7630766
19 August 2022
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7538131
13 April 2022
Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7430565
5 April 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7169134
8 March 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7152028
3 February 2020
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6900337
7 October 2019
In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6829891
1 April 2019
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6653697
15 February 2019
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6626599
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6506059
17 April 2018
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6393545
29 March 2017
Hull Examination · Administrative Inspection · DAPI Audit · Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6111085
25 March 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5840509
21 March 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5837793
5 February 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5810381
23 July 2015
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5198393
5 May 2014
Plan Review "T" Boat · Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4865367
17 February 2012
DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4246426
17 February 2012
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4274347
12 February 2010
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3679143
18 April 2008
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3189084
13 March 2008
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3188807
12 April 2007
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2902363
21 February 2006
Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2587273
18 April 2005
Type not recorded
No type recorded · Station Manasquan Inlet · USCG East District (CGD-E) · Activity 2337101
2 March 2005
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2289324
21 January 2005
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2278455
2 December 2004
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2258491
30 March 2004
Periodic Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2039359
17 March 2003
Internal Structural Exam · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1758201
31 January 2003
In-Service Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1738081
27 January 2003
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1734792
2 July 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1640846
2 April 2002
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1600694
9 January 2001
COI Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1056514
15 February 2000
Hull Examination · Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1429296
16 December 1999
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 812195
10 December 1998
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 808634
27 April 1998
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1128976
9 December 1997
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 782534
11 December 1996
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1094603
11 December 1996
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1130748
5 March 1996
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1374675
5 January 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 837368
15 December 1994
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 838918
15 December 1994
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1090227
28 February 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 854067
8 December 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1159968
18 December 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 830961
18 December 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1247107
2 October 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 171089
15 July 1992
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1463010
21 August 1991
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1254030
20 August 1990
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1233174
1 September 1989
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 891779
9 April 1989
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 438738
Deficiency record · 129
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 15 October 2025
Resolved
After loading and prior to departure and at all other times necessary to assure the safety of the vessel, the master shall determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be. The vessel may not depart until it is in compliance with these requirements. The vessel's maximum permitted draft at the bow was 5' 11-3/8" the observed draft at the bow was approximately 6'9". Vessel was not modified to prevent filling of ballast tanks. Vessel did not have a working tank plan aboard.
46 CFR 185.315 (old)
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 15 October 2025
Resolved
Vessels operated beyond the 20 nautical mile limitation specified in paragraph (a)(1) of this section, but not more than 100 nautical miles from the nearest land, must be equipped with a MF-DSC frequency transmitter meeting the requirements of § 80.1101(c)(3) and capable of transmitting J3E emission and a receiver capable of reception of J3E emission within the band 1710 to 2850 kHz, in addition to the VHF-DSC radiotelephone installation required by paragraph (a)(1) of this section. Vessel did not have a single side band radio.
47 CFR 80.905(a)(2)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 October 2025
Resolved
Wiring methods and materials (50 volts or more).
(a) All wiring and cables shall be suitable for marine service and for the particular installation used. Vessel had an abundance of dead end wires coiled up throughout the engine room.
46 CFR 183.10-20 (old)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 October 2025
Resolved
Additional control equipment and measuring instruments shall be provided as necessary to ensure satisfactory operation of the generator or generators. Mechanical interlock would not stop the generator switches due to interlock being loose and switch being broken.
46 CFR 183.10-5 (old)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 October 2025
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Vessel had a seawater pump in engine room with cracked housing and was extremely corroded
46 CFR 176.800
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 15 October 2025
Resolved
Each unit must have hand covers, guards, or rails installed on all belts, gears, shafts, pulleys, sprockets, spindles, flywheels or other reciprocating, rotating or moving parts of machinery or equipment normally exposed to contact by personnel. Vessel had exposed steering equipment from missing guard.
46 CFR 108.223
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 15 October 2025
Resolved
On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces and all other spaces normally manned by crew members. Internal public address system inoperable.
