MAURY USCG vessel records
← All vessels

GAS HARALAMBOS

GAS HARALAMBOS is a 2007 tank ship. The Coast Guard has recorded 5 inspections since 2021, most recently in November 2022, along with 4 deficiencies and 1 operational control.

Records from 2021 to 2022. Most recent: operational control imposed, 5 November 2022.

Built
2007
Last inspected
5 November 2022
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 5 November 2022
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 2 calendar years (2021–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9423126
1541942
Flag
BAHAMAS, THE
Maury page id
psix-1541942

Documentation record

Tonnage as PSIX records it10984 - Displacement, Metric Ton
7330 - Dead Weight, Metric Ton
5806 - Convention (Subpart B), Gross Ton
1945 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 5

5 November 2022 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7589576
11 July 2022 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7503701
6 June 2022 COC-GAS Annual · PSC B
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7466143
6 June 2022 Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7471937
3 June 2021 PSC A · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7213230

Deficiency record · 4

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 June 2022 Resolved
The condition of the ship and its equipment should be maintained to confrom with the provisions of the code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons onboard. Cargo leak on #1 cargo tank MARV (aft most MARV).
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 6 June 2022
Resolved 11 July 2022
Resolution: Received Class report attesting to the repairs of the leaking MARV and attended vessel to confirm.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 6 June 2022 Resolved
Emergency shutdown valves in liquid piping should fully close under all service conditions with 30 seconds of actuation. Port side emergency shutdown valve took more than 30 seconds to close.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 6 June 2022
Resolved 11 July 2022
Resolution: Received Class report attesting to the reapirs of Emergency Shutdown and attended vessel to confirm.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 June 2022 Resolved
All gasketed piping joints and hose connections should be electrically bonded. Pipe joints throughout deck missing bonding. Pipe joints throughout deck missing bonding.
Action required: 10 - Deficiency Rectified
Due 6 June 2022
Resolved 6 June 2022
Resolution: Corrected on the spot
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 June 2022 Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products. Light fixture in compressor room missing certified blanking play.
Action required: 10 - Deficiency Rectified
Due 6 June 2022
Resolved 6 June 2022
Resolution: Corrected on the spot

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.