Records from 2018 to 2026. Most recent: inspection, 10 August 2026.
Inspection history · 16
10 August 2026
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8456592
8 June 2026
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8394851
4 August 2025
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8202819
7 April 2025
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 8115254
16 May 2024
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7900245
30 January 2024
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7860368
10 January 2024
Damage Survey
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7848037
3 October 2023
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7803821
17 August 2023
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7770733
31 March 2023
Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7660666
22 August 2022
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7540477
19 August 2021
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7291625
9 March 2021
Drydock Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7152834
26 March 2020
DAPI Audit · Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6932186
23 May 2019
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6688760
25 September 2018
Internal Structural Exam · Construction Oversight · Administrative Inspection · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6630588
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 August 2025
Resolved
Port and stbd fuel tank bonding wires were disconnected due to corrosion.
46 CFR 182.440
Action required: 10 - Deficiency Rectified
Resolved 4 August 2025
Resolution: Verified satisfactory bonding wire replacements.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 4 August 2025
Resolved
Bilge high level alarm lights were not operational at the operating station for the following indicators:
Stbd 1
Stbd 2
Stbd 4
Port 4
46 CFR 182.530
Action required: 10 - Deficiency Rectified
Resolved 4 August 2025
Resolution: Verified all bilge visual and audible indictaors operational.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 May 2024
Resolved
A vessel not required to have a power driven fire pump must have at least three 2.5 gallon buckets with lanyards and words "FIRE BUCKET" labeled on them.
Vessel missing 2 of the 3 required fire buckets.
46 CFR 181.610
Action required: 10 - Deficiency Rectified
Due 30 May 2024
Resolved 16 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 May 2024
Resolved
On a vessel of at least 26 ft length, a visual and audible alarm must be provided at the op station to indicate a high water level in each of the following spaces.
Stbd #3 and #4 audible/visual indicators inoperable. Repair/replace indicators for reinspection.
46 CFR 182.530
Action required: 10 - Deficiency Rectified
Due 30 May 2024
Resolved 16 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 January 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. The OCMI may require an inspection and testing whenever a repair or alteration is undertaken.
HARBOR HOPPER 2 suffered a mechanical loss of propulsion of both engines and suffered an explosion of the port side battery. Determine the cause of the mechanical failure, complete all necessary repairs, provide a report addressing the scope of work completed and provide any associated invoices/ receipts. Upon receipt of these documents, marine inspectors will schedule a follow-up exam to conduct sea trials on the HARBOR HOPPER 2.
46 CFR 176.700(a)
46 CFR 176.700(d)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 February 2024
Resolution: Satisfactory repowering of engines.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 August 2023
Resolved
A vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required.
(1) Each floating waterlight must be approved in accordance with § 161.010 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.110.
Battery not installed in new floating light.
46 CFR 180.70
Action required: 10 - Deficiency Rectified
Due 17 August 2023
Resolved 17 August 2023
Resolution: Verified new battery installation of floating light and operational readiness.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 August 2023
Resolved
Oceans, coastwise, limited coastwise, and Great Lakes routes. A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry -
(1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and
(2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant.
Vessel missing 6 flares.
46 CFR 180.68
Action required: 10 - Deficiency Rectified
Due 17 August 2023
Resolved 17 August 2023
Resolution: Verified 06 new flares have been equipped on the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 August 2022
Resolved
On a vessel of at least 26 feet in length a visual and audible alarm must be provided at the operating station to indicate a high level alarm. Attending MI's noted that the starboard aft and second void from the bow on the starboard side had inoperable bilge high level alarms. Same compartments had inoperable bilge pumps. Prior to operations all bilge alarms shall be functional.46CFR182.530
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 22 August 2022
Resolved 22 August 2022
Resolution: Attended vessel @ 1600 and witnessed bilge alarm operation after a fuse was changed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 22 August 2022
Resolved
A catamaran vessel must have bilge pumps for each hull. The bilge pumps for the starboard hull did not work. Prior to operations all bilge pumps shall be functional. Attending MI's witnessed succesful operation of 6 of 8 installed bilge pumps. 46CFR182.520
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 22 August 2022
Resolved 22 August 2022
Resolution: MI's attended the vessel at 1600 on the day of the detention to witness successful operation of the installed bilge pumps.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 August 2022
Resolved
Flexible non metallic hoses must be complete with factory-assembled end fittings requiring no further adjustments of the fittings on the hose, and must comply with SAE J-1942. Attending MI's noted that the fuel supply hoses for both outboard engines are badly dry rotted and showing signs of rusting. Replace both hoses prior to the carriage of passengers. 46CFR182.720 (e)(1)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 August 2022
Resolved 22 August 2022
Resolution: Attended vessel and observed two renewed fuel lines.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 August 2022
Resolved
A vessel of 26 feet in length but not more than 65 feet, must carry a minimum of one life buoy or not less than 24". Attending MI noted that the grab line on the life buoy was wasted and missing. Replace the life buoy with a new USCG approved 24" diameter model. 46CFR180.7
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 August 2022
Resolved 24 August 2022
Resolution: Attended the vessel and observed a new CG approved lifering in place.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 22 August 2022
Resolved
At each initial and subsequent inspection for certification the owner or managing operator shall be prepared to test the steering systems of the vessel. Attending MI's noted that there was orange tape over a portion of the hydraulic hose to the port outboard engine. Remove tape to inspect the hose and replace hose if needed. 46CFR176.814
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 August 2022
Resolved 24 August 2022
Resolution: Attended vessel and observed a newly replaced hose on the steering hydraulic line.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 22 August 2022
Resolved
A fire hose with a nozzle must be attached to each fire hydrant at all times. Attending MI noted that the installed fire hose was weeping through the cloth. Replace hose with one of a good quality that will not leak. Old fire hose is to be destroyed. 46CFR181.320
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 September 2022
Resolved 29 August 2022
Resolution: The owners do not want to fix the firepump discharge pressure and additionally do not want to replace the defective fire hose. MSD ST. Thoms notified [name withheld] that passenger count on both HARBOR HOPPER I and HARBOR HOPPER II will be reduced to <49.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 August 2022
Resolved
46CFR181.300 (a) A self priming power driven fire pump must be installed on each vessel (ii) of not more than 65 feet in length that carries more than 49 passengers. Attending MI's on the Annual inspection on 23 June 2022 noted that only one of the two "Alternative Approved Fire Pumps" was providing pressure reducing overall output pressure by 50%.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 August 2022
Resolved 29 August 2022
Resolution: The owners do not want to fix the firepump discharge pressure and additionally do not want to replace the defective fire hose. MSD ST. Thoms notified [name withheld] that passenger count both HARBOR HOPPER I and HARBOR HOPPER II will be reduced to <49.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 August 2021
Resolved
Portable hand bilge pump would not take suction. Repair or replace portable hand bilge pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2021
Resolved 22 August 2022
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 9 March 2021
Resolved
At each initial and subsequent inspection for certification the owner or managing operator shall be prepared to test the steering systems of the vessel and make them available for inspection to the extent necessary to determine that they are in suitable condition and fit for the service intended.
Port engine hydraulic steering hose incurred friction damage rendering the hose unfit for service.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 March 2021
Resolved 1 April 2021
Resolution: Verified replacement of hydraulic steering hose.