Records from 1989 to 2026. Most recent: inspection, 15 January 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 64
15 January 2026
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8296952
14 November 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8268200
5 February 2025
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8069488
17 January 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8065122
28 February 2024
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7871153
6 November 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7821000
8 March 2023
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7647701
3 December 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7601236
30 November 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7367934
16 December 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7112914
9 January 2020
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6885897
24 October 2019
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6841503
26 February 2019
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6632007
13 June 2018
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6443174
20 April 2018
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6395634
14 November 2017
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6306422
14 February 2017
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6087949
7 March 2016
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5828672
2 November 2015
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5755340
20 August 2015
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5221383
4 May 2012
Administrative Inspection · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4301810
1 December 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4199533
14 February 2011
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3945018
14 October 2010
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3870354
16 December 2008
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3380752
27 May 2008
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3218616
10 May 2007
MARPOL Annex V Examination · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2930079
23 June 2006
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2688915
8 June 2006
MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2673780
16 May 2005
Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2358904
15 November 2004
Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2241351
1 July 2004
Type not recorded
No type recorded · Station New York · USCG Northeast District (CGD-NE) · Activity 2121281
25 May 2004
MARPOL Annex V Examination · Annual Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2099120
30 April 2003
MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1783372
11 December 2002
Internal Structural Exam · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1722020
22 May 2002
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1619651
10 April 2002
MARPOL Annex V Examination · Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1603028
15 May 2001
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1465030
4 April 2001
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1447019
20 October 2000
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 823301
20 March 2000
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1468566
30 April 1999
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1126181
19 March 1999
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1424726
17 March 1999
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1444085
19 March 1998
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1110951
12 May 1997
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1102203
24 March 1997
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1097774
25 March 1996
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1077915
4 April 1995
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 846201
20 December 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1139591
25 April 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1168515
8 April 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1168510
6 April 1994
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1168888
11 March 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 840863
10 December 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 832364
16 April 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1267614
30 August 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1245258
19 June 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1245516
8 May 1991
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 934757
21 March 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 906121
14 June 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 918521
23 April 1990
Initial Certification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 913007
20 March 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 911540
2 August 1989
Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 888957
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 20 January 2026
Resolved
Fire extinguishing equipment installed on a vessel in excess of the requirements of §§ 181.400 and 181.500 must be designed, constructed, installed, and maintained in accordance with a recognized industry standard acceptable to the Commandant (CG-ENG-4). MI observed 02 inoperable smoke detectors in aft accommodation area and port crew space. Repair smoke detection within 14 days.
46 CFR 181.120
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 February 2026
Resolved 30 January 2026
Resolution: Reviewed objective evidence of detectors installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 February 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. MI identified raw water leak on generator. Repair prior to carriage of passengers.
46 CFR 183.200(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 March 2025
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 February 2025
Resolved
Rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Equivalent protection may include lifelines, wire rope, chains, and bulwarks, which provide strength and support equivalent to fixed rails. MI identified unsatisfactory railing adjacent to the operating station on the stbd side and damaged chain links adjacent to the operating station on the port side. Repair prior to the carriage of passengers.
46 CFR 177.900(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2025
Resolution: Received photographs of the repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 February 2025
Resolved
Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal. FCC Radio Station Authorization expired 03JUN2024. Replace within 14 days.
47 CFR 80.25(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 February 2025
Resolution: Received FCC Radio Station to expire 14Feb2035.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 February 2025
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (2 1/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. MI identified 01 (2 1/2 gallon) fire bucket missing. Replace within 14 days.
46 CFR 181.610
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 February 2025
Resolution: Received photograph of three (2 and 1/2 gallon) fire buckets.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 February 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection and operation of all watertight closures in the hull, decks, and bulkheads. Identified hole in the stern of the vessel near the camera. Repair within 14 days.
46 CFR 176.802(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 February 2025
Resolution: Received photographs of the repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 February 2025
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Replace the hose clamps identified in port side engine room and secure the surrounding wires. Replace within 14 days.
