MAURY USCG vessel records
← All vessels

GOLDBELT SEAWOLF

GOLDBELT SEAWOLF is a 2019 passenger vessel (inspected). The Coast Guard has recorded 21 inspections since 2018, most recently in October 2025, along with 41 deficiencies.

Records from 2018 to 2025. Most recent: inspection, 22 October 2025.

Built
2019
Last inspected
22 October 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 22 October 2025
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2018–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL2359
1537293
Flag
UNITED STATES
Maury page id
psix-1537293

Documentation record

Registered dimensions (L × B × D)70.7 ft × 25.0 ft × 7.8 ft
Registered tonnagegross 92 / net 73
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBAY WELDING SERVICES INC. · HOMER, AK, UNITED STATES · built 2019
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portJUNEAU, AK
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 11 May 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it92 - Simplified, Gross Ton
73 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 21

22 October 2025 Examination of Repairs · Deficiency Check · Hull Examination · Vessel Attendance · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8257417
23 September 2025 Internal Structural Exam · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8239664
19 December 2024 Deficiency Check · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8049487
9 October 2024 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8016804
8 October 2024 COI Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8016174
3 October 2024 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8014106
7 December 2023 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7834800
11 October 2023 Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7809640
21 November 2022 Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7587143
1 October 2022 Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7567628
12 January 2022 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7379326
16 December 2021 Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7363573
20 September 2021 Administrative Inspection · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7313767
15 September 2021 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7313994
22 September 2020 Internal Structural Exam · Hull Examination · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7062554
19 August 2020 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7057843
29 July 2020 Administrative Inspection · Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7019520
22 January 2020 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6894012
17 January 2020 Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6891583
30 September 2019 Deficiency Check · Initial Certification · Administrative Inspection · Plan Review "T" Boat
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6825487
1 November 2018 Administrative Inspection · Plan Review "T" Boat · Deadweight Survey · Construction Oversight · Initial Certification
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6626736

