Records from 2018 to 2026. Most recent: inspection, 15 May 2026.
Documentation record
Tonnage as PSIX records it84940 - Simplified, Net Ton
144927 - Convention (Subpart B), Gross Ton
145164 - Dead Weight, Ton
46115 - Convention (Subpart B), Net Ton
143179 - Simplified, Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Inspection history · 11
15 May 2026
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8373693
3 October 2025
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8245985
5 May 2025
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8128878
23 November 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8038923
23 November 2024
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8099204
22 May 2024
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7916926
20 October 2022
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7579456
21 April 2021
PSC B · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7179183
16 October 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6833560
11 October 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6832690
18 September 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6542868
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2026
Resolved
A fuel System schematic/piping and instrumentation diagram (P&ID) should be reproduced and permanently displayed in the ship's bunker control station and at the bunker station. PSCO observed P&ID not permanently displayed in the ship's bunker control station and at the bunker station. 74 SOLAS (20) II-1/57; IGF Code (2016); MSC.1/Circ. 1621 17.4.2.2
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2026
Resolved 27 May 2026
Resolution: Vessel provided 03 pictures attesting proof of P&ID installed on Port Bunker Station, Stbd Bunker Station, and Engine Control Room Station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2026
Resolved
If the fuel supply is shut off due to activation of an automatic valve, the fuel supply should not be opened until the reason for the disconnection is ascertained and the necessary precautions taken. A readily visible notice giving instruction to this effect should be placed at the operating station for the shut-off valves in the fuel supply lines. PSCO observed this notice not present at the operating station for the shut-off valves in the fuel supply lines. 74 SOLAS (20) II-1/57; IGF Code (2016); MSC.1/Circ. 1621 15.10.1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2026
Resolved 15 May 2026
Resolution: Notice was placed at the operating station for the shut-off valves in the fuel supply lines to the satisfaction of PSCO prior to the conclusion of the exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2026
Resolved
A caution placard or signboard should be permanently fitted in the machinery space containing methyl/ethyl-fueled engines stating that heavy lifting, implying danger of damage to the fuel pipes, should not be done when the engine(s) is running on methyl/ethyl. PSCO observed this caution placard or signboard not permanently fitted in the machinery space containing methyl/ethyl-fueled engines. 74 SOLAS (20) II-1/57; IGF Code (2016); MSC.1/Circ. 1621 15.10.3
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2026
Resolved 15 May 2026
Resolution: Caution placard or signboard permanently fitted in the machinery space containing methyl/ethyl-fueled engines to the satisfaction of PSCO prior to the conclusion of the exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 November 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship and persons on board. PSCO received a report of a propulsion malfunction due to a seized start air valve blocking air flow to the M/E.
74SOLAS(20)I/11(a)
60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 November 2024
Resolution: start air control valve unit was found rusted. Crew cleaned/overhauled unit, reinstalled, and tested M/E ahead and astern satisfactorily.