46 CFR 182.410(d)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 February 2025
Resolved
All engines must be water cooled and meet the requirements of this paragraph. The engine head, block, and exhaust manifold must be water-jacketed and cooled by water from a pump that operates whenever the engine is operating. Raw water pump in engine room needs to be mounted properly. Repair within 14 days.
46 CFR 182.420(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 January 2025
Resolved
A Certificate of Inspection is valid for 5 years for all other vessels. Vessel's COI has expired - vessel must obtain a new COI prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 February 2025
Resolution: COI inspection complete.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 April 2024
Resolved
Gages to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as
to be in view of the operator.
Gages on the Fly Bridge helm station are obscured by grime making them unreadable to the master of the vessel.
46 CFR 182.20-5(b) (Old T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Vessel repaired gauge at flying bridge.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 16 April 2024
Resolved
A vessel of 12 meters (39 feet) or more in length shall be provided with a whistle... The whistle... shall comply with the specifications in Annex III to these Rules (33 CFR part 86).
Ship's whistle does not function.
33 CFR 83.33(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: vessel fixed ships whistle.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 16 April 2024
Resolved
All vessels shall be fitted with such ground tackle and hawsers... depending upon the size of the vessel, the waters on which it operates, and other operating hazards.
Starboard, forward cleat has damage. Operator to provide repair plan to USCG, prior to alterations, for approval.
46 CFR 184.10-1(a) (Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2024
Resolved 30 May 2024
Resolution: Vessel repaired stbd cleat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 16 April 2024
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions.
Vessel's first-aid kits are expired.
46 CFR 184.710 (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Vessel updated first aid kits expired items
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 16 April 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an... man overboard drill be held under simulated emergency conditions specified by the inspector.
Vessel was unable to conduct MOB drill.
46 CFR 176.808(g) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Conducted MOB drill
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 16 April 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that a fire drill be held under simulated emergency conditions to be specified by the inspector.
Vessel was unable to conduct fire drill.
46 CFR 176.810(d)
46 CFR 176.810(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Conducted fire drill
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 April 2024
Resolved
An existing vessel with a hull, or a machinery space boundary bulkhead or deck, composed of wood or fiber reinforced plastic, or sheathed on the interior in fiber reinforced plastic, must comply with the requirements of § 181.400 of this part on or before March 11, 1999. The following spaces must be equipped with a fixed gas fire extinguishing system, in compliance with § 181.410, or other fixed fire extinguishing system specifically approved by the Commandant:(1) A space containing propulsion machinery.
Vessel fixed firefighting system is not in compliance with 181.410. Vessels current pressure switch does not secure the engines as required by 46 CFR 181.410(b)(10). Furthermore, the vessels pressure switch is located in the space which is prohibited by 46 CFR 181.410(b)(1)(i)(ii).
Vessel must submit plans to bring the installed fixed firefighting system in full compliance with 181.410. Plans are to be submitted to MSC w/in 30 days.
46 CFR 181.115(b)
46 CFR 181.400(a)
46 CFR 181.410
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2024
Resolved 18 July 2024
Resolution: Vessel madified supression system. See general information tab.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 29 February 2024
Resolved
Your vessel must undergo an annual inspection with the 3 months before or after each anniversary date. Vessel inspection was canceled after Coast Guard Marine Inspectors arrived to conduct inspections. Complete an annual inspection prior to carrying passengers.
