Records from 2018 to 2025. Most recent: inspection, 29 November 2025.
Inspection history · 20
29 November 2025
COC-CVE Annual · PSC A
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8273811
19 December 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8049271
30 November 2024
COC-CVE Annual · PSC A
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8040127
16 March 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7880167
16 March 2024
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7880171
14 December 2023
PSC A · COC-CVE Annual
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7838612
5 April 2023
COC-CVE Annual · PSC A
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7661980
14 December 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7609045
14 September 2022
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7559493
25 August 2022
Administrative Inspection
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7543196
3 August 2022
COC-CVE Annual · PSC B
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7518452
3 August 2022
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7523959
16 January 2022
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7381053
13 November 2021
Ballast Water Examination · PSC A · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7350291
6 April 2020
In-Service Inspection
Physical examination · USCG Southeast District (dpw) · USCG Southeast District (CGD-SE) · Activity 6936066
1 January 2020
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6880558
14 November 2019
NPV Safety Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6855370
13 November 2019
ISPS III Exam · Ballast Water Examination · COC-CVE Annual
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6854004
19 December 2018
Deficiency Check · COC-CVE Initial · Ballast Water Examination · ISPS II Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6600696
31 July 2018
COC-CVE Initial Prep · COC-CVE Initial
Administrative · Activities Europe · Activity 6496321
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
A corridor, lobby, or part of a corridor from which there is only one route of escape shall be prohibited. Outside of the spa treatment rooms, near the relaxation loinge, PSCO observed a dead end corridor. The escape route leading forward to the gym was locked and unable to be opened.
74 SOLAS (20) II-2/13.3.1.2
Code 16
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 December 2025
Resolved 29 November 2025
Resolution: Crew removed the lock allowing the door to open freely removing the dead end corridor.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300mm above the deck at all points of the escape route, including angles and intersections. the marking must enable passengers/crew to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. On open deck 10, PSCO observed signage erroneously indicating muster station access through the Tamerind Restaurant, incorrectly marking an escape rouote.
74 SOLAS (20) II-2/13.3.2.5.1
Code 16
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 December 2025
Resolved 12 December 2025
Resolution: Received class survey report attesting to correct escape route being marked and followed.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
Safe escape routes shall be provided. PSCO found an improperly categorized space arrangement on deck 12 forward in the Shore Excursion Office, without an acceptable arrangement where persons in this area are given immediate and clear notification of a fire in the surrounding space.
74 SOLAS (20) II-2/13.1.1
Cide 50
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 December 2025
Resolved 12 December 2025
Resolution: Received class survey report attesting to the placement of a detection notification system being installed in the Shore Excursion Office.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
Escape doors from public spaces that are normally latched shall be fitted with means of quick release. Such means shall consist of a door-latching mechanism incorporating a device that releases the latch upon the application of a force in th direction of escape flow. PSCO observed the door to the Crew Mess was equipped with a locking device that prevents the release of the latch when pressure is applied to the releasing.
74 SOLAS (20) II-2/13.3.2.6.2
Code 50
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 December 2025
Resolved 29 November 2025
Resolution: Crew removed the locking device.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
Escape doors from public spaces that are normally latched shall be fitted with means of quick release. Such means shall consist of a door-latching mechanism incorporating a device that releases the latch upon the application of a force in th direction of escape flow.PSCO observed a thumb latch on the door leading to the spa treatment rooms labeled and emergency exit.
74 SOLAS (20) II-2/13.3.2.6.2
Code 50
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 December 2025
Resolved 29 November 2025
Resolution: Crew removed thumb latch from the door.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 November 2025
Resolved
Undymmetrical flooding is to be kept to a minimum consistent with the efficient arrangements. Where it is necessary to correct large andles of heel, the means adopted shal, where practicable, be self-acting, but in any case where controlas to equalization device are provided they shall be operable from above the bulkhead deck of passenger ships and the free board deck of cargo ships. these fittings together with their controls shall be acceptable to the administration. PSCO observed the cross flooding devices were painted over not allowing water to activate the equalization decive as intended.
74 SOLAS (20) II-1/7-2.5
Code 50
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 December 2025
Resolved 19 December 2025
Resolution: Class report provided that removal of the paint to cross flooding was applied.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
The means of escape, including stairways and exits, shall be marked by lighting or photoluminescent strip indicators placed not more than 300mm above the deck at all points of the escape route, including angles and intersections. the marking must enable passengers/crew to identify the routes of escape and readily identify the escape exits. Additionally, escape route signs and fire equipment location markings shall be of photoluminescent material or marked by lighting. Wheelchairs blocking LL and escape route corridor outside of Stuyvesant room, Bulkhead deck inappropriate stowage of gangway equipment blocking LLL, Stowage of ping pong table in corridor outside of crew galley blocking LLL.