46 CFR 184.610(b)
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 October 2025
Resolved
A 40-B portable fire extinguisher installed outside the space may be substituted for a fixed gas fire extinguishing system in a storeroom containing flammable liquids (including liquors of 80 proof or higher where liquor is packaged in individual containers of 9.5 liters (2.5 gallons) capacity or greater) or a paint locker, with a volume of not more that 5.7 cubic meters (200 cubic feet) Vessel had a 10-B fire extinguisher.
46 CFR 181.400(b)(3)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 October 2025
Resolved
Each ring buoy with a floating waterlight must have a lanyard of at least 3' but not more than 6' securing the waterlight around the body of the ring life buoy. The waterlight was secured to the grab line.
46 CFR 180.70(d)(2)
12 - Dangerous Goods › N/A - No Subsystem › Dangerous goods / harmful substances in pack. form
Issued 15 October 2025
Resolved
Cylinder requirements. Cylinders used for containing hazardous ships' stores that are compressed gases must be maintained and retested in accordance with 49 CFR 180. — Vessel had an oxygen tank that showed a last hydro date of 10/12.
46 CFR 147.60
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 15 October 2025
Resolved
Covered metal trash containers shall be provided in lounge areas and the spaces shall be maintained to minimize fire and safety hazards and to preserve sanitary conditions. Vessel had combustible plastic trashcans on board
46 CFR 177.30-7(d) (Old)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 October 2025
Resolved
Have a nozzle that has a 1/2 inch solid stream orifice or a combination nozzle approved by the Commandant in accordance with 162.027-6 of this Chapter. The nozzle must be bronze or another material that has strength and corrosion resistance properties equal to those of bronze. Vessel had a plastic nozzle.
46 CFR 181.15-10(d)(2)
(Old)
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 15 October 2025
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Vessel did not have any paper charts, Rose Point ECS does not meet equivalency as per NVIC 01-16 CH-3 (RTCM Class B ECS).
46 CFR 184.420 (a) (1)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 October 2025
Resolved
Class 1 doors are permitted within passenger, crew, and working spaces wherever located. if- The vessel is less than 150 gross tons and will not proceed more than 20 nautical miles from shore. Vessel has a watertight door on a watertight engine room bulkhead and route beyond 20NM, vessel's stability letter indicates there are no watertight doors. Owner could not provide evidence the WTBH was not required to comply with flooding or damage stability regulations. COI/Stability letter allows cargo in excess of that allowed by the crane installation letter of 19 April 2022.
46 CFR 170.24 (b) (2)
(Old)
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 15 October 2025
Resolved
After loading and prior to departure and at all other times necessary to assure the safety of the vessel, the master shall determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be. The vessel may not depart until it is in compliance with these requirements. The vessel's stability letter stated the Forepeak Ballast, Ballast 1 CTR, Ballast 2 P&S, Ballast 3 P&S, and Freshwater 1 P&S must be empty at all times. MI's found ballast water in Ballast 2 P&S, and Ballast 3 P&S. FW 1 P&S could not be confirmed.
46 CFR 185.315 (old)
05 - Radio Communications › N/A - No Subsystem › MF Radio installation
Issued 15 October 2025
Resolved
Vessels operated beyond the 20 nautical mile limitation specified in paragraph (a)(1) of this section, but not more than 100 nautical miles from the nearest land, must be equipped with a MF-DSC frequency transmitter meeting the requirements of § 80.1101(c)(3) and capable of transmitting J3E emission and a receiver capable of reception of J3E emission within the band 1710 to 2850 kHz, in addition to the VHF-DSC radiotelephone installation required by paragraph (a)(1) of this section. Vessel did't have a MF/SSB of FCC exemption. Prior to operating beyond 20 NM.
47 CFR 80.905(a)(2)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 October 2025
Resolved
Where flexible nonmetallic hose is permitted for use in piping systems by this section, it must meet SAE J-1942 (incorporated by reference; see 46 CFR 175.600) or be specifically approved by the Commandant. The following restrictions apply: Vessel MDEs fuel hoses were Aeroquip
GH 781-10 and did not have the required 624-18 Fire Sleeve for fuel service.