46CFR176.500(b)(1)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 February 2024
Resolved 16 April 2024
Resolution: Completed an Annual Inspection 16APR, new deficiencies pending.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 March 2023
Resolved
It is further intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure, and personnel injury. Inspectors observed soft patches on both fuel pipelines, and witnessed slight leaking while the MDEs were running. Vessel must either: replace damaged piping to original, or replace with proper non-metallic flex hose and fittings, as authorized in 46 CFR 182.20-40.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2023
Resolved 10 April 2023
Resolution: Received pictures attesting to new non-metallic flex hose on fuel lines.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2019
Resolved
Vessel had expired Random Chemcial Testing Program Certificate of Enrollment. Supply updated random test results of crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 March 2019
Resolution: Vessel recieved new certificate.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 15 May 2018
Resolved
vessel is to post and provide written procedures on how to fully and properly operate CO2 system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2018
Resolution: Vessel submitted written procedures and posted them on the bridge.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 15 May 2018
Resolved
vessel is to provide repair proposal on how vessel intends to bring fixed CO2 system in compliance with 46 CFR 181.400
Action required: 705 - Other - as specified
Due 15 June 2018
Resolved 16 July 2018
Resolution: Received proposal from operator. Def cleared, USCG review commenced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 15 May 2018
Resolved
wire connections throughout the vessel must be in watertight junction boxes.
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 22 May 2018
Resolution: Received pictures of proper installation.
Lifesaving › Lifebuoys › Serviceable
Issued 15 May 2018
Resolved
vessel is to provide new lifebuoy.
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 22 May 2018
Resolution: Received pictures of proper installation.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 20 April 2018
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel is outside scope of annual inspection window and shall complete required annual inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2018
Resolution: vessel completed 3rd annual inspection.
Fire Fighting › Fire Pumps › Power Source
Issued 14 February 2017
Resolved
Provide one hand fire pump on board.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 March 2017
Resolved 15 March 2017
Engineering › Bilge Water Management System › Pump
Issued 14 February 2017
Resolved
Provide one fixed power pump and one portable hand pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 March 2017
Resolved 15 March 2017
Fire Fighting › Fire Bucket › Availability
Issued 7 March 2016
Resolved
AF01- Obtain three 2 1/2 gallon fire buckets with lanyards long enough to reach the water. the words "FIRE BUCKET" must be stenciled on each.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2016
Documentation › Certificates/Documents › Certificate of Inspection
Issued 7 March 2016
Resolved
AF02- Post COI in common area.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 18 March 2016
Documentation › Markings/Placards › Lifejacket Placard
Issued 7 March 2016
Resolved
AF03- Post Lifejacket donning placard in common area.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 18 March 2016
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 7 March 2016
Resolved
AF04- Begin logging drills and crew training in new logbook.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 18 March 2016
Communications › Alarms/Indicators › Fire Alarm
Issued 7 March 2016
Resolved
AF05- Repair / replace smoke detectors.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 28 March 2016
Resolution: Received email from operator showing that they purchased and installed the correct smoke detectors.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 14 October 2010
Resolved
Securely mount exhaust piping in way of generator with metal supports.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 November 2010
Resolved 29 October 2010
Resolution: Exhaust piping properly mounted with metal supports.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 October 2010
Resolved
Refasten plywood hanging in starboard engine space and properly support running wires.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2010
Resolved 29 October 2010
Resolution: Plywood refastened and wiring properly supported.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 14 October 2010
Resolved
Provide servicing records for fixed firefighting system prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 October 2010
Resolution: Fixed firefighting system serviced by approved facility.
Engineering › Sea-water System (primary cooling) › Pump
Issued 10 May 2007
Resolved
Make proper repairs to raw water pump on generator.
Due 24 May 2007
Resolved 16 May 2007
Accommodation/Occupational Safety › Cooking Systems › Cooking Fuel
Issued 10 May 2007
Resolved
Install sea rails on galley stove.
Due 24 May 2007
Resolved 16 May 2007
Engineering › Diesel Engine (propulsion-electric) › Piping (air intake)
Issued 10 May 2007
Resolved
Properly re - install lagging on port MDE.
Due 24 May 2007
Resolved 16 May 2007
Engineering › Steering Gear System › Ram Seal
Issued 10 May 2007
Resolved
Tighten shaft packing on port MDE.
Due 24 May 2007
Resolved 16 May 2007
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 10 May 2007
Resolved
Properly relabel 04 adult lifejackets.
Due 24 May 2007
Resolved 16 May 2007
Documentation › Markings/Placards › Lifejacket Placard
Issued 10 May 2007
Resolved
Post emergency broadcast placard and make vsl specific.