74 SOLAS (20) II-2/13.3.2.6.2
Code 10c
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Resolved 29 November 2025
Resolution: Objects were removed by crew to not block LLL and escape corridors.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 November 2025
Resolved
Escape doors from public speaces that are normally latched shall be fitted with a means of quick release. Such means shall consist of a door-latch upon the application of a force in the direction of escape flow. PSCO observed escape route doors in the theater on port and starboard sides with thumb latches installed.
74 SOLAS (20) II-2/13.3.2.6.2
Code 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 29 November 2025
Resolution: Thumb latch removed by crew.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 29 November 2025
Resolved
Where the contents and use of a space are such that there is a doubt as to its classification for the purpose of this regulation, or where it is possible to assign two or more classifications to a space, it shall be treated as a spece within the relevant category having the most stringent boundary requirements. PSCO observed A/C machinery space 04.3.1 7/3 had combustible materials stored inside.
74 SOLAS (20) II-2/9.2.2.3.2.2
Code 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 29 November 2025
Resolution: Crew removed combustible materials store inside the space.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 November 2025
Resolved
The construction of doors and door frames in "A" class divisions, with the means of securing them when closed, shall provide resistance to fire as well as to the passage of smoke and flame equivalent to that of the bulkhead in which the doors are situated. FSD 3.6.06, and FSD B.3.08 not able to close properly, compromising the fire boundary.
74 SOLAS (20) II-2/9.4.1.1.2
Code 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 29 November 2025
Resolution: Crew removed objects blocking the doors from closing properly.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 November 2025
Resolved
Fire doors in main vertical zone bulkheads, galley boundaries and stairway enclosures shall be self-closing and be capable of closing with an angle of inclination of up to 3.5 degrees opposing closure. PSCO observed the FSD 10.2.40 not latching closed.
74 SOLAS (20) II-2/9.4.1.1.5.1
Code 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 29 November 2025
Resolution: Crew adjusted the door to latch close.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 November 2025
Resolved
The construction of doors and door frames in "A" class divisions, with the means of securing them when closed, shall provide resistance to fire as well as to the passage of smoke and flame equivalent to that of the bulkheads in which the doors are situated. PSCO observed FSD A 2.99.1, FSD A 3.81, FSD A 2.104 blocked open due to excessive storage on bulkhead deck inhibiting the doors to close.
74 SOLAS (20) II-2/9.4.1.1.2
Code 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 29 November 2025
Resolution: objects were removed by crew allowing the door to close properly.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 30 November 2024
Resolved
Fire protection systems and fire fighting systems and appliances shall be maintained and ready for use. PSCO's observed 02 heat detectors (3.111 and 3.105) that did not activate with the application of heat.
74 SOLAS (20) II-2/14.1.1
17c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 November 2024
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 30 November 2024
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins.
The majority of of crew members at the life raft stations, with the exception of life raft teams 3 and 6, were unfamiliar with how to direct passengers to the correct muster station. Midship stairwell guide deck 6 was unfamiliar with how to properly use a fire extinguisher
74 SOLAS (20) III/19.2.1
50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2024
Resolved 19 December 2024
Resolution: Provided class doc- attached
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 November 2024
Resolved
The following functional requirements shall be met additional aids for escape shall provide as necessary to ensure accessibility , clear markings , and adequate design for emergency situations. Three locations of emergency exits were identified that lack clear markings. These locations were, the door that led into the Thermal Suites which leads to the hydro pool room, the door to the spinning room and studio 55 room which leads to the corridor.
74 SOLAS (20) 11-2/13.1.3
10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 30 November 2024
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 30 November 2024
Resolved
The following functional requirements shall be met escape routes shall be maintained in a safe condition, clear of obstacles. PSCO's observed three weather tight doors along an escape path that failed to open without the application of exceptional force due to the gasket sticking to the door frame. The doors are located on both port and starboard deck 6 as forward as you can go, and on deck 5 forward starboard. Similar doors on other decks /locations did open but not easily.
74 SOLAS (20) II-2/13.1.2
10 c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 30 November 2024
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 16 March 2024
Resolved
Main and auxiliary machinery essential for the propulsion and safety of the ship shall be provided with effective means for its operation and control. Vessel suffered reduced steering gear functionality with the port side azipod.