46 CFR 182.720(e)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 October 2025
Resolved
Fire extinguishing equipment installed on a vessel in excess of the requirements of §§ 181.400 and 181.500 must be designed, constructed, installed, and maintained in accordance with a recognized industry standard acceptable to the Commandant (CG-ENG-4). Vessel had Ellide Fire Fire Extinguishing Balls onboard which were not USCG Approved.
46 CFR 181.120(a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 June 2025
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). (Over 65 feet needs 2 fixed power pumps). Vessel was missing a bilge pump. Install bilge pump to the satisfaction of the marine inspector. 46 CFR 182.25-10(a)
"OLD T"
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 October 2024
Resolved
A bilge pipe piercing the collision bulkhead must be fitted with a screw-down valve located on the forward side of the collision bulkhead and operable from the weather deck. Vessel screw-down valve was broken. Repair screw-down valve to make it operable from the weather deck. 46CFR182.510(d)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 October 2024
Resolved
vessel ready for inspections of machinery, fuel, and piping systems, including all machinery essential to the routine operation. Port and Starboard shaft seals were leaking water and need to be replaced. Replace shaft seals prior to next credit dry dock. 46CFR176.804(c)
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 1 February 2024
Resolved
Fuel fill pipes shall terminate on the weather deck clear of coaminngs and shall be fitted with shutoff valves, watertight deck plates or screw caps suitably marked for identification. Vessel was found with cam lock fittings.46CFR182.20-30(c)
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 1 February 2024
Resolved
Hydrostatic tests under pressure . Each pressure vessel ... must be subjected to a hydrostatic test at a pressure of 1.25 times the maximum allowable working pressure twice within any five-year period. Pressure vessel has exceeded its required hydrostatic test due date. 46CFR61.10-5(d)
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 28 March 2023
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years.
Vessel missed it's drydock that was due 31MAR23.
Vessel must complete drydock examination prior to carrying passengers. 46 CFR 176.600
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 2 February 2023
Resolved
Stowed so that when the vessel sinks the survival craft floats free and, if inflatable, inflates automatically. Both life rafts were found improperly attached to weak link. 46 CFR 180.130(a)(2)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 February 2023
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] main engine has exposed wiring on the RPM sensor. Repair/replace to the satisfaction of attending MI.46 CFR 183.01-15(a)"OLD-T"
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 February 2023
Resolved
The setting of safety valves or relief valves on boilers and unfired pressure vessels shall be checked. Pressure relief valves for both unfired pressure vessels would not re-seat after manually lifted. Repair/replace to the satisfaction of attending MI. 46 CFR 176.25-39(b)(2)"OLD-T"
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 2 February 2023
Resolved
Each hatch exposed to the weather must be watertight. Engine room escape hatch does not seal properly making it non-water/weathertight. Repair/replace to the satisfaction of the attending MI. 46 CFR 171.124(a)
"OLD-T"
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 2 February 2023
Resolved
Watertight door that gives access into the hull shall be watertight. Knife edge of WTD from main deck to tool room has wastage on bottom edge. Repair/replace to the satisfaction of the attending MI.46 CFR 171.124(e)
"OLD-T"
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 February 2023
Resolved
Penetrations in watertight bulkheads must have means to make them watertight. Electrical penetration forward bulkhead of tool room found not watertight. 46 CFR 171.114(a)(2)
"OLD-T"
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 2 February 2023
Resolved
At each inspection for certification all observed unsafe practices must be corrected and in a satisfactory condition. Both shaft seals have excessive leaking. Repair/replace to the satisfaction of attending MI. 46 CFR 176.830(a)
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 13 April 2022
Resolved
Forward masthead light was inoperable. Repair masthead light and prove proper operation.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 April 2022
Resolved
Vsl does not have proper distress flares and smoke signals, or substitutes. Acquire 06 hand red flare distress signals and 06 hand orange smoke distress signals. Further substitutions are listed in 46 CFR 180.68(c).
