Records from 2018 to 2026. Most recent: inspection, 25 March 2026.
Inspection history · 18
25 March 2026
PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8331659
11 March 2025
PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8091157
27 August 2024
PSC B
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7990038
27 February 2024
PSC B
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7870751
22 August 2023
PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7774108
13 February 2023
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7635601
8 November 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7591480
27 August 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7544589
9 August 2022
PSC A
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7528231
8 February 2022
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7391384
2 August 2021
PSC B · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7274923
11 February 2021
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7138851
1 February 2021
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7133346
28 July 2020
PSC B
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7013900
2 January 2020
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6881644
27 July 2019
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6765914
1 July 2019
Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6729306
28 December 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6603461
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 25 March 2026
Resolved
EACH LIFERAFT OR GROUP OF LIFERAFTS SHALL BE STOWED WITH A FLOATFREE ARRANGEMENT COMPLYING WITH THE REQUIREMENTS OF PARAGRAPH 4.1.6 OF THE CODE SO THAT EACH FLOATS FREE AND, IF INFLATABLE, INFLATES AUTOMATICALLY WHEN THE SHIP SINKS. DURING EXAM PSCO DISCOVERED 04 PAINTER LINES ON LIFERAFTS INCORRECTLY ASSEMBLED.
Action required: 10 - Deficiency Rectified
Due 25 March 2026
Resolved 25 March 2026
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 1 February 2021
Resolved
The liferaft painter system shall provide a connection between the ship and the liferaft. 3 liferafts' painters were not attached to the weaklink of the hydrostatic release units. (Port and starboard aft liferafts and starboard liferaft.) SOLAS 14 III/13.4.2
Action required: 10 - Deficiency Rectified
Due 1 February 2021
Resolved 1 February 2021
Resolution: Vessel connected the liferaft painters to the weaklink of the hydrostatic release units of 03 liferafts.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 1 February 2021
Resolved
The frequency of the tests and inspections required by this section must be for vessels, annually or as part of the biennial and mid-period inspections. Last hydrostatin testing on vessel bunkers lines completed 13 June 2019. Vessel shall conduct hydrostatic testing of all bunker lines prior to bunker operations in U.S. waters. 33CFR 156.170(F)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 February 2021
Resolved 11 February 2021
Resolution: MSD Lake Worth received report(see attached documents tab) from the company that included hydrostatic pressure testing reports for the MGO/HFO bunker lines carried out on 04FEB21. MSD Lake Worth has accepted this report and deficiency is rectified.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Operational procedures for engines or equipment
Issued 1 July 2019
Resolved
Ships using separate fuel oils to comply with paragraph 4 of this regulation of an emission control area shall carry written procedures showing how the fuel oil changeover is to be done, allowing sufficient time for the fuel oil service system to be flushed of all fuel oils exceeding the applicable sulfur content prior to entry into emission control area. The ship cold not produce technical specifications for burn rates for main engine, auxiliary equipment, and boiler, which would be used for determining sufficient time for systems to be flushed of all fuel oils exceeding applicable sulfur content.
MARPOL VI / 14.6
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 July 2019
Resolved 27 July 2019
Resolution: Received Class Report and Revised Procedures for Fuel Change out.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 1 July 2019
Resolved
Safe escape routes shall be provided. In the vessel's engine control room the emergency escape route did not have a means to prevent a crew member from falling through the escape opening.
74SOLAS(14)II-2/13.1.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 July 2019
Resolved 27 July 2019
Resolution: Received Class Report with Picture of RO Approved handrail around emergency exit.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 1 July 2019
Resolved
No discharge into the sea shall contain chemicals or other substances in quantities or concentrations which are hazardous to the marine environment or chemicals or there substances introduced for the purpose of circumventing the conditions of discharge specified n this regulation. The air conditioning condensation holding tank is equipped with an oil content meter and pump that is piped into the over board discharge which is shared with the oily water separator, in accordance with shipboard technical drawings. the crew could not provide procedures on how the operation would be logged for pumping overboard the condensation. The condensation tank had no sounding logs and crew could not accurately provide sounding.
MARPOL I / 15.8
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 July 2019
Resolved 27 July 2019
Resolution: Received Class Report and Revised IOPP Form A.