Due 24 May 2007
Resolved 16 May 2007
Documentation › Certificates/Documents › Stability Letter
Issued 10 May 2007
Resolved
Post stability letter at operating station.
Due 24 May 2007
Resolved 16 May 2007
Documentation › Markings/Placards › Lifejacket Placard
Issued 10 May 2007
Resolved
Provide correct, specific lifejacket donning placard for all lifejackets.
Due 24 May 2007
Resolved 16 May 2007
Documentation › Markings/Placards › Lifejacket Placard
Issued 10 May 2007
Resolved
Provide correct, specific lifejacket donning placard for all lifejackets.
Due 24 May 2007
Resolved 16 May 2007
Lifesaving › Lifebuoys › Stowage
Issued 10 May 2007
Resolved
Properly splice lifeline around body of ring lifebuoy and clip waterlight lanyard around body of ring lifebuoy.
Due 24 May 2007
Resolved 16 May 2007
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 May 2007
Resolved
Update meds in first aid kit to include eyewash.
Due 24 May 2007
Resolved 16 May 2007
Engineering › Diesel Engine (propulsion-electric) › Bearing
Issued 10 May 2007
Resolved
Investigate source of leaks in port MDE and make permanent repairs as discussed with rep.
Due 24 May 2007
Resolved 16 May 2007
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 May 2007
Resolved
Conduct MOB/fire drills to the sat of attending CG MI utilizing 01 master and 01 deckhand.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2007
Resolved 16 May 2007
Fire Fighting › Ventilation Systems › Ducts
Issued 10 May 2007
Resolved
Provide means of closing and securing engine room ventilation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2007
Resolved 16 May 2007
Engineering › Fuel Oil Service System › Piping
Issued 10 May 2007
Resolved
Replace melted fuel shutoff cable for port MDE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2007
Resolved 16 May 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 May 2007
Resolved
Properly terminate dead end wires in water tank space.
Due 24 May 2007
Resolved 16 May 2007
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 8 June 2006
Resolved
Fax copy of COD to MI upon receipt.
Condition: Improper/Lack of Maintenance
Due 21 June 2006
Resolved 20 June 2006
Communications › Radio Communications › VHF Radiotelephone
Issued 8 June 2006
Resolved
Fax copies of FCC station license and FCC safety certifcate to MI. Vessel is restricted to 1000 feet from shore until license/ certificate are received.
Condition: Improper/Lack of Maintenance
Due 21 June 2006
Resolved 28 August 2006
Resolution: Received copies of FCC station license and FCC safety certificate.
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 June 2006
Resolved
Conduct housekeeping in generator space by properly terminating loose wires on generator and wires overhead and stbd of gen.
Condition: Improper/Lack of Maintenance
Due 21 June 2006
Resolved 20 June 2006
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 8 June 2006
Resolved
Clean bilges and remove muddy debris.
Condition: Improper/Lack of Maintenance
Due 21 June 2006
Resolved 20 June 2006
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 16 May 2005
Resolved
Life jacket donning instructions must be posted.
Due 23 May 2005
Resolved 3 June 2005
Resolution: Lifejacket donning placard has been posted.
Operations/Management › Drills/Instruction › Safety Orientation
Issued 16 May 2005
Resolved
Emergency instructions must be posted.
Due 23 May 2005
Resolved 3 June 2005
Resolution: Emergency Instruction list has been posted.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 16 May 2005
Resolved
Light List needed.
Due 23 May 2005
Resolved 3 June 2005
Resolution: Light List has been purchased.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 25 May 2004
Resolved
Provide closure devices for engine & generator room and mount in vicinity.
Due 15 June 2004
Resolved 19 October 2004
Resolution: Spaces are fitted with closure devices.
Fire Fighting › Fire Pumps › Arrangement
Issued 25 May 2004
Resolved
Provide 3 - 2 1/2 gallon buckets w/ "Fire Bucket" stenciled to side w/ suitable length lanyard attached to each.