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 April 2022
Resolved
Vsl needs life jacket placards representing every type of life jacket that is onboard the vessel. Provide proof that the various types of life jackets onboard have a respective placard that is visible to the crew and passengers.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 13 April 2022
Resolved
The outer insulation of main passageway emergency light cable was damaged and the wiring was exposed. Replace cable.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2021
Resolved
Remove extension cord pwr supply for freezer on aft deck; hardwire freezer to pwr supply w/appropriate circuit protection. Provide plan for review prior to installation. Due April 11, 2021. 46 CFR 176.700, 46 CFR "Old T" 183.10-20(a)(2)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 11 March 2021
Resolved
Cap off empty pipe in ER port side at top of blkhd formerly used as wire/pipe blkhd penetration and small dia (~1") penetration in same blkhd towards top-center of blkhd. Due April 11, 2021. 46 CFR "Old S" 171.040
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2021
Resolved
Remove wire-tied three-way plug from outlet in ER on fwd blkhd. CORRECTED ON THE SPOT. 46 CFR "Old T" 183.10-20(a)(2)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 March 2021
Resolved
Repair/replace junction box and switches on bulwark next to port lazarette hatch with proper watertight enclosure. Due April 11, 2021. 46 CFR "Old T" 183.10-20(k)
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 3 February 2020
Resolved
Replace expired EPIRB hydrostatic release. limited to 3nm.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 3 February 2020
Resolved
Match hatch to the engine room weathertight
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 3 February 2020
Resolved
Replace expired batteries in waterlights. limited to daytime operations
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 3 February 2020
Resolved
Prove charts on the ECID system are up to date
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 February 2020
Resolved
Replace fire pump pressure guage
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 3 February 2020
Resolved
Provide radio operators permit for masters of vessel
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 3 February 2020
Resolved
Provide proof of voyage plans
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 1 April 2019
Resolved
Vessel did not have fire/abandon ship drill records onboard.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2019
Resolved
Vessel is required to have the generators circuit breakers to be arranged so as to prevent their simultaneous connection to the switchboard. Marine Inspectors discovered that one of the breaker switches had broken off rendering the interlock device ineffective. Replace the breaker switch so the interlock device can function as designed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2019
Resolved
Vessel is required to have electrical equipment installed suitable for the roll and pitch of the vessel underway. Marine Inspectors discovered the washer and dryer installation on board was not suitably secured. Securely mount the washer and dryer in place to remove hazard to crew.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: Invalid Call Sign.
Engineering › Bilge Water Management System › Piping
Issued 25 April 2018
Resolved
Prove proper operation of bilge pickup in lazarette.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 25 April 2018
Resolved
Renew FCC ship station license, FCC radio safety certificate, FCC Bridge to bridge radio certificate.
Electrical › Electrical Distribution System (emergency) › Outlet Box
Issued 25 April 2018
Resolved
Replace outlet in engine room that charges emergency light.
Fire Fighting › Fire Pumps › Arrangement
Issued 25 April 2018
Resolved
Place pressure guage on fire pump outlet.
Lifesaving › Hand Flares › Approval
Issued 25 April 2018
Resolved
Provide all required flares.
Construction/Loadline › Hull › Bottom Plating
Issued 26 June 2017
Resolved
RT01: Provide thickness readings of the 04 Locations as discussed with vessel rep (Collision bulkhead, 02 ER Locations, and port ER Hull). If repairs are being conduct, submit plans.
Engineering › Bilge Water Management System › Not Operational
Issued 26 June 2017
Resolved
RT02: Vacuum ER bilge to be ready for inspection.
Engineering › Diesel Engine (auxiliary) › Block
Issued 26 June 2017
Resolved
RT03: Clean out valve uptakes to be free of debris.
