MAURY USCG vessel records
← All vessels

PROFESSOR

PROFESSOR is a 2018 passenger vessel (inspected). The Coast Guard has recorded 8 inspections since 2019, most recently in May 2025, along with 11 deficiencies.

Records from 2019 to 2025. Most recent: inspection, 13 May 2025.

Built
2018
Last inspected
13 May 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 May 2025
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2019–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

1537261
Flag
UNITED STATES
Maury page id
psix-1537261

Documentation record

Registered dimensions (L × B × D)33.0 ft × 11.0 ft × 5.9 ft
Registered tonnagegross 14 / net 14
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderARMSTRONG CONSOLIDATED LLC · PORT TOWNSEND, WA, UNITED STATES · built 2018
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationMonohull
Hailing portZEPHER COVE, NV
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 29 September 2025 · expires 31 October 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Simplified, Gross Ton
14 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 8

13 May 2025 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8140927
14 May 2024 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7909643
28 June 2023 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7725934
18 May 2023 Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7685929
4 May 2022 Internal Structural Exam · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7437772
18 March 2021 Drydock Exam · Initial Certification · Deficiency Check · Simplified Stability Test
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7153950
11 December 2020 Plan Review "T" Boat · Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7110398
10 May 2019 Plan Review "T" Boat · Administrative Inspection · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6681500

Deficiency record · 11

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 May 2025 Resolved
All wire and cable must be installed with metal supports not more than 24" apart. Cabling in aft compartment under deck not supported with metal supports. 46 CFR 183.340(a)(4).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2025
Resolved 5 June 2025
Resolution: Operator sent photos of new wire support installation. Photos uploaded to docuemnts.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 May 2025 Resolved
A vessel over 26' must carry a minimum of one life buoy of not less than 24" in diameter. 46 CFR 180.70(a)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2025
Resolved 14 June 2025
Resolution: Operator sent photos of 24" ring buoy installed onboard. Photo added to documents.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 14 May 2024 Resolved
Each survival craft must be secured to the vessel with a float-free link permanently attached to the vessel. Vessel's hydrostatic release unit is not permanently affixed to the vessel. 46 CFR 180.130(a)(1)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2024
Resolution: Deficiency rectified on the spot, however, it was a no-sail deficiency.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 May 2024 Resolved
The owner or managing operator must provide satisfactory evidence of required fire protection servicing to the marine inspector. Vessel must provide annual fire servicing report to marine inspectors. 46 CFR 176.810(b)(iv)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 27 June 2024
Resolution: Received and reviewed fire servicing report
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 May 2024 Resolved
Each ring life buoy must be marked with type II retroreflective material. Vessel's life buoy is missing retroreflective material. 46 CFR 185.604(h)(i)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 29 May 2024
Resolution: Received photos of retroreflective material on life buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 14 May 2024 Resolved
A vessel on lakes route must carry 03 handheld flare signals approved in accordance with 46 CFR 160.021 and 03 hand orange smoke distress signals in accordance with 46 CFR 160.037. Vessel did not carry approved distress signals. 46 CFR 180.68 (b)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 29 May 2024
Resolution: Received photos of valid distress signals.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 May 2023 Resolved
Each floating waterlight installed after March 11, 1997, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip. The vessel was missing a corrosion-resistant clip for the vessel's ring buoy. 46 CFR 180.70(d)(1)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 18 May 2023
Resolution: Fixed during the inspection.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 March 2021 Resolved
An enclosed space containing machinery powered by gasoline or other fuels having a flash point of 43.3 °C (110 °F) or lower must be equipped with a flammable vapor detection device in compliance with §182.480. Vessel did not have vapor detection in the fuel tank space. Install vapor detection. 46CFR182.410(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2021
Resolution: Operator installed vapor detection system in fuel tank space.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 March 2021 Resolved
A space containing a fuel tank for gasoline or any other fuel having a flash point of 43.3 °C (110 °F) or lower must be equipped with a fixed gas fire extinguishing system, in compliance with §181.410
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2021
Resolution: Verified installation of fire extinguishing system in fuel tank space.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2021 Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. Vessel's shutoff valve arrangement created potential hazard in the event of an outboard engine fire as the valves were within close proximity. Install remote shutoff system. 46CFR182.455(b)(4)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2021
Resolution: Operator installed remote fuel shutoff pull cables at the fuel tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 March 2021 Resolved
A propulsion engine control system, including pilothouse control, must be designed so that a loss of power to the control system does not result in an increase in shaft speed or propeller pitch. Operator is required to submit DVTP to MSC for approval. 46CFR184.620(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2021
Resolution: Attended vessel to verify DVTP. All sat.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.