Due 8 June 2004
Resolved 19 October 2004
Resolution: Viewed 3 - 2 1/2 gallon fire buckets with "Fire Bucket" stenciled to side with suitable length lanyard attached to each.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 May 2004
Resolved
Post COI in conspicuous location where passengers may view. LEGACY COMPONENT DESC: Certificate of Inspection
Due 8 June 2004
Resolved 19 October 2004
Resolution: COI posted in conspicuous location.
Documentation › Certificates/Documents › Stability Letter
Issued 25 May 2004
Resolved
Post Stability Letter at operating station.
Due 8 June 2004
Resolved 19 October 2004
Resolution: Stability letter posted at operating station.
Electrical › Electric Supply System (service)
Issued 30 April 2003
Resolved
Battery terminal wasted in generator room. (Conductor still connected securely to remaining terminal) LEGACY COMPONENT DESC: Battery Installation
Condition: Unknown
Due 14 May 2003
Resolved 15 May 2003
Resolution: Wasted battery terminal replaced.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 30 April 2003
Resolved
Water leaking from worn gasket on STBD MDE sea strainer.
Due 30 April 2003
Resolved 30 April 2003
Resolution: Gasket replaced, leak stopped.
Accommodation/Occupational Safety › Occupational Safety
Issued 30 April 2003
Resolved
Tighten all deck rails on main and upper deck. LEGACY COMPONENT DESC: Deck Rail
Condition: Unknown
Due 14 May 2003
Resolved 15 May 2003
Resolution: All deck rails tightened and supports added to strengthen.
Documentation › Manuals/Policy Documentation
Issued 30 April 2003
Resolved
Vsl is missing Tidal Current Tables. LEGACY COMPONENT DESC: Tidal Current Tables
Condition: Unknown
Due 14 May 2003
Resolved 15 May 2003
Resolution: Tidal current tables purchased and placed onboard.
Accommodation/Occupational Safety › Occupational Safety
Issued 30 April 2003
Resolved
Generator missing guards over exposed belts. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Condition: Unknown
Due 14 May 2003
Resolved 15 May 2003
Resolution: Satisfactory guards placed over belts on generator.
Engineering
Issued 10 April 2002
Resolved
Replace vent line flex hose for fuel and sewage tanks with approved type as per 46CFR182.730(e) LEGACY COMPONENT DESC: Flexible hose
Due 24 April 2002
Resolved 26 April 2002
Resolution: Observed new and proper hoses.
Engineering › Freshwater Generation System
Issued 10 April 2002
Resolved
Replace generator raw water hose. LEGACY COMPONENT DESC: Piping
Due 24 April 2002
Resolved 22 May 2002
Resolution: New water hose installed.
Electrical
Issued 10 April 2002
Resolved
Remove or insulate dead end wires IWO stbd main engine. LEGACY COMPONENT DESC: Wiring
Due 24 April 2002
Resolved 26 April 2002
Resolution: Dead ended wires removed.
Documentation › Markings/Placards
Issued 10 April 2002
Resolved
Replace emergency broadcast placard.
Due 24 April 2002
Resolved 26 April 2002
Resolution: Observed new emergency broadcast placard.
Engineering
Issued 10 April 2002
Resolved
Perm mount A/C raw water pump. LEGACY COMPONENT DESC: Pump
Due 24 April 2002
Resolved 26 April 2002
Resolution: Observed permanent mounting of pump.
Accommodation/Occupational Safety › Medical/First Aid
Issued 10 April 2002
Resolved
Replace expired meds in first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Due 24 April 2002
Resolved 26 April 2002
Resolution: Observed new meds in first aid kit.
Documentation › Certificates/Documents
Issued 10 April 2002
Resolved
Provide updated certificate of documentation. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Due 24 April 2002
Resolved 26 April 2002
Resolution: Obseved new documentation sticker.
Construction/Loadline
Issued 15 May 2001
Resolved
Arch on flying bridge is severely cracked where radar reciever is mounted. Repair to original strength.