Navigation › Piloting/Steering › Maneuverability Rating
Issued 26 June 2017
Resolved
RT04: Replace shaft bearings and rudder bearings as discussed.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 29 March 2017
Resolved
Hydrostatically test 2 air receivers to 1.25x MAWP in accordance with 46CFR61.10-5(a). Due PTCDD.
Electrical › Electric Supply System (service) › Cable
Issued 29 March 2017
Resolved
Provide bundling and metal supports for wiring on the top deck (above wheelhouse). Due PTCDD.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 21 March 2016
Resolved
Vessel must have emergency lighting illuminating the emergency exits. One emergency exit light missing in the galley and one in the emergency escape hatch from the engine room.
Communications › Radio Communications › EPIRB
Issued 21 March 2016
Resolved
EPIRB Hydrostatic release unit has expired. Replace with new one.
Operations/Management › Drug and Alcohol Testing › Testing, Substances
Issued 21 March 2016
Resolved
Alcohol test swabs have expired. New batch has been ordered but not received at time of inspection.
Construction/Loadline › Hull › Bottom Plating
Issued 23 July 2015
Resolved
CC01: Remove Water from Forepeak, make ready for inspection.
Construction/Loadline › Hull › Bottom Plating
Issued 23 July 2015
Resolved
CC02: Remove water, all dirt, and trash from FWD void bilge. Make ready for inspection.
Construction/Loadline › Hull › Weld
Issued 23 July 2015
Resolved
CC03: FWD STBD Ballast, Remove 02 Plates tack welded to the hull.
Construction/Loadline › Hull › Bottom Plating
Issued 23 July 2015
Resolved
CC04: Remove water and clean bilge in AFT void under water tank and shaft tubes. Make ready for inspection.
Construction/Loadline › Penetrations › Gasket
Issued 23 July 2015
Resolved
CC05: Remove Gasket sealant from scuttle gaskets, renew on weather deck.
Engineering › Bilge Water Management System › Piping
Issued 23 July 2015
Resolved
CC06: Renew old section of bilge piping in lazarette.
Engineering › Sea-water System (primary cooling) › Valve
Issued 23 July 2015
Resolved
CC07: Renew 02 A/C Sea Water valves in engine room.
Construction/Loadline › Hull › Collision Strap
Issued 23 July 2015
Resolved
CC09: Crop collision bulkhead from the keel up to good steel as marked in space.
Construction/Loadline › Hull › Stiffener
Issued 23 July 2015
Resolved
CC10: Crop the center line beam from the stem to the collision bulkhead, from the keep up to the top. Submit repair proposal.
Construction/Loadline › Hull › Hull Plating
Issued 23 July 2015
Resolved
CC08: Crop Port & STBD Side hull plate in the forepeak from the stem leading aft at least 6" past the collision bulkhead into the FWD void from keel up to existing weld. Submit Repair Proposal.
Construction/Loadline › Hull › Hull Plating
Issued 23 July 2015
Resolved
CC11: Provide 3rd party to conduct ultra sonic testing of hull plating in a 2ft grid between bulkheads 8 & 9 and 1 & 2 from port chine to STBD chine.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 5 May 2014
Resolved
Vessel must provide a valid COD. 46CFR67.7
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 5 May 2014
Resolved
Vessel must provide alcohol test kits. 46CFR16
Engineering › Bilge Water Management System › Not Operational
Issued 5 May 2014
Resolved
Vessel's bilge system is not operating correctly. Vessel must prove proper operation. 46CFR182.25-1
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 5 May 2014
Resolved
Vessel must submit a plan proposal to install an indicator on the watertight door to the engine space. 46CFR170.270 (e)
Electrical › Electric Generation Source (service) › Switch
Issued 17 February 2012
Resolved
Low Lube oil pressure switch failed to shut off while checking safeties. Owner to replace Low Lube oil pressure switch in 15 days.