Deficiency record · 41

07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 September 2025 Resolved
A pre-engineered fixed gas fire extinguishing system must be in compliance with § 181.420 of this part and may only be installed in a normally unoccupied machinery space... with a gross volume of not more than 57 cubic meters (2,000 cubic feet). Port and stbd engine room ventilation outlet duct system is not completely separated at the top portion of duct system located on upper deck. This allows for fire extinguishing agent to enter either engine room, affecting effectiveness of fire suppression agent. Additionally, 02 dampeners located at the end of the duct system do not close simultaneously upon activation of pre-engineered fire suppression system, allowing for fire extinguishing agent to escape to atmosphere, and making the agent less effective in the event of a fire. Following stipulations apply for temp repair: 1) Provide temporary repair plan 2) Monitor and log temp repair on weekly basis 3) Report and failure to temp rapier to CG
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 October 2025
Resolution: A permamanent partition was added which segregated the ventillation duct into to seperate ducts.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 September 2025 Resolved
A pre-engineered fixed gas fire extinguishing system must be in compliance with § 181.420 of this part and may only be installed in a normally unoccupied machinery space... with a gross volume of not more than 2,000 cubic feet. Boiler space ventilation closure flap on entrance door, does not close fully, allowing for fire extinguishing agent to escape to atmosphere.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 September 2025
Resolution: Ventillation closure was adjusted and closes properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 September 2025 Resolved
All engines must have at least two means for stopping the engine(s) under any operating conditions. The fuel oil shutoff required at the engine by § 182.455(b)(4) will satisfy one means of stopping the engine. Fuel shutoff ball valves for stbd engines and generator do not close completely.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 September 2025
Resolution: Fuel shutoff valve was adjusted and fully closes.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 September 2025 Resolved
Number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided. Vessel is missing 01 child life jackets. Vessel maximum passengers requiring child life jackets (90 lbs or less)is reduced to 12.
Action required: 705 - Other - as specified
Resolved 25 September 2025
Resolution: 01 child size life jacket was added onboard.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2025 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection. Crack identified on shaft support leg mount for engine #4. Make permanent repairs to original.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 October 2025
Resolution: Crack was repaired.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2025 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection. 02 cracks identified on fwd bottom stinger, located in fwd void ivo transverse frame. Make permanent repairs to original.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 October 2025
Resolution: Identified cracks were repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 September 2025 Resolved
Piping used in a vital system must: (1) Be composed of ferrous materials except when: (i) Nonmetallic piping materials are permitted by § 182.720... (Rigid nonmetallic materials (plastic) may be used only non-vital systems. Exhaust cooling water from from all engines has section (flow sensor) of piping that is constructed of rigid nonmetallic plastic. Provide repair plan and make permanent repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 October 2025
Resolution: Plastic piping was replaced with aluminum piping.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 October 2024 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Standards for Marine Navigation Lights,” or other standard specified by the Commandant. STBD Nav light inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 November 2024
Resolution: Rectified to the satisfaction of the Coast Guard
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 October 2024 Resolved
A pre-engineered fixed gas fire extinguishing system must:(3) Automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. Boiler space has a small vent that cannot be secured. Request a proposal on how to secure ventilation to satisfaction of USCG MI.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 November 2024
Resolution: Rectified to the satisfaction of the Coast Guard
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 21 October 2024 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from fire or machinery failure. STBD oil pressure sensor on jet drive is being supported by zip ties. Repair to satisfaction of USCG.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 November 2024
Resolution: Received picture of deficiency rectified.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 October 2024 Resolved
A vessel to which this subchapter applies may not be operated without having on board a valid U.S. Coast Guard Certificate of Inspection. Vessel was found with a expired COI. 46 CFR 176.100
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 October 2024
Resolution: COI was renewed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 December 2023 Resolved
07110 - Spanner wrenches must be provided where a 40 millimeter (1.5 inch) diameter firehose is required. Fire hose station does not have a spanner wrench. 46CFR181.310
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 December 2024
Resolved 1 January 2024
Resolution: Spanner wrench added to fire station.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 7 December 2023 Resolved
04116 - On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions. Aft PA speaker is not operational. 46CFR184.602
Due 14 December 2023
Resolved 28 October 2025
Resolution: Aft PA speaker was replaced and tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2023 Resolved
03103 - Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Port aft engine lagging is compromised. 46CFR177.970
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 December 2023
Resolved 1 January 2024
Resolution: Lagging installed to exposed piping area.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 7 December 2023 Resolved
01326 - When, in accordance with § 178.210 of this chapter, a vessel must be provided with a stability letter, the stability letter must be posted under glass or other suitable transparent material, such that all pages are visible, at the operating station of the vessel. Onboard stability letter is missing page 1. 46CFR178.210
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 December 2023
Resolved 1 January 2024
Resolution: Operator provided evidence of having entire stability letter onboard vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 December 2023 Resolved
01199 - The Certificate of Inspection and any SOLAS Certificates must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers…Posted COI is not the most up to date. 46CFR176.302
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 December 2023
Resolved 1 January 2024
Resolution: Updated COI is posted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2022 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Properly repair the jacket water leak on the starboard outboard engine to the satisfaction of the attending CG Marine Inspector. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2022
