Records from 2016 to 2026. Most recent: inspection, 15 January 2026.
Inspection history · 18
15 January 2026
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8296952
14 November 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8268200
5 February 2025
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8069488
17 January 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8065122
28 February 2024
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7871153
6 November 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7821000
8 March 2023
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7647701
3 December 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7601236
30 November 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7367934
16 December 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7112914
9 January 2020
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6885897
24 October 2019
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6841503
26 February 2019
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6632007
13 June 2018
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6443174
20 April 2018
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6395634
14 November 2017
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6306422
14 February 2017
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6087949
7 March 2016
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5828672
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 20 January 2026
Resolved
Fire extinguishing equipment installed on a vessel in excess of the requirements of §§ 181.400 and 181.500 must be designed, constructed, installed, and maintained in accordance with a recognized industry standard acceptable to the Commandant (CG-ENG-4). MI observed 02 inoperable smoke detectors in aft accommodation area and port crew space. Repair smoke detection within 14 days.
46 CFR 181.120
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 February 2026
Resolved 30 January 2026
Resolution: Reviewed objective evidence of detectors installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 February 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. MI identified raw water leak on generator. Repair prior to carriage of passengers.
46 CFR 183.200(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 March 2025
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 February 2025
Resolved
Rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Equivalent protection may include lifelines, wire rope, chains, and bulwarks, which provide strength and support equivalent to fixed rails. MI identified unsatisfactory railing adjacent to the operating station on the stbd side and damaged chain links adjacent to the operating station on the port side. Repair prior to the carriage of passengers.
46 CFR 177.900(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2025
Resolution: Received photographs of the repairs.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 February 2025
Resolved
Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal. FCC Radio Station Authorization expired 03JUN2024. Replace within 14 days.
47 CFR 80.25(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 February 2025
Resolution: Received FCC Radio Station to expire 14Feb2035.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 February 2025
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (2 1/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. MI identified 01 (2 1/2 gallon) fire bucket missing. Replace within 14 days.
46 CFR 181.610
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 February 2025
Resolution: Received photograph of three (2 and 1/2 gallon) fire buckets.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 February 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection and operation of all watertight closures in the hull, decks, and bulkheads. Identified hole in the stern of the vessel near the camera. Repair within 14 days.
46 CFR 176.802(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 February 2025
Resolution: Received photographs of the repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 February 2025
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Replace the hose clamps identified in port side engine room and secure the surrounding wires. Replace within 14 days.
46 CFR 182.410(d)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 February 2025
Resolved
All engines must be water cooled and meet the requirements of this paragraph. The engine head, block, and exhaust manifold must be water-jacketed and cooled by water from a pump that operates whenever the engine is operating. Raw water pump in engine room needs to be mounted properly. Repair within 14 days.
46 CFR 182.420(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 March 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 January 2025
Resolved
A Certificate of Inspection is valid for 5 years for all other vessels. Vessel's COI has expired - vessel must obtain a new COI prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 February 2025
Resolution: COI inspection complete.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 April 2024
Resolved
Gages to indicate engine cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as
to be in view of the operator.
Gages on the Fly Bridge helm station are obscured by grime making them unreadable to the master of the vessel.
46 CFR 182.20-5(b) (Old T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Vessel repaired gauge at flying bridge.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 16 April 2024
Resolved
A vessel of 12 meters (39 feet) or more in length shall be provided with a whistle... The whistle... shall comply with the specifications in Annex III to these Rules (33 CFR part 86).
Ship's whistle does not function.
33 CFR 83.33(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: vessel fixed ships whistle.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 16 April 2024
Resolved
All vessels shall be fitted with such ground tackle and hawsers... depending upon the size of the vessel, the waters on which it operates, and other operating hazards.
Starboard, forward cleat has damage. Operator to provide repair plan to USCG, prior to alterations, for approval.
46 CFR 184.10-1(a) (Old T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2024
Resolved 30 May 2024
Resolution: Vessel repaired stbd cleat.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 16 April 2024
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions.
Vessel's first-aid kits are expired.
46 CFR 184.710 (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Vessel updated first aid kits expired items
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 16 April 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an... man overboard drill be held under simulated emergency conditions specified by the inspector.
Vessel was unable to conduct MOB drill.
46 CFR 176.808(g) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Conducted MOB drill
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 16 April 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that a fire drill be held under simulated emergency conditions to be specified by the inspector.
Vessel was unable to conduct fire drill.