Lifesaving › Inflatable Liferafts › Servicing
Issued 12 February 2010
Resolved
As per subchapter "I" passenger count is reduced to 12 until 8 man liferaft is properly serviced.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 12 February 2010
Resolved
Provide containment for portable deck mounted tank prior to 16Mar10.
Construction/Loadline › Structures › Deck Plating
Issued 18 April 2008
Resolved
Crop and renew wasted area on cargo deck as per the submitted plan.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 13 March 2008
Resolved
RPM overspeed trips and alarms were missing for both MDE.
Personnel › Training › Familiarization Training
Issued 12 April 2007
Resolved
Conduct and log fire drill and MOB prior to conducting U/W survey operations.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 12 April 2007
Resolved
Properly label electrical panel on bridge.
Construction/Loadline › Penetrations › Gasket
Issued 12 April 2007
Resolved
Properly install new gaskets for watertight doors prior to getting U/W.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 12 April 2007
Resolved
Remove duct tape from exhaust lagging w/fire resistant material for port SSDG prior to operating.
Electrical › Lighting (service) › Lighting Fixture
Issued 12 April 2007
Resolved
Properly secure electrical outlet in E/R vestibule.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 2 March 2005
Resolved
Provide current compass deviation table.
Construction/Loadline › Structures › Machinery Space Opening
Issued 2 March 2005
Resolved
Renew gasket on Engine Room emergency escape with material of correct size.
Electrical › Electric Generation Source (service) › Panelboard
Issued 2 March 2005
Resolved
Calibrate E/R frequency meters for ship service generator.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 2 March 2005
Resolved
Provide servicing records for liferafts and mount in proper configuration.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 January 2005
Resolved
Certificate if Inspection expired. Schedule inspection with MSO Philadelphia following damage survey.
Engineering › Steering Gear System › Rudder
Issued 21 January 2005
Resolved
Both port and starboard rudders were sheered off of the vessel following an unknown event, propellers not damaged. Replace port and starboard rudders and provide documentation attesting to the proper repairs.
Engineering › Bilge Water Management System
Issued 17 March 2003
Resolved
Replace wasted bilge strainer in forepeake compartment. LEGACY COMPONENT DESC: Strainer
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Repair crack located in bottom plating on port side at padeye near the rudder. LEGACY COMPONENT DESC: Bottom Plating
Construction/Loadline › Hull
Issued 17 March 2003
Resolved
Repair hole in port side shell plating near the bow located in #2 (void) compartment. LEGACY COMPONENT DESC: Side Shell
Construction/Loadline › Structures
Issued 17 March 2003
Resolved
Repair puncture in collision bulkhead on the portside near hull puncture. LEGACY COMPONENT DESC: Transverse Bulkhead
Electrical
Issued 5 March 1996
Resolved
REMOVE TMEPORARY WIRING 01 DECK AFT OF HOUSE
Unknown
Issued 5 March 1996
Resolved
MAKE VESSEL AVALIABLE FOR DRYDOCK AND SUBSEQUENT MACHINERY INSPECTION.
Unknown
Issued 5 March 1996
Resolved
VESSEL IS NOT TO OPERATE UNTIL ITEMS # 1-7 ARE CORRECTED
Construction/Loadline
Issued 5 March 1996
Resolved
C/R COMBING ON MAIN DECK TO FOREPEAK TANK.
Construction/Loadline
Issued 5 March 1996
Resolved
PROPERLY V/W LONGS FOREPEAK BOTH PORT AND STBD WHERE MARKED. IF METAL SURFACE POOR C/R TO GOOD METAL.
Fire Fighting
Issued 5 March 1996
Resolved
PROPERLY NUMBER ALL FIRE STATIONS.
Electrical
Issued 5 March 1996
Resolved
PROPERLY MARK BREAKER BOXES THROUGHOUT VSL.
Lifesaving
Issued 5 March 1996
Resolved
REPLACE ALL POLYPROP LINE ON BAs.
Fire Fighting
Issued 5 March 1996
Resolved
REPLACE ALL FLAME SCREENS ON MAIN DECK.