74 SOLAS (20) Ch. II-1 Reg. 31.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 March 2024
Resolution: Rectified.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 April 2023
Resolved
Cabin doors in "B" class divisions shall be of a self-closing type. Hold-back hooks are not permitted. Found hold back devices on 14 different "B" class doors, one of which is broken and inoperable unless a key is used. 74SOLAS 20 II-2/9.4.1.2.2
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2023
Resolved 8 April 2023
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 November 2021
Resolved
Escape doors from public spaces that are normally latched shall be fitted with a means of quick release. Such means shall consist of a door-latching mechanism incorporating a device that releases the latch upon the application of a force in the direction of escape flow. Quick release mechanisms shall be designed and installed to the satisfaction of the Administration and, in particular: not be equipped with any locking device, set screw or other arrangement that prevents the release of the latch when pressure is applied to the releasing device. PSCO observed a double leafed glass door located in the deck 12 Crows Nest, port side, that has a mechanical locking mechanism on one leaf that does not allow for the quick release of the door. SOLAS 20 II-2/13.3.2.6.2.3 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 November 2021
Resolved 14 November 2021
Resolution: Vessel’s crew removed the double leafed glass doors before PSCOs departed the vessel. Deficiency cleared. 10c.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 November 2021
Resolved
Means of escape from control stations, accommodation spaces and service spaces. The following functional requirements shall be met: escape routes shall be maintained in a safe condition, clear of obstacles. Aft Crew elevator corridors on decks 6 and 7 have secured metal food carts restricting the width of the associated escape routes. Additionally, PSCO observed the emergency exit from the hair saloon to the corridor obstructed with multiple chairs. SOLAS 20 II-2/13.1.2 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 November 2021
Resolution: The metal food carts were removed from the corridor and the chairs blocking the emergency exit from the hair salon were removed before PSCOs departed the vessel. Deficiency cleared 10c.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 November 2021
Resolved
Fire doors in the main vertical zone bulkheads, galley boundaries and stairway enclosures other than power-operated watertight doors and those which are normally locked shall satisfy the following requirements: the doors shall be self-closing and be capable of closing with an angle of inclination of up to 3.5 degrees opposing closure. Fire door 7.5.07 does not fully self close. SOLAS 20 II-2/9.4.1.1.5.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 November 2021
Resolution: Fire door 7.5.07 was adjusted and tested satisfactory, fully self closing before PSCOs departed vessel. Deficiency cleared 10c.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 14 November 2019
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Liferaft station #8 personnel were not familiar with their duties and were unable to launch the liferafts during the abandon ship drill. SOLAS 2014 Ch III 19.2.1 - 10c
Action required: 10 - Deficiency Rectified
Due 14 November 2019
Resolved 14 November 2019
Resolution: Deficiency Rectified Prior Teams to Departure.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 13 November 2019
Resolved
Each ballast water management system manufactured under Coast Guard approval must have a nameplate which is securely fastened to the BSTS. No nameplate could be provided by the crew. The manual onboard was also outdated. 46 CFR 162.060-22
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 December 2019
Resolved 1 January 2020
Resolution: Placed a proper Coast Guard approval nameplate on the BWTS. Also, sent a copy of the first page of the updated BWTS User Manual.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 November 2019
Resolved
Escape routes shall be maintained in a safe condition, clear of obstacles, the PSCO found the following. In the main laundry access to the aft vertical escape route was blocked by a table and linen cars located in front of the sheet press machine. 02 linen carts were stored under stairs leading to deck B , in way of watertight door C-2. Area was marked with 02 signs "Escape Route Do Not Obstruct" and No Storage Allowed in this Area". SOLAS (14) II-2/31.1
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 13 November 2019
Resolved 13 November 2019
Resolution: Table and carts moved by sheet press machine. Linen carts removed from stairway.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 December 2018
Resolved
LOCKERS OF NON-COMBUSTIBLE MATERIALS PROVIDING STORAGE FOR NON-HAZARDOUS SAFETY EQUIPMENT REQUIRED BY THESE REGULATIONS MAY BE PERMITTED. WHEELCHAIRS INTENDED FOR EMERGENCY USE ARE STOWED ON EVERY LANDING OF EVERY CREW STAIRCASE AND ARE NOT STOWED IN LOCKERS AS DESCRIBED ABOVE. 74 SOLAS (14 CONS) II-2/5.3.3 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 January 2019
Resolved 30 January 2019
Resolution: Wheelchairs were relocated to alternate areas that were not in stairways.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 20 December 2018
Resolved
EVERY CREW MEMBER WITH ASSIGNED EMERGENCY DUTIES SHALL BE FAMILAIR WITH THESE DUTIES BEFORE THE VOYAGE BEGINS. CREW'S KNOWLEDGE OF LIFEBOAT EQUIPMENT ON LIFEBOAT #14 AND 18 WAS INSUFFICIENT AND CREW'S KNOWLEDGE OF LIFERAFT DAVITS AT LIFERAFT #8 AND 10 WAS INSUFFICIENT. 74 SOLAS (14 CONS) III/19.2.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 January 2019
Resolved 15 January 2019
Resolution: Received report verifying training.