Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it33325 - Convention (Subpart B), Net Ton 109999 - Dead Weight, Metric Ton 129230 - Displacement, Metric Ton 62632 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 2
22 March 2026PSC B · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8327922
13 November 2019ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6854535
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 March 2026Resolved
In tankers, electrical equipment, cables, and wiring shall notbe installed in hazardous locations unless it conforms with the standards not inferior to those acceptable to the Organization. PSCO observed all bonding straps on overfill devices deterated.
SOLAS 11-1/ 45.11
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 22 March 2026
Resolution: PSC NOLA received a class report from KR satisfying the requirement.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 March 2026Resolved
Each vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter diameter and is at least 25.4 millimeter long.PSCO observed VCS flange installed on the STBD VCS manifold missing stud. Correct VCS stud must be installed before cargo operations.
46 CFR 39.2001(J)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 22 March 2026
Resolution: PSC NOLA received a class report from KR satisfying the requirement.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.