46 CFR 176.810(d)
46 CFR 176.810(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2024
Resolved 30 May 2024
Resolution: Conducted fire drill
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 April 2024
Resolved
An existing vessel with a hull, or a machinery space boundary bulkhead or deck, composed of wood or fiber reinforced plastic, or sheathed on the interior in fiber reinforced plastic, must comply with the requirements of § 181.400 of this part on or before March 11, 1999. The following spaces must be equipped with a fixed gas fire extinguishing system, in compliance with § 181.410, or other fixed fire extinguishing system specifically approved by the Commandant:(1) A space containing propulsion machinery.
Vessel fixed firefighting system is not in compliance with 181.410. Vessels current pressure switch does not secure the engines as required by 46 CFR 181.410(b)(10). Furthermore, the vessels pressure switch is located in the space which is prohibited by 46 CFR 181.410(b)(1)(i)(ii).
Vessel must submit plans to bring the installed fixed firefighting system in full compliance with 181.410. Plans are to be submitted to MSC w/in 30 days.
46 CFR 181.115(b)
46 CFR 181.400(a)
46 CFR 181.410
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2024
Resolved 18 July 2024
Resolution: Vessel madified supression system. See general information tab.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 29 February 2024
Resolved
Your vessel must undergo an annual inspection with the 3 months before or after each anniversary date. Vessel inspection was canceled after Coast Guard Marine Inspectors arrived to conduct inspections. Complete an annual inspection prior to carrying passengers.
46CFR176.500(b)(1)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 February 2024
Resolved 16 April 2024
Resolution: Completed an Annual Inspection 16APR, new deficiencies pending.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 March 2023
Resolved
It is further intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure, and personnel injury. Inspectors observed soft patches on both fuel pipelines, and witnessed slight leaking while the MDEs were running. Vessel must either: replace damaged piping to original, or replace with proper non-metallic flex hose and fittings, as authorized in 46 CFR 182.20-40.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2023
Resolved 10 April 2023
Resolution: Received pictures attesting to new non-metallic flex hose on fuel lines.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2019
Resolved
Vessel had expired Random Chemcial Testing Program Certificate of Enrollment. Supply updated random test results of crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2019
Resolved 1 March 2019
Resolution: Vessel recieved new certificate.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 15 May 2018
Resolved
vessel is to post and provide written procedures on how to fully and properly operate CO2 system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2018
Resolution: Vessel submitted written procedures and posted them on the bridge.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 15 May 2018
Resolved
vessel is to provide repair proposal on how vessel intends to bring fixed CO2 system in compliance with 46 CFR 181.400
Action required: 705 - Other - as specified
Due 15 June 2018
Resolved 16 July 2018
Resolution: Received proposal from operator. Def cleared, USCG review commenced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 15 May 2018
Resolved
wire connections throughout the vessel must be in watertight junction boxes.
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 22 May 2018
Resolution: Received pictures of proper installation.
Lifesaving › Lifebuoys › Serviceable
Issued 15 May 2018
Resolved
vessel is to provide new lifebuoy.
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 22 May 2018
Resolution: Received pictures of proper installation.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 20 April 2018
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel is outside scope of annual inspection window and shall complete required annual inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2018
Resolution: vessel completed 3rd annual inspection.
Fire Fighting › Fire Pumps › Power Source
Issued 14 February 2017
Resolved
Provide one hand fire pump on board.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 March 2017
Resolved 15 March 2017
Engineering › Bilge Water Management System › Pump
Issued 14 February 2017
Resolved
Provide one fixed power pump and one portable hand pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 March 2017
Resolved 15 March 2017
Fire Fighting › Fire Bucket › Availability
Issued 7 March 2016
Resolved
AF01- Obtain three 2 1/2 gallon fire buckets with lanyards long enough to reach the water. the words "FIRE BUCKET" must be stenciled on each.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2016
Documentation › Certificates/Documents › Certificate of Inspection
Issued 7 March 2016
Resolved
AF02- Post COI in common area.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 18 March 2016
Documentation › Markings/Placards › Lifejacket Placard
Issued 7 March 2016
Resolved
AF03- Post Lifejacket donning placard in common area.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 18 March 2016
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 7 March 2016
Resolved
AF04- Begin logging drills and crew training in new logbook.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 18 March 2016
Communications › Alarms/Indicators › Fire Alarm
Issued 7 March 2016
Resolved
AF05- Repair / replace smoke detectors.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 28 March 2016
Resolution: Received email from operator showing that they purchased and installed the correct smoke detectors.