Fire Fighting
Issued 5 March 1996
Resolved
PROPERLY MOUNT ALL PORTABLE FIRE EXTINGUISHERS.
Lifesaving
Issued 5 March 1996
Resolved
STENCIL ALL EXPOSURE SUITS WITH VESSEL'S NAME.
Fire Fighting
Issued 5 March 1996
Resolved
STENCIL ALL FIRE AXES WITH VESSEL'S NAME.
Lifesaving
Issued 5 March 1996
Resolved
PROVIDE PROOF OF SERVICING OF LIFERAFTS.
Lifesaving
Issued 15 December 1994
Resolved
HAVE LIFERAFT RESERVICED IN THE PRESENCE OF USCG INSPECTOR.
Lifesaving
Issued 15 December 1994
Resolved
PROVIDE SECOND LIFERAFT IAW 46 CFR 94.10-55. VESSEL SHALL NOT OPERATE BEYOND 20 MILES UNTIL THIS REQT IS CLEARED.
Accommodation/Occupational Safety
Issued 15 December 1994
Resolved
REPAIR POTABLE WATER TANK AIR CUSHION SYSTEM.
Lifesaving
Issued 15 December 1994
Resolved
PROVIDE ONE ADD'L USCG APPROVED LIFERING.
Lifesaving
Issued 15 December 1994
Resolved
PROVIDE 16 LIGHTS FOR ALL IMMERSION SUITS.
Engineering
Issued 15 December 1994
Resolved
REPAIR AND PROVE PROPER OPERATION OF FUEL OIL REMOTE EMERGENCY SHUT-OFF VALVE.
Construction/Loadline
Issued 15 December 1994
Resolved
make fwd blkhd in eng. room watertight iwo new cable penetration.
Documentation
Issued 15 December 1994
Resolved
UPDATE FIRE AND SAFETY PLAN TO REFLECT EQUIPMENT LOCATION ON VESSEL.
Documentation
Issued 15 December 1994
Resolved
PROVIDE CURRENT COPY OF 46 CFR 41-69, 90-139, 166-199 AND 33 CFR 1-199.
Electrical
Issued 15 December 1994
Resolved
INSTALL METAL BAND ON ALL HORIZONTAL CABLE RUNS AT 36" CENTERS.
Engineering
Issued 15 December 1994
Resolved
REPLACE BROKEN SIGHT GLASSES AND INSTALL ROD GUARDS FOR HYD. OIL, LUBE OIL AND COOLING WATER EXPANSION TANKS FOR BOTH GENERATORS AND BOTH PROPULSION DIESLE ENGINES.
Lifesaving
Issued 18 December 1992
Resolved
PROVIDE TWO ADDITIONAL RING LIFE BUOYS AS PER 46 CFR 94.43-10.
Lifesaving
Issued 18 December 1992
Resolved
PROVIDE SUFFICIENT INFLATABLE LIFERAFTS TO ACCOMMODATE ALL PERSONS ON BOARDAS PER 46 CFR 94.10.
Lifesaving
Issued 18 December 1992
Resolved
PROVIDE RESCUE PLATFORM AS PER 46 CFR 94.10-55(B)(1)(4)._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 18 December 1992
Resolved
PROVIDE EXPOSURE SUITS TO ACCOMMODATE ALL PERSONS ON BOARD AS PER 46 CFR 94.41-1._x001C_ _x001C_ _x001C_
Navigation
Issued 18 December 1992
Resolved
PROVIDE COPY OF CURRENT TABLES._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 18 December 1992
Resolved
PROVIDE LIST OF FREQUENCIES FOR SINGLE SIDE BAND TRANSCIEVER TO CORRESPOND WITH PRESENT CHANNEL INDICATOR._x001C_ _x001C_ _x001C_
Casualty record · 3
19 August 2007Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3033425
19 August 2007Routine · role: Involved in a Marine Casualty · activity 3040733
3 August 2013Routine · role: Involved in a Marine Casualty · activity 4675981
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.