Condition: Unknown
Due 25 June 2001
Resolved 25 June 2001
Documentation
Issued 15 May 2001
Resolved
Radio telephone Safety Certificate expired. Provide Current Certificate.
Condition: Unknown
Due 30 May 2001
Resolved 30 May 2001
Construction/Loadline
Issued 4 April 2001
Resolved
Three 2" gate valves siezed. Repair or Replace.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Engineering
Issued 4 April 2001
Resolved
Replace improper size flame screens with 30x30 mesh.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Construction/Loadline
Issued 4 April 2001
Resolved
Ball valve does not completely close. Repair or renew port main diesel engine ball valve.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Construction/Loadline
Issued 4 April 2001
Resolved
Repair damaged keel, aft, just forward of shaft logs.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Engineering
Issued 4 April 2001
Resolved
Both port and starboard cutlass bearings worn. Renew bearings.
Condition: Unknown
Due 4 April 2001
Resolved 4 April 2001
Lifesaving
Issued 19 March 1999
Resolved
MARK UPPER DECK WITH MAX PASSENGER CAPACITY
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Electrical
Issued 19 March 1999
Resolved
REMOVE DEADENDED WIRES OR TERMINATE IN JUNCTION BOX LOCATED IN ENGINE ROOM AND GENERATOR ROOM
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Fire Fighting
Issued 19 March 1999
Resolved
PROVIDE DISTRIBUTION HORNS (NOZZEL CONES) FOR ALL 3 NOZZELS ON THE FIXED CO2 SYSTEM. INSTALL IAW WALTER KIDDE MANUFATURE INSTRUCTIONS
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Engineering
Issued 19 March 1999
Resolved
CORRECT FUEL FILL HOSE WITH APPROVED PIPE AND HOSE OUTLINED IN 46CFR_x001C_ 172.445. HOSE MUST MEET SAE J1942 RESISTANCE EQUIVALENTS.
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Accommodation/Occupational Safety
Issued 19 March 1999
Resolved
MODIFY TOP AND AFT DECK RAILS TO MEET 39.5" MINIMUM HEIGHT REQUIREMENT
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Electrical
Issued 17 March 1999
Resolved
Install blanks in port engine room electrical panels.
Condition: Unknown
Due 17 March 1999
Resolved 17 March 1999
Accommodation/Occupational Safety
Issued 17 March 1999
Resolved
Repair stbd flying bridge railing and tighten base mounting bolts.
Condition: Unknown
Due 17 March 1999
Resolved 17 March 1999
Construction/Loadline
Issued 17 March 1999
Resolved
Install bilge flooding alarms IAW 46 CFR 182.530.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Construction/Loadline
Issued 17 March 1999
Resolved
Renew 4 aft sea valves and air conditioning sea water suction valve. Complete prior to credit drydock.
Condition: Unknown
Due 17 March 1999
Resolved 17 March 1999
Construction/Loadline
Issued 17 March 1999
Resolved
Install handles on all valves penetrating hull below the waterline. Complete prior to credit dry dock.
Condition: Unknown
Due 17 March 1999
Resolved 17 March 1999
Engineering
Issued 17 March 1999
Resolved
Find and repair sea water leak at generator exhaust manifold. Complete prior to credit dry dock.
Condition: Unknown
Due 17 March 1999
Resolved 17 March 1999
Engineering
Issued 17 March 1999
Resolved
Stbd prop loose on shaft. Inspect key and keyways for proper fit and submita repair proposal subject to OCMI approval. Complete prior to credit _x001C_ dry dock.
Condition: Unknown
Due 17 March 1999
Resolved 17 March 1999
Navigation
Issued 17 March 1999
Resolved
Repack both rudders. Complete prior to credit dry dock.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Navigation
Issued 12 May 1997
Resolved
Replace rusted bolt and cotter pin on steering linkage.
Condition: Unknown
Due 14 May 1997
Resolved 15 May 1997
Engineering
Issued 12 May 1997
Resolved
Make operational from pilothouse, stbd engine shutdown.
Condition: Unknown
Due 14 May 1997
Resolved 15 May 1997
Lifesaving
Issued 12 May 1997
Resolved
Apply reflective tape to 3 ringbouys.