Resolved 11 January 2023
Resolution: Owners mechanics replaced faulty o ring seals and tested engine - all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 November 2022 Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. Found flammable liquids and aerosols in the vessels tool storage room located amidships on the main deck. Remove all combustibles from the vessel or provide an approved flammable storage cabinet onboard within 48 hours. 46 CFR 176.830
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 November 2022
Resolved 22 November 2022
Resolution: Vessel rep stated that the flammables were removed from the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 16 December 2021 Resolved
Each survival craft must be secured to the vessel by a painter with a float free link permanently attached to the vessel and stowed so that when the vessel sinks the survival craft floats free and if inflatable, inflates automatically. The starboard IBA painter line was not connected to hydrostatic releases week link. Install Starboard IBA painter line to the week link on the hydrostatic release unit. 46 CFR 180.130.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 December 2021
Resolved 16 December 2021
Resolution: Crew corrected the painter line by attaching it to the week link.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 16 December 2021 Resolved
EPIRB must be installed to automatically float free and activate if the vessel sinks. Vessel hydrostatic release was expired. Replace Hydrostatic release. 46 CFR 180.64.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 December 2021
Resolved 16 December 2021
Resolution: Operator replaced hydrostatic release with new one.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 December 2021 Resolved
Each ring life buoy must be marked in clearly legible block capital letters with the vessels name. Two of the three ring life buoys name had faded away. Properly stencil vessels name onto the ring life buoys. 46 CFR 185.604(b).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2021
Resolved 16 December 2021
Resolution: Crew re-stenciled vessels name onto the two ring life buoys.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 16 December 2021 Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation (COD) currently in effect for that vessel. Vessel had onboard a photo copy of the current COD. Keep the original COD onboard the vessel. 46 CFR 67.313.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2021
Resolved 12 January 2022
Resolution: Operator placed the original COD onboard the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 16 December 2021 Resolved
A vessel must carry adequate and up to date, US COAST PILOT, extracts from the publication may be provided instead of the the complete publication. 46 CFR 184.420.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2021
Resolved 12 January 2022
Resolution: Owner placed an up to date US Coast Pilot on the bridge.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 22 September 2020 Resolved
Provide update charts for area of operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2020
Resolved 14 October 2020
Resolution: vessel has new charts onboard
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 September 2020 Resolved
Remove all waste baskets constructed of combustible materials. 2 bridge 1 starboard galley.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2020
Resolved 14 October 2020
Resolution: vessel has removed plactic trash cans.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 September 2020 Resolved
Prove fire pump produces 60 PSI at fire pump
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2020
Resolved 6 November 2020
Resolution: vessel has changed out fire nozzles with new onnes pump is producing 60-62 PSI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Remove Blade fuses and install cartridge type that are listed by Underwriters Laboratories or another independent laboratory recognized by the Commandant in engine room both port and starboard side. Both fuses are not include in the drawing 18012-96-01 REV C page 3
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 April 2020
Resolution: Vessel has installed UL listed inline fuses
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Wire port propulsion control wire run in engine room as per drawing 18012-96-01 REV C. Page 3
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Add 400 A fuse in engine room emerg. Start cross tie 2/0 wire as per drawing 18012-96-01 REV C page 3
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install 200A fuse and holder in port engine room for emerg. Main DC power as per Drawing 18012-96-01 REV C. Page 3
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Wire Starboard propulsion control wire run in engine room as per drawing 18012-96-01 REV C. Page 3
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Wire port side generator battery charging wire as per drawing 18012-96-01 REV C. Page 4
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install 350A fuse and holder for both port and starboard emerg. Start X-tie wire as per 18012-96-01 REV C. Page 4
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install 400A fuse in fuse holder for the port to starboard emerg. Start x-tie as per 18012-96-01 REV C. Page 4
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install correct size 200A fuse at main deck batteries as per drawing 18012-96-01 REV C. Page 5
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install 200A fuse, fuse holder and wire 65’ of 0/2 cable from main deck to house power ACR as per drawing 18012-96-01 REV C. Page 5
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 April 2020
Resolution: Approved electrical plan 18012-96-01 rev D reflect install on vessel, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Update drawing or install as per drawing 18012-96-01 REV C. Page 5 for the fuse installed in the wheelhouse battery cable and cable size
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 April 2020
Resolution: Approved electrical plan 18012-96-01 rev D reflect install on vessel, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install const hot DC panel cable as per drawing 18012-96-01 REV C. Page 5
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 November 2019
Resolution: wired as per drawing, all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Update drawing or install as per drawing 18012-96-01 REV C. Page 8 for the fuse installed in the port ignition 24 VDC panel No. 7
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 April 2020
Resolution: Approved electrical plan 18012-96-01 rev D reflect install on vessel, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2019 Resolved
Install correct size wire from breaker #4 on both the port and starboard propulsion control to both port and starboard Ignition 24VDC panel on the bridge as per drawing 18012-96-01 REV C. Page 8
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 April 2020
Resolution: Approved electrical plan 18012-96-01 rev D reflect install on vessel, all sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 September 2019 Resolved
Prove boiler secures upon discharge of pre-engineered fire suppression system for the boiler space before using boiler with passengers onboard.
Action required: 705 - Other - as specified
Resolved 19 November 2019
Resolution: Vessel has wired the pre-engineered fire suppression system to secure the boiler on discharge, tested all sat

Ownership record