Condition: Unknown
Due 14 May 1997
Resolved 15 May 1997
Lifesaving
Issued 12 May 1997
Resolved
Mark lifejacket lockers "adult lifejackets" and quantity.
Condition: Unknown
Due 14 May 1997
Resolved 15 May 1997
Unknown
Issued 12 May 1997
Resolved
Make operational or remove, SSB radio.
Condition: Unknown
Due 14 May 1997
Resolved 15 May 1997
Navigation
Issued 12 May 1997
Resolved
Make operational vessel horn.
Condition: Unknown
Due 14 May 1997
Resolved 15 May 1997
Construction/Loadline
Issued 24 March 1997
Resolved
Repair fixed hand bilge pump.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Unknown
Issued 24 March 1997
Resolved
Properly secure A/C & sewage discharge pumps in engine compartment.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Electrical
Issued 24 March 1997
Resolved
Properly secure electrical wiring to A/C pump.
Condition: Unknown
Due 24 March 1997
Resolved 24 March 1997
Navigation
Issued 6 April 1994
Resolved
REPLACE ALL NAVIGATION CHARTS WITH ONE'S CURRENT TO WITHIN 3 YEAR CHARTS. CHARTS MUST COVER ENTIRE AREA COVERED BY COI.
Condition: Unknown
Due 28 April 1994
Resolved 28 April 1994
Engineering
Issued 6 April 1994
Resolved
REPAIR OR REPLACE LEAKING FUEL DRAIN VALLVE ON RACOR FILTER IN GENERATOR SPACE AND PROVIDE SAME WITH A PLUG OR CAP.
Condition: Unknown
Due 28 April 1994
Resolved 28 April 1994
Fire Fighting
Issued 6 April 1994
Resolved
HAVE B-II FIRE EXTINGUISHER FROM FWD ACCOMMODATION SPACE, UNDERGO IT'S 6 YEAR SERVICING (EMPTIED AND REFILLED).
Condition: Unknown
Due 28 April 1994
Resolved 28 April 1994
Construction/Loadline
Issued 6 April 1994
Resolved
REPAIR HINGE PORT LIGHT LOCATED IN AFT STBD SIDE HEAD SPACE.
Condition: Unknown
Due 28 April 1994
Resolved 28 April 1994
Documentation
Issued 8 May 1991
Resolved
PROVIDE EMERGENCY CHECK OFF LIST.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Engineering
Issued 8 May 1991
Resolved
REPAIR/REPLACE TRIO (3) RPM GAUGES LOCATED ON BRIDGE AND PROVE PROPER OPERATION.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Lifesaving
Issued 8 May 1991
Resolved
PROVIDE ONE (1) COAST GUARD APPROVED CHILDS LIFE PRESERVER.
Condition: Unknown
Due 8 May 1991
Resolved 8 May 1991
Lifesaving
Issued 23 April 1990
Resolved
PROVIDE 5 ADULT LIFE JACKETS. TOTAL PERSONS ON BOARD LIMITED TO 31 UNTIL PROVIDED.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Accommodation/Occupational Safety
Issued 23 April 1990
Resolved
MODIFY RAILS IAW [name withheld] DATED 21 FEB 90.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Fire Fighting
Issued 23 April 1990
Resolved
PROVIDE HEAT DETECTION SYSTEM FOR GALLEY SPACE.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Lifesaving
Issued 23 April 1990
Resolved
PROVIDE EMERGENCY INSTRUCTIONS IAW 46 CFR 185.25-1.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Documentation
Issued 23 April 1990
Resolved
PROVE STABILITY FOR PROTECTED WATERS. COI WILL BE INVALIDATED IF THIS REQUIREMENT IS NOT CLEARED BY THE VESSELS LOT REINSPECTION.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Navigation
Issued 23 April 1990
Resolved
PROVIDE PROPER EQUIP FITTINGS FOR AIR RECEIVER FLEX HOSE CONNECTION.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990